Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Use of Metallurgical Test Data in Resource Evaluation for Magnetite DepositsBy J N. Farrell
Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge
Jul 11, 2011
-
The Cannington DepositBy Thomas MJ
The Cannington silver-lead-zinc deposit is located at latitude 21¦ 52' 9" South, longitude 140¦ 55' 10"" East, on the south-eastern margin of the Proterozoic Mount Isa Block (Figure 1), 135
Jan 1, 1993
-
Standardisation on rock characterisation, testing and monitoring with emphasis on ISRM suggested methods, practical issues and difficulties, and future trendsBy R Ulusay
Rock mechanics involves characterizing the mechanical properties and behaviour of rock material and the natural discontinuities of the rock mass, while rock engineering is concerned with specific engi
Nov 30, 2018
-
Identifying and Dealing with Outliers in Resource EstimationBy C De-Vitry
In skewed distributions seen in many geochemical data sets, samples at the extreme ends of the distribution are often termed ‘outliers’. Samples considered as outliers can often make exploratory data
Aug 18, 2014
-
The Measurement, Evaluation, and Control of Dust and its Effect on the Health of Workers in the Mining Industry in Western AustraliaThe medical evaluation of the health effects of dust exposure in the mining industry should be based on the premise that the results of the medical examinations will be considered in relation to t
Jan 1, 1979
-
Breakthrough in elliptical motion screen trial delivers significant performance gainsBy D Teyhan, J Kirsch
Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive
Nov 8, 2021
-
Resources and Reserve Assurance Processes – a Framework for Improved GovernanceBy L J. de Lange
As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur
Jun 22, 2016
-
Breakthrough in elliptical motion screen trial delivers significant performanceBy D Teyhan, J Kirsch
Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive
Aug 24, 2022
-
Training our New Starters – Between a Rock and a Hard PlaceBy M Davis
Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested
Aug 22, 2011
-
An Interpretation of Tracer Results from an Operating Blast Furnace by a Dispersion ModelBy Polthier K
A short discussion of the salient aspects of a dispersed flow model in relation to the gas flow in blast furnaces is given. The use of the theory in assessing vessel performance is mentioned. Tracer
Jan 1, 1975
-
A quantitative risk assessment tool for geothermal outbursts at Lihir Gold MineBy M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr
Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the
Nov 29, 2022
-
A new insight into standardisation of Mine IoTBy i, A Shirbazo, S Saydam, S Ata, H L. Ram, B Li
The integration of internet technology into industrial sectors has significantly accelerated the adoption of Internet of Things (IoT) devices, transforming communication, data aggregation, and informa
Sep 1, 2024
-
Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, AustraliaBy T J. Sullivan, H Pinkster, G Swarbrick
From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o
Nov 5, 2014
-
Optimising Carbon Management – Increasing Gold Recovery and Decreasing Costs with the Carbon ScoutBy T D. H McGrath, O Baker, W P. Staunton, C Ypelaan
"The carbon-in-pulp process has been used extensively in the gold industry since the late 1970s to recovery leached gold from solution. Despite more than 30 years of experience in operating carbon cir
Oct 10, 2016
-
The Removal of Cobalt from Zinc Sulphate Electrolytes Using the Copper-Antimony Process: Kinetics, Mechanisms and Morphological CharacterisationBy Gonzalez-Dominguez J. A, Dreisinger D. B
At Cominco's Zinc Refinery at Trail, British Columbia impurities are removed from zinc sulphate electrolyte by a two-stage purification process using zinc dust. Copper, cadmium and thallium are
Jan 1, 1993
-
Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa MinesBy J Simpson, M Johnston
Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n
Jan 1, 2003
-
Mining Safety - The Lessons Learned but not AppliedBy J M TORLACH
Learning is an iterative process, and we might reasonably expect that after more than a century of mining during an era of sustained technological development, (following a millenium or two of unrel
Jan 1, 1992
-
The Fitzroy Aqua-Eco Health ProjectBy C Sellens, L D. Fabbro, S Vink
The Fitzroy River Aqua-Eco Health Project is a collaborative research project between the Central Queensland University, the University of Queensland and BMA. It is designed to assess the aquatic ecol
Nov 26, 2013
-
A Challenge to Equipment Manufacturers - A Highwall Mining Machine for AustraliaPotential hlghwaJl mining reserves in Australia are large, but geotechnical and operating conditions are quite different from those where highwall mining has evolved in the USA. In order to achieve sa
Jan 1, 1993
-
The Importance of Data Collection to the Blasting ProcessBy J Hutchings
An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat
Nov 8, 2011