Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Brief Outline of Mount Isa Copper Smelter

    The equipment and general smelter layout for the Mount Isa Copper Smelter were designed by engineers associated with the American Smelting and Refining Company and by Mount Isa staff engineers. The fi

    Jan 1, 1953

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Mine Environment Monitoring - So what has Changed Since Moura No 2?

    By D Cliff

    "It has been 17 years since the mine disaster at Moura No 2 Mine in Queensland. Recent disasters in the USA and New Zealand prompt the question what has changed since 1994. This paper att emptsto answ

    Jun 1, 2012

  • AUSIMM
    Boundary Classification for Automated Geological Modelling

    By P Hatherly, A Melkumyan, D Wyman

    Chemical species distributions in rock sequences can be modelled using Gaussian processes (GPs) to predict the weight percentage between known data points. This method can be improved by dividing the

    Sep 26, 2011

  • AUSIMM
    Cap Rock Blasting Improvement at Worsley Alumina

    By L Neems

    In conjunction with Orica Explosives, Worsley Alumina have managed a program of continuous improvement to their cap rock blasting over the last two years. Blasting conditions are challenging because o

    Jan 1, 1999

  • AUSIMM
    The Mineral Industry's Responsibility to the Environment - Acceptance and Performance

    For some time the-mining industry has been criticised, completely unjustifiably, by certain people who style themselves conservationists but are actually preservationists. The criticism of the minin

    Jan 1, 1971

  • AUSIMM
    Gravel Extraction from West Coast River Beds - Resource and Environmental Issues

    By D H. Bell

    The potential for extracting gravel materials from active floodplain and channel areas has been investigated for three West Coast rivers û the Grey, Inangahua and Whataroa. Studies have focused primar

    Jan 1, 2003

  • AUSIMM
    Economic recovery and upgrade of metals from middling and tailing streams

    By M Hourn, G Anderson, V Lawson, P Voigt, D Mallah

    As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flow sheets to achieve saleable concentrate become more difficult to design and construct.

    Sep 11, 2017

  • AUSIMM
    High-Grade Supergene Enriched and Exotic Copper Deposits in the Sepon Mineral District, Lao PDR

    By S Smith

    Several styles of copper (Cu) mineralisation are present at Sepon. Large tonnage, low grade skarn and carbonate replacement massive sulfide mineralisation occur within the metamorphic aureole of Permi

    Jan 1, 2008

  • AUSIMM
    Piercement Structures Formed by Metamorphic Mobilisation of the Broken Hill Orebody

    The interfaces between the Broken Hill ore lenses and the enclosing wallrocks are, on a broad scale, parallel to metamorphic layering in the wallrock gneisses and quartzites. In detail, however, the c

    Jan 1, 1976

  • AUSIMM
    The Foundation of the Institute, and its First Ten Years

    When Matthew Flinders entered in his log `This land forms the South side of the large bight; and besides projecting beyond the coast line, and being a little higher than usual is remarkable for having

    Jan 1, 1993

  • AUSIMM
    The Ashanti (Ghana) Heap Leach - Treatment of a Decomposed Schist in a Tropical Environment

    By Jaczkowski B. M, Cox T. J, Domfeh I. A, Stalker I

    Mining and treatment of gold ore in the Ashanti region at Obuasi, Ghana has been continuous for more than 100 years. Earlier production from this world class deposit can be traced far into the histo

    Jan 1, 1991

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Automated Mineralogy for Ore Characterisation and Plant Optimisation

    By Y Gu, R Fandrich

    Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat

    Jan 1, 2007

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    Dry versus Wet Magnetic Separation – Horses for Courses

    By J Elder

    Magnetic separation equipment has long been used to upgrade and beneficiate a wide variety of minerals and materials. Over the years, significant advances in both wet and dry magnetic separators have

    Oct 5, 2011

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Temporary Support Load Development Along a Longwall Face Drivage

    By Isaac AK

    The combination of shot-firing and stage loader, and a prop and bar support system is an accepted drivage method. The support configuration is based on the final prop density, and assumes relitive

    Jan 1, 1986

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    ROES« û A Low-Cost, Remotely Operated Mining Method

    By A Castleden, G Cavanough, M Kochanek, J Cunningham

    ROES« is a proposed new mining system for underground hard rock mines. Ore is accessed from within a shaft, which is located close to or within the stope, and pitched either vertical or within approxi

    Jan 1, 2008