Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Staggered Parallel Cut in Small Headings the Most Cost-Reducing Alternative to All Other Cuts in Mechanized Drifting

    By Max Pena Woolcott, Winfried Rosenstock, Maria Chappuis, Walther Hennig

    "In a Peruvian-German Technical Cooperation project for the Mining Sector the ""Milpo-cut"" along with the electric initiation system has been successfully implemented in a Peruvian metal-ore mine.Spe

    Jan 1, 1994

  • ISEE
    Determination of the Precise Origins of Air Overpressure Generated from Production Blasts at Melton Ross Quarry

    By C E. Johnson, S Hosein

    Previous researchers have put forward two different theories as to the origin of air overpressure from quarry blasting. In 1980, Siskind et al postulated that the initial face movement gave rise to th

    Jan 1, 2017

  • ISEE
    Dispersion Signal Analysis in a Split-Hopkinson Pressure Bar at the University of Kentucky

    By Jhon Silva-Castro, Russell Lamont

    Understanding the behavior of materials subjected to high strain rate conditions is of fundamental importance to the mining industry. Several stages of the mining process involve high speed loading ra

    Jan 1, 2017

  • ISEE
    Low Temperatures Limits for Mixing Recycled Oil, Diesel Fuel, and Ammonium Nitrate to Make ANFO-Type Blasting Agents

    By Thomas C. Rube, T S. Bajpayee

    The Bureau of Mines conducted research to determine the safe operating conditions for using recycled (used) lubricating oil from mining equipment as a partial replacement for diesel fuel to make ANFO-

    Jan 1, 1996

  • ISEE
    A Mine-to-Crusher Framework for Aggregate Operations

    By Diogo Fonseca, José Manuel, Nuno Fernandes, Blessing Taiwo

    This research focuses on enhancing the synergy between blasting and primary crushing operations in quarries. A blast operation at dstgroup aggregate quarry in northern Portugal was simulated to fine-t

    Jan 21, 2025

  • ISEE
    Improving open-pit blast design through rock hardness estimation and prediction based on Measurement-While-Drilling data: Applications in large copper mines in Chile.

    By Sebastián Seria, Jorge Álvarez, Diego Cáceres

    The capacity to break the rock into adequate size fragments and in a cost-effective way is one of the main challenges in large open pit copper mines in Chile. That capacity is often compromised by the

    Jan 26, 2026

  • ISEE
    Modern Underground Raise and Slot Design

    By N. Rouse

    Underground raises and slots are a vital part of underground blasting operations. Raises and slots are vertical shafts or openings used for ventilation, ore passes, or creating voids in stopes. In the

    Jan 1, 2024

  • ISEE
    Oversize Reduction Project at the Iron Ore Company of Canada (Full Article)

    By Rodney Pinksen, Remi Proulx

    The IOC Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1.0 m x 1.0 m x 1.0 m; 39 inches x 39 inches x 39 inches) being produced and its subsequen

    Jan 1, 2011

  • ISEE
    The Influence of Electronic Delay Detonators on Vibration Fragmentation, Heave and Blast Throw

    By AJ Rorke

    Blasting trials using Daveytronic Electronic Delay Detonator systems (EDD’s) were conducted at the Alpha Ferro Quany (Pretoria) and the Eikeboom Colliery near Witbank in November 1999. The objectives

    Jan 1, 2000

  • ISEE
    Mining Cost Optimization Strategy Based on Adaptive Blast Design

    By Huang Daguang, Paulo Couceiro, Juan Navarro

    Mining is typically conducted through a set of interdependent unit-operations, which commonly include drilling, blasting, digging and hauling, in order to deliver the required ore material into the co

    Feb 6, 2023

  • ISEE
    Improved Remediation Performance of a Contaminated Basalt Aquifer by Blast Fracturing

    By Adrian Moore, Bryan Goodwin, David Fales, David Lam

    This paper describes the development of blasting protocols used to successfully create a 450m long blast fractured permeable trench in a basalt aquifer up to 20m thick, at a petrochemical facility in

    Jan 1, 2011

  • ISEE
    Flyrock Control - By Chance or Design

    By Adrian J. Moore, Alan B. Richards

    Responsible blasting requires that rock throw be controlled to ensure that no danger will result to people and property. This paper describes the development and testing of empirical field calibrated

    Jan 1, 2004

  • ISEE
    High Performance Ionomer Polymers for Non Electric Shock Tubes

    By K. Hausmann, W. Whelchel

    The properties of ethylene Ionomer resins for the inner layer of non-electric shock tubes will be discussed in detail, and opportunities for property enhancement will be pointed out. A stiffness progr

    Jan 1, 2010

  • ISEE
    Emulsion Breakers for Waste Explosives

    By Maja Franjic, Ian Tolliday, Chris Collins, James Wiltshire

    Ammonium Nitrate Emulsions (ANE) are a large segment of the explosives market for the mining industry. These emulsions are generally designed to be very stable but when breakdown does occur, removal o

    Jan 21, 2025

  • ISEE
    Shock Physics Analysis of Air-Deck Behavior during Rock Blasting

    By Ruilin Yang

    This paper provides a theoretical analysis of shockwaves in an air-deck induced by detonation of an explosive charge and shows that the initial shock pressure in the air-deck at the interface with the

    Jan 1, 2016

  • ISEE
    Impact of Blasting Sequence on Dilution and Benefit Through Ore Displacement Control Using Three-Dimensional Modeling

    By Paulo C. Fernández A, Sergio Matamala V, Claudio C. Gajardo, Christian A. Rees P

    In fragmentation processes in open-pit mining, it has been observed that there are many opportunities for improvement if greater control of ore displacement in blasting is achieved, reducing the perce

    Jan 26, 2026

  • ISEE
    Experimental Method to Evaluate the Vibrational Behavior of low Energy Explosives and Their Impact on Slope Damage Control

    By P. Lozada

    The objective currently demanded from controlled blasting techniques is to minimize damage to the remaining rock mass while protecting the integrity of mine walls and ensuring the quality of the fragm

    Jan 1, 2024

  • ISEE
    Comparison of Micro-Inch In-Plane and Out-of-Plane Resoponse of Cracks to Blast Vibration and Weather

    By Jeffrey Meissner, Mike Waldron, Charles Dowding

    Most studies of crack response have focused on opening and closing of a crack in the plane of the wall in which the crack occurs. Crack movement also occurs perpendicular or normal to the plane of the

    Jan 1, 2010

  • ISEE
    Low Level Continuous Vibration and Potential Damage

    By Edward J. Jr Walter, Edward J. Walter

    The vibration problem is approximately fifty years old. The original investigation of the U.S. Bureau of Mines was begun in 1930. Significant investigation into the problem was done by Crandell, Lange

    Jan 1, 1979

  • ISEE
    Underwater Explosions: Natural Resource Concerns, Uncertainty of Effects, and Data Needs

    By Marion Smith, Thomas M. Keevin, Dennis G. Wright, Gregory L. Hempen, Joel B. Gaspin, Thomas L. Linton, Gregg R. Gitschlag

    "A Natural Resources Working Group, within the International Society of Explosives Engineers, reviewed published environmental effects data, identified data gaps, and prioritized data collection needs

    Jan 1, 1999