Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recovery of the northern mining block at Cliffs Nickel Mine

    By M Hopkins, A Mutale, A E. Vidal da Silva

    The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block

    Mar 15, 2021

  • AUSIMM
    CHPP waste pumped co‐disposal – some myths and truths

    By S J. Henderson

    Pumped co-disposal of coal processing waste was promoted in the 1990-2000s as a low-cost highperformance alternative to tailings dams. In particular it would avoid high up-front capital for rejects tr

    Jul 1, 2021

  • AUSIMM
    Challenging the Norm – Alternative Excavation Method in Mining

    By R Burke, G Ramage, C Donnelly

    Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde

    Mar 24, 2014

  • AUSIMM
    Effects of Joint Intensity on Rock Fragmentation by Impact

    By K Esmaeili, S Aziznejad

    Impact-induced rock fragmentation is a mechanism that is commonly used for rock breakage in drilling and crushing. Additionally, rock fragmentation by blasting is frequently used in rock excavation op

    Aug 24, 2015

  • AUSIMM
    Brecciation, Mineralisation and Alteration of the Kidston Gold Deposit

    The Kidston breccia pipe is situated approximately 280 km west northwest of Townsville, north Queensland. It is currently Australia's largest gold producer with production varying between 8,0

    Jan 1, 1987

  • AUSIMM
    Strip and Line versus Blind Sink Shaft Sinking – The Ernest Henry Decision

    By C J. Carr

    The Ernest Henry Mine (EHM) is owned and operated by Xstrata Copper and is located in North-West Queensland, Australia. The mine is currently undergoing a transition from an 11 Mtpa open pit mine to a

    Mar 21, 2011

  • AUSIMM
    The Broken Hill Proprietary Company Limited (Iron and Steel Works)

    By Kirkhouse C. B

    Soon after the Broken Hill Limited started operations at their Iron and Steel Works at Newcastle, NSW, it was found necessary to install a mill for rolling small merchant bars, rounds, etc.An arrangem

    Jan 1, 1935

  • AUSIMM
    Deep Well Pumping as an Aid To Shaft Sinking

    MR. L. C. BALL, chief government geologist, Queensland, wrote: This paper is intended as a severely mechanical exposition of the means adopted to deal with tremendous inflows of water concurrently wit

    Jan 1, 1939

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    Using Value at Risk for Integrated Project Risk Evaluation

    By W Stange

    Assessing the risks in a mining project is a key aspect of project evaluation. This is an exacting and demanding task because of the complexity due to the need to deal with uncertainty over long time

    Jan 1, 2009

  • AUSIMM
    A study of heat and material balances in direct reduction plant with various conditions

    By H Kim, M J. Sun

    Global steel companies are actively combating climate change by reducing carbon emissions. Traditional steel production, using the blast furnace (BF) – basic oxygen furnace (BOF) process, heavily depe

    Aug 21, 2024

  • AUSIMM
    Extending the U5 in Berlin via a Shield Driven Tunnel

    By F Anthes, U Barow

    Two tunnels are being bored using a æHydroshieldÆ in section 3.1 of the extension of the Underground railway line 5. At the end of the two tunnels, directly in front of the Hotel Adlon, the shields ca

    Jan 1, 1999

  • AUSIMM
    Rheological Controls on the Geometry of the Currawong Volcanic-hosted Massive Sulfide Deposit, Lachlan Fold Belt, Victoria, South-east Australia

    By D Macklin, R Hammond, T G. Blenkinsop

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Base metal sulfides at the Currawong volcanic-hosted massive sulfide deposit in the Lachlan

    Mar 18, 2015

  • AUSIMM
    Grasberg Porphyry Copper-Gold Deposit, Papua, Indonesia - Structural Setting and Hydrothermal System

    The Ertsberg (Gunung Bijih) Mining District is located in the core of the highlands of west New Guinea, an island long recognised as the product of a Cenozoic arccontinent collision. Geologic studies

    Jan 1, 2008

  • AUSIMM
    Stope Cleaning - Historical Methods

    In classical drill and blast underground mining methods, especially narrow vein operations economic quantities of broken ore can be left behind following normal mucking operations on the stope floors.

    Aug 1, 2010

  • AUSIMM
    Implications of the Carbon Price and Developing a Carbon Strategy

    By P Holt, M Allen

    On the first of July, 2012, the Australian GovernmentÆs Clean Energy Act commenced. From this point, a price of $23/t of CO2-e will apply to facilities that trip the liability threshold. This first pa

    Nov 20, 2012

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012

  • AUSIMM
    Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility Study

    The Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of appr

    Jan 1, 2008

  • AUSIMM
    Dissolution of Particulate Carbon in a Turbulent Iron Bath

    By Denholm WT

    The main objective of the experimental study was to investigate the dissolution kinetics of various forms of carbon under iron bath converting or smelting-reduction conditions, i.e., particulate,

    Jan 1, 1984

  • AUSIMM
    The Influence of Primer Size on Explosive Performance

    By Torrance AC

    A joint research programme conducted by BHP Central Research Laboratories and Du Pont Wesfarmers Pty Ltd examined the effect of the size of cast primers on the run up and steady state detonation vel

    Jan 1, 1988