Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Grade Control at a Multi-Source Operation - Mount Isa Lead Mine, Mount IsaBy N Davies, M J. Coward, P L. Hissey
Mount Isa Mines has four mining operations in Mt Isa with the X41 and Enterprise Mines producing copper and the Lead Mine and George Fisher producing lead zinc and silver. Each stream contributes ore
Jan 1, 2002
-
Occupational Health in Mining and MetallurgyThe patterns of occupational health pro- grammes in mining and metallurgy are discussed in relation to the impact of chemical and phy- sical hazards on the health of workers in these fields. Mining
Jan 1, 1975
-
Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines LimitedBy Mercer J. K
Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission
Jan 1, 1961
-
The Ventilation and Refrigeration Design for Australia's Deepest and Hottest Underground Operation ù the Enterprise MineBy R Brake
The Enterprise Mine (EM) is located at Mount Isa and is wholly owned by Mount Isa Mines Limited (MIM). This high-grade copper mine extends from about 1000 m below surface to almost 2000 m below surfac
Jan 1, 2000
-
The Use of AuRIX<sup>«</sup>100 Resin for the Selective Recovery of Gold and Silver From Copper, Gold and Silver SolutionsBy J Abols, T Hughes
The selective recovery of gold and silver from solutions containing other metals, such as copper, is possible using AuRIX«100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by
Jan 1, 2005
-
Underground Ore Haulage at Mount LyellThe Prince Lyell Mine has been the major production source at Mount Lyell since under-ground mining commenced in 1972.Three lifts of stopes have been mined to date, with the fourth, the 40 Series lift
Jan 1, 1985
-
Rise and Pillar Rill Stoping at Golden Crown MineBy Rogers M, Sullivan B
Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15
Jan 1, 1993
-
Health and Safety in the Mining IndustryThe patterns of occupational health pro- grammes in mining and metallurgy are discussed in relation to the impact of chemical and phy- sical hazards on the health of workers in these fields. Mining
Jan 1, 1975
-
Development Wash/Screen Process to Beneficiate Christmas Island B-Grade PhosphatesChristmas Island contains large deposits of phosphate minerals varying from high-grade calcium-phosphate (apatite) to lower grade iron and'aluminium phosphate (crandallite/millisite). The surfa
Jan 1, 1971
-
Peak Downs Mine Operations with Special Reference to Multi-Seam StrippingBy Seymour C. A
Peak Downs Mine, a five million tonnes a year coking coal operation, strip mines a, series of Permian coal seams. Seam thickness ranges from 0.5m to 5.0m, and seams consist of multiple coal plies w
Jan 1, 1974
-
Polycom High Pressure Grinding Principles and Industrial ApplicationKrupp Polysius AG, FRG, in close cooperation with Prof. Dr. K. Schoenert, FRG have developed the principle of the high pressure grind- ing roll POLYCOM. The POLYCOM mill basically consists of two cou
Jan 1, 1988
-
Dolomite in the Steel IndustryBy Mann T
The use of dolomite as a refractory began in England about 1870 when the basic Bessemer process for the removal of phosphorus from steel was developed by Thomas and Gilchrist.Knowledge of dolomite as
Jan 1, 1951
-
Backfill: An Integral Component of Mine ProductionBy D Morrison
Backfill is usually considered a necessary evil that contributes little to the principal objective of the operation, ore production. Consequently, it is relegated to an auxiliary role in the operation
Jan 1, 1998
-
Proportion of Energy Attributable to ComminutionBy G R. Ballantyne, M S. Powell, M Tiang
This paper reviews the proportion of energy attributable to comminution within the Australian gold and copper mining sector. The need for this is motivated by inconsistencies in the quoted energy usag
Oct 29, 2012
-
Future Trends for Underground Thick Seam Coal Mining in AustraliaThis paper provides an overview of the future for underground thick seam coal mining in Australia. It reviews the available and anticipated mining systems and technologies which may be adopted to mine
Jan 1, 2000
-
Environmental Blast Design and Effective ImplementationBy A B. Richards
Effective control of blast vibration and flyrock requires that significant factors be identified and quantified, that the blast be designed to ensure both blasting efficiency and compliance with appli
Jan 1, 2004
-
Mining-Hydrological Characteristics of the Underground Copper Mine of Neves-Corvo, PortugalBy Real F, Carvalho P
During the development of the Neves-Corvo Underground Copper Mine, since 1981, inflow of water has been encountered in the mine workings, which consist of a ramp from surface 5 km long, a shaft 575
Jan 1, 1988
-
KEYNOTE: Back to the Future – Still on the Dark SideBy P D. Munro
"This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and
Oct 10, 2016
-
Development of the Bulga Coal Mine ComplexBy Hamblyn S
Oakbridge, in combination with its joint venture partner, Nippon Steel of Japan, is expanding its Bulga underground and open cut mines to meet the growing demand for coal in the Asian market. Expans
Jan 1, 1995
-
The Innovative Financing of the Australian Gold IndustryBy White A. H, Gillies A. D S
In recent years the Australian gold industry has gone through a major expansion phase. The need for finance has led to adoption of different approaches such as the well known gold loan, forward sell
Jan 1, 1994