Search Documents

  • DFI
    The Analysis And Computation Of Soil-Pile (Wall) Interaction For Deep Excavation Of High-Rise Building

    By Lu Peiyan

    A computation model of soil-pile (wall) interaction under lateral loading is presented in this paper. The model has been applied to some engineering projects, and the comparison between computation re

    Jan 1, 1991

  • SME
    Disc Cutting Tests On Dry And Saturated Sandstone: Muck As A Performance Estimator

    By M. Z. A. Bakar

    A series of full scale laboratory linear rock cutting tests was carried out with a long bladed single disc cutter (292 mm diameter, 11mm wide constant cross-section blade) on dry and water saturated s

    Jan 1, 2012

  • CIM
    The True North orebody, Fairbanks District, AK: A distal Intrusion-related Au deposit. Kinross Gold Corporation

    By P. W. Jensen

    Gold deposits in Interior Alaska are commonly coincident in time and space with reduced, mid-Cretaceous granitoids. The True North deposit of the Fairbanks district is several km from such granitoids,

    May 1, 2003

  • IIMP
    Alternativas de profundización de la mina Animón

    By Roberto Maldonado

    El presente texto señala el proyecto de profundización en la mina Animón considerando sus características como: geología e hidrogeología, parámetros geomecánicos, niveles de producción, costos de capi

    Sep 12, 2005

  • SAIMM
    The abatement of pollution from abandoned gold-residue dams

    By J. A. Caldwell, G. E. Blight

    The metropolitan area of the Witwatersrand has grown up around the Witwatersrand gold mines. Most of the mines have now been abandoned, but deposits of waste material remain and have been surrounded,

    Jan 1, 1983

  • AUSIMM
    Aggregates: Between a Rock and a Hard Place

    It is easy to demonstrate the importance of aggregates in any conversation about infrastructure and other engineering artefacts. Peoples around the world have made use of stone to enrich and enhance t

    Jan 1, 2000

  • AUSIMM
    North Island Epithermal Gold: Processes of Mineralisation

    By J V. Lawless

    Mineralisation processes in epithermal deposits in the North Island of New Zealand are best illustrated by considering the two most productive deposits: Waihi and the Thames Bonanza Zone (TBZ), which

    Jan 1, 1997

  • NIOSH
    OFR-34-88 Development And Testing Of A Variable Wall Miner Breadboard Prototype Unit

    By Ronald J. Mathis

    The objective of this contract is to design, build, surface test, and evaluate a breadboard prototype of the Variable Wall Mining System so that data are available for the design of a production machi

    Jan 1, 1987

  • DFI
    Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? Synopsis

    By A. K. C. Chan

    Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460

    Jan 1, 2010

  • SME
    A protocol and standard for mine ventilation studies

    Flawed mining studies have been major contributors to poor investment decisions in mining for many years, contributing to the long period of poor industry profitability. Most of the major mining house

    Jan 1, 2009

  • IOM3
    Opttimisation of development layyouts for retreat longwall mining with particular reference to the Australian coal mines

    By R D. Lama, A Misra

    One of the major factors restricting an increase in the productivity of a longwall mine is lower productivity obtained in a development panel. There has been a significant improvement in gate road dev

    Jan 9, 1996

  • SAIMM
    Kyoto Carbon Credits

    By H. Immink

    Keywords: Kyoto Protocol, carbon credits, global warming, energy, auditing Climate change is nowadays being taken increasingly seriously, and the link between global warming and the carbon dioxide

    Jan 1, 2006

  • CIM
    Improving Silica Dust Controls for Metal/Nonmetal Mining Operations in the United States

    By Jay F. Colinet

    Researchers at the Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) work to reduce respirable dust exposures in mining operations. One focus o

    May 1, 2007

  • DFI
    Accessories For Driven Piles ? Synopsis

    By H. W. Hunt

    Accessories are increasingly used to protect and extend H, pipe, precast concrete, timber, and sheet piles for any soils conditions. With point protection, piles can be driven through boulders, layere

    Jan 1, 2010

  • NIOSH
    RI 4123 Pilot Mill Concentration of Las Vegas Wash Manganese Ore, Boulder City, Nev.

    By S. R. Zimmerley, C. H. Schack

    "INTRODUCTION The pilot-mill concentrator at Boulder City, which has a nominal capacity of 40 tons per day, was planned and built to investigate further the beneficiation of domestic manganese ores th

    Sep 1, 1947

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • ABM
    ESTUDO DA EVOLUÇÃO DO COEFICIENTE GLOBAL DE TRANSFERÊNCIA DE CALOR EM FUNÇÃO DA COMPOSIÇÃO QUÍMICA DE LIGAS Al-Sn

    By Ádria Rocha Corrêa

    Durante a solidificação de ligas metálicas, o produto fundido se contrai, o qual provoca o surgimento de espaçamentos vazios na interface metal/molde chamados de “gaps”. Estes gaps causam o aumento da

    Aug 17, 2017

  • SME
    Rehabilitation of a Brick-Lined Aqueduct

    By Taehong Kim, Carl Pannuti, Nikolas Sokol, Walter Herrick

    BACKGROUND This paper discusses work performed as part the rehabilitation of the gravity flow section of the New Croton Aqueduct (NCA) during an approximately two year period between 2004 and 2006

    Jan 1, 2007

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • AUSIMM
    A Tool for Benchmark Study of Roadway Development Performances

    In responding to why some longwall roadway development rates are different among mines, the Roadway Development Task Group (RDTG) of Australian Coal Association Research Program (ACARP) has initiated

    Dec 6, 2010