Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Engineering and Science in Flotation Cell Design

    By J Euston

    In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi

    Aug 8, 2011

  • AUSIMM
    Sulfidisation-Acidification-Recycling-Thickening (SART) for Complex Gold Ores

    By A Hall, D Kratochvil, P Littlejohn

    Economic recovery of gold from complex gold ores, including poly-metallic deposits, is impacted by the presence of cyanide-soluble base metals. These base metals can create both a metallurgical challe

    Sep 26, 2013

  • AUSIMM
    The Geology of the Woodcutters Lead-Zinc-Silver Mine

    By Ormsby W. R, Nicholson P. M

    Woodcutters is a polymetallic vein-style deposit hosted by sediments of the Palacoproterozoic Whites Formation which forms part of the sedimentary sequence in the central Pine Creek Geosyncline. Pas

    Jan 1, 1994

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    Development of a Cover System Design for Potentially Acid-Forming Tailings at Peak Gold Mines

    By M, C Silveira, C Ellice, D Christensen

    Peak Gold Mines (PGM), a member of the Rio Tinto Group, is an underground and open cut gold mining operation located near Cobar, NSW. A multi-phase study was initiated in 2001 in support of developing

    Jan 1, 2003

  • AUSIMM
    Investigation of Mixing and Rolling Drum Performance at Port Kembla’s Sinter Machine Through Full-Scale Sampling and Laboratory Scale Experiments

    By D Maldonado

    BlueScope Steel’s Port Kembla sinter machine underwent a major upgrade during mid-2009. The mixing and rolling drum (MRD) was thoroughly cleaned during the upgrade. Space factor measurements taken in

    Jul 11, 2011

  • AUSIMM
    Drill Blast Versus Reverse Circulation Grade Control Sampling ù A Case Study From the Mt Muro Gold Silver Mine, Central Kalimantan, Indonesia

    Mt Muro was a gold and silver mine in Central Kalimantan on the Island of Borneo, Indonesia. Aurora Gold through its Indonesian subsidiary Indo Muro Kencana owned the project. Processing commenced in

    Jan 1, 2003

  • AUSIMM
    A Review of the Applications of Tunnel Boring Machines in Mines

    By Q Gong, J Li, J Zhao, Y Zheng

    Excavation by tunnel boring machines (TBMs) offers many advantages over conventional excavation methods, in terms of safety level, working environment, advance rate and overall cost. While TBMs have b

    Sep 17, 2014

  • AUSIMM
    The Re-opening of CSA Mine, Cobar NSW

    By M Scamardella

    The CSA Mine is located at Cobar, New South Wales, where it was in continuous operation from 1966 to the time it went into receivership on 29 January 1998. When it closed it was under the ownership of

    Jan 1, 2000

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Concept and Operation of the New Conventional Cell House of Asturiana de Zinc at San Juan de Nieva, Spain

    By LefTvre Y

    In May 1991, AZSA commissioned a new conventional Cell House. This paper focuses on the major improvements introduced in the design and the construction of the equipment, machinery and control. An e

    Jan 1, 1993

  • AUSIMM
    Development of a new beneficiation plant for recovery of iron and apatite concentrates through wet tailing dams

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    With the declining of high-quality hematite and magnetite iron ore reserves and the increasing accumulation of material resulting from mining and beneficiation operations that appear as lowquality dep

    Aug 24, 2022

  • AUSIMM
    Understanding minerals in mineral processing – the basics and beyond

    By E M. Wightman, C L. Evans

    A recent survey of mineral processors undertaken as part of the International Mineral Processing Council (IMPC) Education Commission identified mineralogy as one of the key skills required for mineral

    Aug 29, 2018

  • AUSIMM
    Toward the green mining – utilisation of tailings on gold recovery in thiosulfate system

    By S Jeon, K Haga, A Shibayama, L Godirilwe, C B. Tabelin, I Park, A Buronov

    Open pit/underground mining and mineral processing can generate large amounts of waste that contains sulfide-type minerals such as pyrite (FeS2), and it can produce acid mine drainage (AMD) when expos

    Sep 1, 2024

  • AUSIMM
    Advanced Customisable Leach Columns – A New Kinetic Testing Method to Simulate Site-specific Conditions

    By J Pearce, M Barteaux, S Pearce

    The prediction of how waste materials will evolve geochemically within waste storage facilities has been the subject of hundreds of thousands of hours researched by geoscientists globally. Despite the

    Jul 27, 2015

  • AUSIMM
    Direct Estimation of Sampling Variance From Time Series Measurements ù Comparison to Variographic Analysis

    By M Paakkunainen

    Sampling is often the most critical part in process analysis. When the mean of a continuous lot, such as a process stream within a given time interval, is estimated by calculating the mean of several

    Jan 1, 2005

  • AUSIMM
    Possible Heat Stress Problems Associated with Underground Mining in the NT, with Particular Reference to Woodcutters Mine

    By Wetzeil N

    High ambient temperatures combined with high surface humidity in the north of Australia and, in particular, the northern areas of the Northern Territory can make underground workplaces relatively in

    Jan 1, 1994

  • AUSIMM
    Longwall Production - Review of Scheduling Factors and Overall Effects of Some Natural Hazards

    The results expected from a longwall face can best be estimated from the ideal production rate, determined by the capacity of the equipment and the conditions in which it is installed, the effective o

    Jan 1, 1991

  • AUSIMM
    Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation Attempts

    By E J. B van Etten

    This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le

    Oct 5, 2011

  • AUSIMM
    The Strength of Backfills Stabilised with Calcined Gypsum (c8b2fb36-9e9c-4e1a-916e-c8ad62e78d93)

    By Pigdon SP, Anderson RM

    The production of stabilised backfill at mine sites commonly uses Portland cement as the binder. Calcined gypsum has cementing properties and is cheaper to produce than cement. This paper discusses

    Jan 1, 1998