Roof Behavior In South African Coal Room And Pillar PanelsBy Bruce W. Jack
An extensive underground roof-monitoring program was conducted in order to determine the roof strata behavior under various conditions. In total 29 sites at 5 different collieries were monitored using
Jan 1, 2000
-
Statistical Regional Calibration Of Subsidence Prediction ModelsBy D. N. Cleaver
Like other influence function methods, the SWIFT subsidence prediction program, developed within the Mineral Resources Engineering Department at the University of Nottingham, requires calibration to r
Jan 1, 1995
-
Analysis And Field Testing Of Presupport Application In Coal StrataBy J. D. Dizon
Conventional strata control methods (i.e. roof bolts. cable trusses) are not always effective for ground control of very weak coal strata. An alternative method, termed presupport. is being investigat
Jan 1, 1990
-
Methods To Determine Pillar Stress Distribution And Its Effect On StabilityBy David P. Conover
The effects of stress distribution on pillar stability were evaluated through rock mechanics studies conducted in three underground room-and-pillar coal mines. Results of the three field instrumentati
Jan 1, 1989
-
Inorganic Cement Grouted Bolt SystemBy M. O. Serbousek
In 1975 the Bureau of Mines Spokane Research Center began a series of laboratory and field tests to investigate the feasibility of developing a substitute for the organic chemicals used in resin roof-
Jan 1, 1981
-
Some Structural Aspects Of Designing The Shield SupportsBy S. S. Peng
This paper presents a convenient way for the preliminary design of the shield supports. The locus equations which are applicable for all kids of shield supports are derived. These equations facilitate
Jan 1, 1982
-
Overview of Safety Considerations with Highwall Mining OperationsBy George Gardner
The rapid growth of highwall mining in the Appalachian coalfields has resulted in unique safety concerns. Due to the concentration of activity at the base of the highwall and the potentially destabili
Jan 1, 2002
-
The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)By Laxminarayan Holla
There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of
Jan 1, 1992
-
Transversely Elasto-Plastic Analysis of Surface Subsidence Arising from Longwall Mining of Inclined Coal SeamsBy M. Afsari Nejad
A Transversely Elasto-Plastic Model was configured in FLAC (Fact Lagrangian Analysis of Continua) as a more realistic simulation of stratified and inclined strata behaviour examining surface subsidenc
Jan 1, 1998
-
Investigation of Subsidence Over AML: A Case StudyBy P. M. Lin
The problem of abandoned mine land (AML) subsidence is getting more severe because abandoned mine lands which used to be located in the remote areas have been gradually developed into suburbs or even
Jan 1, 1987
-
Analysis Of Longwell Shields And Their Interaction With Surrounding Strata In A Deep Coal MineBy Duk-Won Park
A vast majority of the operating longwall sections use shield-type face supports to provide ground control in the United States. As a co-operative research program between the University of Alabama (U
Jan 1, 1992
-
Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek MineBy Yong-Ming Jiang
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)By Ed Mchugh
Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co
Jan 1, 1999
-
Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal MiningBy Andre Zingano
It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove
Jan 1, 2011
-
Subsurface Fracture Development Due To Longwall Mining And Its Interpretation Using Image Processing Techniques (736b40e1-a21a-40c0-a678-75088df69d02)By Gexin Sun
This paper presents the physical modelling results of subsurface fracture development associated with longwall mining operations and an application of image processing techniques to interpretion of th
Jan 1, 1992
-
Rock Mechanics and the Analysis of Underground Mine Stability Adjacent to Coal Refuse ImpoundmentsBy David Newman
Coal refuse impoundments and underground mines are frequently sited in close vertical and horizontal proximity in the valleys of the Southern Appalachian coalfield. The steep V-shaped valleys provide
Jan 1, 2003
-
First Caving And Its Effects--A Case StudyBy S. M. Hsiung
In late September 1984, a longwall panel in West Virginia lost 60 powered supports when the face had advanced for 250 ft. from the setup entry. An in-mine investigation showed that it was a first weig
Jan 1, 1984
-
Three-Dimensional Analysis Of Mine Dump Point StabilityBy Radoslaw L. Michalowski
The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li
Jan 1, 1990
-
Ice Pillars, Packwalls, and BratticesBy David L. Kuck
This paper describes a system for providing structural, support in underground mines, employing water ice for pillars. packwalls and brattices. It consists of a refrigeration brine chiller, brine circ
Jan 1, 1987
-
Application of geotechnical and geophysical parameters to improve planning reliability in roadway drivageBy Nikolaos Polysos
To drive and utilise gate roads economically requires accurate planning and risk assessment considering the variable geomechanical requirements. The geomechanical part of roadway planning is secure
Jan 1, 2002