Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Three Decades of Gold Production at the Newmont Tanami OperationsBy A Cranley, A Giblett, S Thacker
The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil
Sep 1, 2014
-
Iron Ore Ultrafines Challenges and OpportunitiesBy D Tucker, K Harney
Hatch forecasts that an increasing share of seaborne traded iron ore will be ultrafine, being either concentrate or pellet feed. This provides several challenges for the iron and steel industries, but
Jul 13, 2015
-
Average Relative Error in Geochemical Determinations - Clarification, Calculation and a Plea for ConsistencyBy C R. Stanley, D Lawie
The measurement of error in assays collected as part of a mineral exploration program or mining operation, including errors introduced during sampling, sample preparation, or geochemical analysis, his
Aug 21, 2012
-
Evaluating All the Alternatives to Select the Best Project StrategyIt is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p
Jan 1, 2007
-
Mine Data Analytics – New Skills Required for Tomorrow’s MinesBy P Knights
This paper examines the process and specialised skills required to extract insight from data routinely collected by mine operations, maintenance, engineering and environmental departments. Typical ins
Nov 22, 2011
-
Who does the Marketing in the Race for Space?This paper has been developed for æThe Race for SpaceÆ conference. It ranges over various aspects, all of which are within the umbrella of marketing. The question is posed because many engineers, tunn
Jan 1, 1999
-
Operational Measurement Management and its Database SupportBy J Tuma
Technical measurements are an integral part of research and development of new technical devices. Now they are also an integral part of production too, especially as a part of quality control systems.
Jan 1, 2003
-
Breccia Formation and It's Relation to Gold Mineralization at Mount Kasi, FijiThe Mount Kasi gold deposit in Vanua Levu represents an epithermal, high sulphur, gold-enargite system occurring within a volcanic caldera of Middle to Upper Miocene age. High level breccia pipes
Jan 1, 1987
-
Why the Mining Industry is Critical to Sustainable Development ù Greenhouse Gas Emissions Policy, a Case StudyMining epitomises the challenge of sustainable development, because few sectors have such a direct impact on the natural environment, yet few are more important to the economic and social health of al
Jan 1, 2006
-
Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in AustraliaBy W Ludlow, C Harrington
This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed
Jul 23, 2018
-
Rakeless Thickener Operation at St Ives Gold PlantThe first 12 m diameter rakeless thickener in the Australian gold mining industry was installed to treat plant tailings at the St Ives gold plant in April 2000. The plant processes approximately 3.2 M
Jan 1, 2002
-
Some Applications of Two-Colour Pyrometry to Pyrometallurgical ResearchA very sensitive high-speed two-colour pyrometer was built to measure the temperature of single particles of sulphide mineral, typi- cally 50 pm in diameter, as they burnt while entrained in a hot
Jan 1, 1984
-
The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement PlantBy Hill G
The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi
Jan 1, 1992
-
An evolution of drill hole spacing studies at Newmont CorporationBy A Jewbali, L Allen
At Newmont Corporation drill hole spacing studies are done to support the business in understanding the cost of collecting additional information (with a specific focus on drill hole sampling density)
May 24, 2023
-
Productivity Enhancements to Increase Ore Production from 18 to 36 Mt at AitikBoliden's Aitik open pit mine located in northern Sweden, will expand yearly production from 18 to 36 Mt of copper ore during 2010. The expansion includes a new concentrator located 3 km off the
May 1, 2010
-
The Business Case for Mine Closure Planning and an Overview of Anglo AmericanÆs Mine Closure Toolbox ApproachBy P R. Botha
Mining has played a significant role in human development and without the mining sector, society would not enjoy a large number of the benefits that it does today. However, mining has also carried wit
Jul 10, 2012
-
Theory of Sampling – from missing link to key enabler for process analytical technologyBy R J. Romañach
The theory of sampling (TOS) is now followed in the development of near infrared (NIR) spectroscopic methods for the pharmaceutical industry. TOS has been the guiding light for a two-step approach for
May 9, 2017
-
Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional SimulationBy J Bower
The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t
Jan 1, 2009
-
Risk-based approach for minimising tailings dam failuresBy M Barker, H Li
The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not
Jul 23, 2018
-
Stratigraphy of the Marra Mamba Iron Formation within the Chichester Range and its Implications for Iron Ore Genesis at Roy Hill - Evidence from Deep Diamond Drill Holes within the East Fortescue ValleyBy P Hawke, J Hurst, B KrapeP
Hancock Prospecting Pty Ltd (HPPL) drilled two deep diamond stratigraphic holes (ECD0001 and RHD0296) within the eastern Fortescue Valley in the Pilbara of Western Australia. Located south of the Roy
Aug 12, 2013