Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Case Study into the Treatment of Low Grade Austalian Gold Ores Heap Leaching vs Carbon-in-PulpBy Noakes MJ, Willsteed TV
In the past few years an elevated gold price has resulted in the evaluation of many small scale surface gold deposits in Australia typically containing about 2-3 g/t Au. Operators have tended to assum
Jan 1, 1984
-
Adoption of an Integrated Mine Water Management Approach Provides Environmental, Social and Economic BenefitsBy R Vleggaar
In addressing a short-term operational need for the relocation of a tailings storage facility reclaim pond, a mine has achieved a host of water management objectives. Through effective planning and ad
Jan 1, 2006
-
Analysis of Gases and Airs from CollieriesThe Coke Ovens Laboratory at Australian Iron & Steel, Port Kembla has been involved in the analysis of seam gases and mine airs for approximately twenty (20) years. This period has seen many develo
Jan 1, 1983
-
Overview of a Quality Management System for 42 Million Tonnes Per Year of CoalSASOL Synthetic Fuels has recently completed the design of sampling systems for raw and blended coal feeding the gasifiers at Secunda, South Africa. The new systems will replace manual, stopped belt s
Jan 1, 2002
-
Design of Paste Backfill Plant and Distribution System for the Cannington ProjectSafety bulletins and stickers issued for the paste backfill plant at Cannington read as follows: æCannington Paste Fill Plant, First of ItÆs Kind in AustraliaÆ. We could even dare to state that the Ca
Jan 1, 1998
-
A design and construction methodology for deep mine developmentBy E Villaescusa, C Drover
The stability of access tunnels is one of the main engineering challenges in deep underground mine construction. Many underground hard rock mining operations are now reaching depths where the induced
Nov 29, 2022
-
Engineering for Mining InfrastructureInfrastructure is defined as all those parts of a mining development which are not directly concerned with mining and mineral processing. Infrastructure is of significant and growing importance in
Jan 1, 1974
-
Mount Isa Mines Limited Heavy Medium Preconcentration Plant- Six Years after CommisioningBy Pease JD
This paper reviews the changes in operating practices made in the heavy medium plant to meet the objectives of increased silver, lead and zinc production at lower operating cost. The effects of medi
Jan 1, 1988
-
Evolution of Colliery Winding EnginesThe object of this paper is not to describe any particular type of engine in close technical detail but rather to give a general picture of past and present practice in this important section of the i
Jan 1, 1945
-
Industrial Scale Results from Shear Enhanced Thickening TechnologyBy I Arburthnot, N Lawler, C Loan
The function of a thickener is to optimise and accelerate the process of gravity sedimentation. The desired end product (be that maximised concentrated solids or clarified liquid) determines how the t
Oct 29, 2012
-
The Practical Design of a Hydraulic HoistThe intention of this work was to con struct a machine on a pilot scale which could hoist a mixture of ore and water through a height of 300 metres and to operate the mach- ine to determine the para
Jan 1, 1973
-
Water Management Systems in Australian MinesBy Gillies A. D S
Replies to a comprehensive questionnaire on mine water resource management systems (WRMS), which were distributed to a selection of Australian mining operations in 1991, are analysed. Although the rep
Jan 1, 1995
-
Effects of Ultrafine Desliming on Coal Flotation CircuitsBy G H. Luttrell
The use of secondary desliming cyclones ahead of froth flotation cells to reject ultrafine (-45 ¦m) particles has become a popular option in the United States for preparing fine coal feeds for froth f
Jan 1, 2005
-
Assessment of the Explosibility of Gas Mixtures and Monitoring of Sample-Time TrendsPrevious methods for the assessment of the explosive potential of gas mixtures have required the plotting of apeexplosibility diagram. These became cumbersome if a large -number of assessments of
Jan 1, 1981
-
The Impact of Controlled Blending at the Leinster Nickel ConcentratorBy Johnston S
A blending trial was conducted on 60 per cent Perseverance/40 per cent Rockys Reward underground ore at WMC Resources Leinster Nickel Operations to compare the benefits between batching and blending
Jan 1, 1997
-
Some Aspects of the Carbonaceous Fraction of Mount Isa Lead ConcentrateBy Harraway D. H, Draper N
The association of graphite with a fine grained pyrite in the Mount Isa lead-zinc ore was investigated from mineralogical and metallurgical standpoints. The pyrite has been partially or completely rep
Jan 1, 1961
-
Experiences with Computer-Based Monitoring Systems in Polish Coal MinesA modular computer-based monitoring system for mines is dis-cussed. The system consists of the following modules : production moni-toring system HADES, methane monitoring system CMC, seismoacoustic an
Jan 1, 1985
-
Continuous Improvement at Pasminco Metals - SulphideBy Coates J. R, Firth I. C
The Imperial Smelting Furnace at Cockle Creek, NSW, was constructed in 1961 and is the oldest facility using the Imperial Smelting process in operation. In recent years there have been significant i
Jan 1, 1993
-
Automatic Ore Texture Analysis for Process MineralogyGeologists often classify ore textures on the basis of the origin of the rock in which they form and the grade of one or more minerals within the ore (Sinclair and Blackwell, 2002, pp 32-36). Me
Jan 1, 2008
-
A Formal Approach to Economic Analysis of Pit Slope DesignBy Coates D. F, Neil T. J, O&apos
A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risks of slope fail- ure inherent in steeper slope angles. However, no formal framewo
Jan 1, 1977