Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Controlling Backbreak with Proper Borehole Timing

    By Calvin J. Konya

    Backbreak behind the last row of boreholes can be a significant problem for blasting operations. Backbreak will interfere with the proper drilling and execution of the subsequent shot and can produce

    Jan 1, 1987

  • ISEE
    Explosives & Accessories Used in the Isthmus of Mexico to Break Up & Fissured the Lime/Stone/Sulphur Strata

    By Antonio S. Aldana Selders

    With special designed explosive and a system to lower down a heavy load of Explosives through 8" pipe results are achieved, the stimulation of sulphur production takes place. Well # 18-1063 at 515 met

    Jan 1, 1995

  • ISEE
    Considerations for Drill and Blast Excavation of a Geologic Repository for the Disposal of High-Level Radioactive Nuclear Waste at Yucca Mountain

    By Norman Kramer, Roger Keller

    The authors would like to thank Austin Powder Company for their technical support and input, specifically Stephen Harris, Jason Ryan, and John Capers of Austin Powder, without whose support this paper

    Jan 1, 2000

  • ISEE
    New Horizons for the Electric Motor Driven Oil Cooled Rotary Screw Compressor in Construction and Mining Applications

    By Henry P. Van Ormer

    This paper is written to outline the capabilities and flexibility of the electric motor driven oil cooled rotary screw air compressor in construction and mining applications. With the changing economi

    Jan 1, 1976

  • ISEE
    Discovery, Analysis, and Elimination of Instantaneous Misfires in Underground Production Blasts (2000 International Society of Explosives Engineers)

    By Norman Disley, David B. Counter, Lionel Hebert

    Misfires in underground and surface production blasts can be costly. Costs can arise from loss of resource, production interruptions, having to redrill or otherwise refire the blast (a hazardous proce

    Jan 1, 1996

  • ISEE
    Blasting Over 40 Feet of Toe Burden - A Case Study to Outline Modern Planning Techniques

    The use of angled shot holes can be extremely effective in blasting faces that either have a great deal of toe burden or where it is difficult to give a drill access to a face due to backbreak and fac

    Jan 1, 1994

  • ISEE
    The Renovation of Theodore Roosevelt Dam

    By Tom Hanke, Joe Strobbe

    The 80 year old Theodore Roosevelt Dam built in a scenic canyon near Globe, Arizona is currently undergoing a major renovation. The old stone dam, built by hundreds of skilled stonemasons, is being co

    Jan 1, 1993

  • ISEE
    Blind Hole Raise Blasting at the Homestake Mine

    By Justus Deen, Paul V. Sterk

    Through the 119 year history of the Homestake Mine various methods of raise mining have been used, these include conventional, bored, and drop raises. These raises provide passage for men and supplies

    Jan 1, 1996

  • ISEE
    Journal: Safety Talk / Blast Area Security

    By W. Reisz

    Blast area security is the responsibility of everyone involved in the blasting operation and goes well beyond simply controlling access by unauthorized personnel.

    Jan 1, 2009

  • ISEE
    Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit Pump

    By Stuart Brashear, Steven Bell, Donald Smith

    This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede

    Jan 21, 2025

  • ISEE
    Should Blasthole Subdrilling be Loaded with Explosives

    By Norman S. Smith, Troy D. Harris, Richard L. Ash

    In open-cut bench blasting drilling boreholes below grade level is normally considered essential to insure toes do not remain. The extra drilling and use of explosive below floor level are not only ex

    Jan 1, 1978

  • ISEE
    Utility Blasting Using Atlas's Two-Component Explosive Kinepak

    By Carl E. Jones

    This presentation discusses the properties of the two-component explosive, KinePak, and how it is used by the utility industry.

    Jan 1, 1978

  • ISEE
    Computer Design and Field Application of Sub-Seam and Multi-Seam Blasts in Steeply Dipping Coal Seams

    Coal strip mine operators in Western Canada often mine steeply-dipping multiple coal seams in mountainous terrain. The ability to fragment the rock waste layers above and below these seams with minimu

    Jan 1, 1985

  • ISEE
    2000 Blasting in the New Millennium - The Blasting Log An Essential Witness of Professional Blasting Part 1

    By Steve Dillingham

    The origin of the written blasting log or shot report can likely be traced back to the earliest annals of blasting and record keeping. These records were, for the most part, a way of checking inventor

    Jan 1, 2002

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • ISEE
    The Development of a New Cable Cutting Device

    By Richard B. O'Meara

    "The demand by a customer to an Explosives supplier to fulfill a specialised productrequirement was met by a level headed decision to try to satisfy that demand. This paperwill describe the fundamenta

    Jan 1, 1993

  • ISEE
    Improving Geologic Knowledge with IOT Sensors on Blasthole Drills

    By Steven Putt

    The paper presents new results from Datacloud during recent Seismic While Drilling trials in iron ore, metallurgical coal, and hard rock mines around the world. The measurements are compared with wire

    Feb 1, 2020

  • ISEE
    Quantifying Shovel Performance Through Blast Pattern Boundaries

    By K. Taylor

    In surface coal mining, the performance of a shovel through blasted muck is one of the key performance indicators of the blast. Historically, performance has been measured qualitatively based on opera

    Jan 1, 2024

  • ISEE
    A Blast Vibration Prediction and Data Storage Computer Program

    By Jerry W. Schweiker

    An extensive computer program has been developed which will store and analyze pertinent blast related parameters such as date, time, shot coordinates, charge, delay times, etc. In conjunction with the

    Jan 1, 1984

  • ISEE
    Relating Horsepower to Drilling Productivity (315b5cd4-5d8d-4d24-b315-826af9c6ec5d)

    By Brian Wingfield, Rick Givens, Greg Williams

    Many technological advancements have been made in explosive products and applications over the last 15 years resulting in productivity and cost gains. However, the applications of total energy (engine

    Jan 1, 1996