Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Automated Sampling of Iron Ore for Analysis at the Saldanha Iron Ore Terminal in South AfricaBy P Hofmeyr, D Pretorius
Iron ore, which is transported by rail from the iron ore mines at Sishen in the Northern Cape, to the Saldanha Iron Ore Terminal in the Western Cape, needs to be analysed while loading to be exported.
Aug 21, 2012
-
Physical and Chemical Evolution of Placer Gold Deposits During Rise of Antiformal Ranges, Central Otago, New ZealandBy D Craw
Quaternary warping and uplift of antiformal schist ranges in Central Otago, New Zealand, has resulted in recycling of alluvial gold from widespread, generally weakly auriferous, Miocene fluvial gravel
Jan 1, 1995
-
Competition for AustraliaÆs Diminishing Water Resources ù Agriculture Versus Industry Versus EnvironmentBy J Williams
The recent drought has highlighted the finite nature of AustraliaÆs divertible water resources. According to AustraliaÆs recently completed National Land and Water Resources Audit, development of wate
Jan 1, 2003
-
The Structural and Hydrodynamic Framework for Epithermal Exploration (2963b0f0-6ca9-48f5-bafb-06fd586f730b)By Etheride MA
The evolution of economic precious metal and copper-gold deposits in high-level igneous terranes is dependent on very efficient fluid focussing. This is most readily achieved by contemporaneous defor
Jan 1, 1995
-
Implementation and Feasibility of Remote Controlled Blast Hole Drilling at KCGM Æs Fimiston Open PitsBy P Jago
KCGMÆs Fimiston Open Pit, located in the centre of the historic Golden Mile, is situated above some 3000 kilometres of old underground workings. These workings, both level and vertical, present signif
Jan 1, 2003
-
Mine Geology from a Geotechnical PerspectiveThis paper addresses the role of mine geology in mining geotechnics. The role is assessed and discussed in terms of five main elements; geotechnical complexity, geological complexity, mine scale, perc
Jan 1, 1993
-
The Past Focuses Support for the FutureThe history and milestones in the evolution of support systems utilised in the mass-mined chrysotile mines of Shabanie and King are discussed in detail. The use of block caving, false footwall or subl
Jan 1, 2000
-
Theoretical and experimental approaches to determine the mass transfer coefficient in the steel/slag/refractory systemBy S K. Michelic, M Schickbichler, A Kharicha, E Karimi-Sibaki
The requirements for the controllability of metallurgical processes are increasingly becoming the focus of both industry and research. Advances in this field of research not only impact the stability
Aug 21, 2024
-
Economic Aspects of Carbon-in-Pulp Plant DesignThree key areas of C.I.P. plant design, viz. leach- ing time, adsorption and the gold loading on the carbon, are discussed and illustrated with examples. The need for accurate pilot plant data for u
Jan 1, 1982
-
Weighing of Open Cut MachineryAn improved technique for the quick and accurate measurement of the weight and centre of mass in the horizontal plane of large machines has been developed. On-site weighing of large plant such as bu
Jan 1, 1989
-
Evolution of Mining and Current Practices in the Prince Lyell Orebody, Mount Lyell Mining and Railway Company LimitedBy Kennewell G. J
This paper aims to present the evolution of the mining method in the Prince Lyell orebody. Initial strategy and practical experience are detailed as are the reasons for and benefits of changes to the
Jan 1, 1992
-
Safety Culture and Resilience Engineering - Exploring Theory and Application in Improving Gold Mining SafetyContemporary approaches to safety management appear to be failing short of meeting its mark in improving mine safety. This is evidenced by the high workers compensation, high incidence rates and fatal
Aug 1, 2010
-
Open Stope Mining Strategies at Brunswick MineBy P Andrieux
By 1996 ground control-related problems at Brunswick Mine had raised serious concerns regarding the safe and economical extraction of large portions of the reserves. These difficulties were mainly cau
Jan 1, 2000
-
Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997By A G. Greenwood
Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include t
Jan 1, 1998
-
Rosebery û Ore reserve Estimation, Past and PresentThe Rosebery Mine on the west coast of Tasmania is a world class polymetallic base metal deposit, containing six major minerals: galena, sphalerite, chalcopyrite, gold, silver and pyrite. This resourc
Jan 1, 1990
-
The Application of Rock Engineering Systems to Block Caving to Identify the Effective ParametersBy M Mohammad Khani
An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES
May 9, 2016
-
Water Issues in DOZ Block Cave Mine, PT Freeport IndonesiaBy E Widijanto, A Srikant
PT Freeport Indonesia operates a copper-gold mine located in the remote highlands of Papua, Indonesia, about 3500 km east of Jakarta. Currently, the district produces about 240 000 tonnes per day (tpd
Jan 1, 2006
-
Innovations in PAL-Applications - Redesign of Conventional Cyanidation PlantsDegussa's PAL-system (peroxide assisted leach) has been proven to be more economical than the conventional cyanidation technique. Significant in- creases in the gold recovery have been reported,
Jan 1, 1991
-
The Downward Trend of Mining - Infrastructure CostsBy Glassock C. D
Most Australian mining projects are becoming smaller, more remote and with lower grades of ore. Their small size has been making it harder for mining companies to absorb the large infrastructure co
Jan 1, 1997
-
Maximising the Capacity of the Ore Handling Systems at Xstrata CopperÆs Mount Isa Copper OperationsBy G W. Croft, L E. Krause
The current copper ore handling systems in use at Xstrata CopperÆs Mount Isa Copper Operations are up to 33 years old and have hoisted over 160 Mt at a rate of around 6 Mtpa. The mineÆs production pro
Jan 1, 2005