Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Backfill practice and technology at Kidd Creek Mines
By T. R. Yu, D. B. Counter
"Kidd Creek Mines primarily employs sublevel blasthole stoping for underground mining operations. During pillar recovery in No.1 Mine and panel mining in No.2 Mine, the free standing fill exposures ma
Jan 1, 1983
-
A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves
By D. Hatfield
"Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting
Jan 1, 2013
-
Distributed Digital Control of a Flotation and Grinking Circuit at the Kidd Creek Concentrator
By O. Matwijenko
"The Kidd Creek concentrator is located twenty-six kilometres east of Timmins, Ontario, within a metallurgical complex including a 109,000 MTPY zinc plant and a new 59,000 MTPY copper smelter and refi
Jan 1, 1980
-
Column Flotation Experience at the Sarcheshmeh Copper Mine
By S. Banisi, M Nesari, J. A. Finch, N. Nobari, H. Javani
"The flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. Mechanical flotation cells are used in all sta
Jan 1, 2000
-
A Possible Role for Pyrite in the Reductive Pyro De-Arsenification of Enargite
By Yanping Xiao, Ton van Sandwijk, Gus Van Weert, Larry McHugh, Thomas Zabev
"All attempts to remove significant amounts of arsenic from enargite via neutral or reductive pyro routes have required operating temperatures between 600 and 700 º C, too high to propose an equipment
Jan 1, 2014
-
Research and Development for an Ultra-Low Profile LHD
By Patrick F. R. Murphy
An ultra-low profile LHD has been developed by EJC Mining Equipment of Burlington, Ontario for narrow-reef mining applications. This paper discusses the challenges encountered during the evolution of
May 1, 2004
-
Paste Fill Design at the Louvicourt Mine
By Pierre Lacombe
"The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be
Jan 1, 1995
-
Accounting for Dilution in Ore Resource Estimation
By Mario E. Rossi
The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization
May 1, 2009
-
"Re-Os Model Age Constraints on the Genesis of the Moss Molybdenite Pegmatite-ApliteDeposit, Southwestern Grenville Province, Quyon, Quebec, Canada"
By Robert A. Creaser, David R. Lentz
Abstract - The Moss molybdenite deposit, which was mined during both world wars, is hosted in late Grenvillian granitic pegmatite dikes. These dikes are locally aplitic, and intrude the late tectonic
Jan 1, 2005
-
Freeport McMoran El Paso Refinery Steam Control
By Bradford C. Wesstrom, Ricardo Parra
The Freeport McMoRan El Paso Refinery uses co-generation to produce some of its electricity and all of its steam. This paper will cover the operation of the co-generation plant natural gas turbine at
Jan 1, 2019
-
Effect of Acid Laden Mining Effluent on Characterization and Physio-Chemical Behaviour of Clayey and Sandy Soil
By V. Murugaiyan
The Geotechnical Engineer is faced to view problems emerging from the task of protecting the environment and also the problems related to prevention of natural hazarders. Geo-Environmental Engineering
May 1, 2004
-
Luscar Mine
By J. Keith Haddock
"The Luscar Mine is a metallurgical coal mine located in the foothills of the Canadian Rockies, 41 km southeast of Hinton, Alberta. The mine is operated by Cardinal River Coals Ltd., a 50/50 joint ven
Jan 1, 1985
-
Productivity improvements for dragline operations using controlled blasting in a single- and multiple-seam opencast coal operation at Rietspruit, South Africa
By W. A. Crosby, W. K. Smith, K. L. McDonald
"IntroductionThis paper describes how the introduction of two blasting techniques and the resuItant development of new dragline digging methods have increased the productivity of single- and double-se
Jan 1, 1983
-
Concepts for Co-Mixing Waste Rock and Tailings
Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.
Nov 1, 2002
-
Geothermal Technology and Resources for Active Mines
By Jasmin Raymond
Ground source heat pumps are used to heat or cool building and heat water supply. Such heat pumps use the earth as a heat source or sink to efficiently provide or store thermal energy. For example, a
May 1, 2007
-
The Intec Zinc Process
By J. Moyes
The Intec Process is a generic process for the production of pure base metals and precious metals from sulphides concentrates derived from copper, nickel, zinc and lead ores. The development program f
May 1, 2002
-
Flotation Behavior and Mechanism of Chalcopyrite and Galena in Presence of O-Isopropyl-N-Ethyl Thionocarbamate
By Yongjie Bu, Wei Sun, Zhiyong Gao, Yuehua Hu, Hongbiao Tao, Runqing Liu, Central South University
"The flotation behavior of O-isopropyl-N-ethyl thionocarbamate (IPETC) and pH for chalcopyrite and galena was studied through pure mineral test, adsorption quantity determination, solution chemistry c
Jan 1, 2016
-
Use of the Latest Technology to Overcome the Demands of Mill Operation
By Tatiana Ravani von Ow, Leandro Bomvisinho
"The size of mills driven by ring-gear or by a gearless solution has significantly increased in the last years. This has created additional challenges for the driven equipment. The requirements for th
Jan 1, 2010
-
Geotechnical monitoring of tunnel boring machine drivages at the Donkin-Morien Mine, Nova Scotia
By T. R. C. Aston, C. M. K. Yuen, J. L. Gilby
"The access tunnels for the Donkin-Morien Mine in Cape Breton, Nova Scotia, comprise two parallel tunnels driven through a sedimentary sequence of sandstone, siltstone and mudstone to intersect the Ha
Jan 1, 1988
-
Treatment of Thompson Copper/Arsenic Residue
By T. Xue, A. Singhal, D. Wrana, I. Mihaylov
"At Vale's Thompson Nickel Refinery, the copper and arsenic in the nickel electrolyte are removed by precipitation using H2S, generating a sulphide precipitate containing about 40% Cu, 8% Ni, 2 to 4%
Jan 1, 2012