    Bench Face and Quarry Fragmentation Analysis: 3D Imaging vs. Scaling References

    By Daniel Ko, Ian Bell, Shahram Tafazoli, Bahram Sameti, Aylin Azmin

    Image-based remote sensing of rock fragmentation in mining and quarry applications essentially treats each rock in the image as a data object in order to determine the rock size distribution. An obvio

    Jan 1, 2015

  • SME
    Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access Project

    By Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis

    East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta

    Jan 1, 2007

  • DFI
    Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - Synopsis

    By Sanjeev Malhotra

    The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins

    Jan 1, 2000

  • AUSIMM
    The Cementation of Metals form Dilute Aqueous Solution

    A rotating disc geometry was used to provide a uniformly accessible surface for a kinetic study of the cementation of cadmium, lead, and silver from dilute aqueous solutions. This work is an extension

    Jan 1, 1971

  • SME
    Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method

    By Paul H. Madsen, Victor S. Romero

    The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo

    Jan 1, 2001

  • DFI
    A Study in Extreme Event Large Displacement Analysis of Large Diameter Piles

    By Bret N. Lingwall, Byron Foster

    The problem of reliable extreme event modeling of large diameter piles under enormous structural or kinematic loads has gained more attention in recent years. In particular, the soil response around t

    Jan 1, 2018

  • AUSIMM
    Mineralization at Aberfoyle Tin Mine Rossarden, Tasmania

    By Lyon R. J P

    The quartz-cassiterite-wolfram veins at the Aberfoyle Tin Mine, north-eastern Tasmania, form a sheeted zone about 200 ft. wide and 1,600 ft. long in slightly contact metamorphosed shales, slates and g

    Jan 1, 1957

  • NIOSH
    IC 8621 Methane Control In Eastern U.S. Coal Mines - Proceedings Of The Symposium Of The Bureau Of Mines/ Industry Technology Transfer Seminar, Morgantown, W. Va., May 30-31,1973

    Research workers from the Bureau of Mines and industry met with other government and industry representatives at the Mont Chateau Lodge, Morgantown, W. Va., on May 30-31, 1973, to discuss the current

    Jan 1, 1973

  • SME
    Construction of a Mixed Face Reach Through Granitic Rocks and Conglomerate

    By John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler

    The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol

    Jan 1, 2007

  • IOM3
    Utilization of voids for development and gas generation following waste disposal

    By J. A. Every-Brown

    Case studies are presented of three derelict sites in Kent and Essex that provide a good cross-section of opportunities for second-generation commercial uses of former chalk, limestone, clay and grave

    Aug 1, 1994

  • NIOSH
    RI 3192 Investigation during 1931 of Gases in Manholes in Boston, MA

    By G. W. Jones

    "INTRODUCTION In a previous reports results were given of a manhole investigation carried out over a period from June,- 1929, to July, 1930, in cooperation with the Edison Electric Illuminating Co. of

    Sep 1, 1932

  • NIOSH
    OFR-54-75 Design, Develop, Fabricate, Test, And Demonstrate Permissible Low Cost Cylindrical Stress Gages And Associated Components Capable Of Measuring Change Of Stress As A Function Of Time In Underground Coal Mines. ? 1. Introduction

    By Ivor Hawkes

    The purpose of the development described in this report and as stated in the contract work statement is to "design, develop, fabricate, test and demonstrate, and deliver to the government permissible

    Jan 1, 1973

  • NIOSH
    IC 8214 Mining Methods And Costs, Kimballton Limestone Mine, Standard Lime And Cement Co., Giles County, Va.

    By N. A. Eilertsen

    Procedures of mining high-calcium limestone underground at the Kimballton mine of the Standard Lime and Cement Co. in Giles County, west-central Virginia, are described. Drilling and blasting procedur

    Jan 1, 1964

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007

  • SME
    Lessons and implications from the onshore and offshore gas hydrate field production tests

    By Se-joon Kim, Jong-hwa Chun

    "‘Gas hydrate’ is the common term for a solid material formed from the combination of various gases as ‘guest’ and water as ‘host’. A series of large-scale scientific drilling and coring programmes co

    Sep 1, 2014

  • IIMP
    Modelo prefabricado para salidas de emergencias en minas subterráneas

    By Roberto Bria

    El presente texto describe el módulo prefabricado para las salidas de emergencia. En este sentido, el sistema modular prefabricado busca facilitar y agilizar la instalación de salidas de emergencia de

    Sep 21, 2013

  • SME
    The Ivar Project - An Uncommon, Everyday TBM Tunnel

    By Yngve Jordal, Sverker Hartwig

    The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr

    Jan 1, 1991

  • AUSIMM
    Mineral Resource Assessment for the West Coast of New Zealand, Using Spatial Analysis in a GIS: A New Exploration Management and Land-Use Management Tool

    By A B. Christie, S C. Cox

    Effective land-use planning requires accurate knowledge of mineral resource potential. Mineral companies during reconnaissance exploration, feasibility investigations and mine development also use thi

    Jan 1, 2001

  • NIOSH
    IC 8698 Energy Consumption In Domestic Primary Copper Production

    By Rodney D. Rosenkranz

    Energy consumption in domes tic copper production has increased nearly 60 percent in the last 10 years, reaching approximately 175 trillion Btu in 1973. Energy required to produce 1 pound of copper ro

    Jan 1, 1976

  • DFI
    Predicting ACIP Pile Settlement Using Case Histories ? Introduction

    By Christopher M. Kenney

    Augered-cast-in-place (ACIP) piles have been utilized on commercial projects throughout many parts of the country for years, but are only beginning to be scrutinized for use on major infrastructure pr