Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Underground High Resolution Seismic Method As A Low Cost Alternative For Mapping Sandstone Replacement Channels In Coal Mines

    By Rene Rodriguez

    Sandstone paleo-channels encountered during coal mining operation can significantly slow down the advance in mining, and often completely shut-down coal mine production, with consequent extensive econ

    Jan 1, 1994

  • SME-ICGCM
    Underground Application Of Optimization

    By S. J. Jung

    The goal of this research is to demonstrate how optimization methodology can be coupled with the finite element method for greater stability of underground mine openings. As a result of increasing min

    Jan 1, 1993

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    Optimization Research on Flexible Shield Supports Mining Method in Steeply Coal Seam

    By Bingjie Huo

    "China is a major coal producer and consumer. It is necessary to mine the steeply pitching coal seams due to development of the coal industry to meet the increasing needs for coal. Flexible shield sup

    Jan 1, 2010

  • SME-ICGCM
    Numerical Analysis of the Effect of Coal Seam Characteristics on the Longwall Top Coal Cavability

    By Rudrajit Mitra, Tien Dung Le, Chengguo Zhang, Bruce Hebblewhite, Joung Oh

    "Geomechanical and geotechnical characteristics of coal seam are important parameters that directly affect the cavability of top coal in the longwall top-coal caving (LTCC) method. The impact of these

    Jan 1, 2017

  • SME-ICGCM
    Ground Control And Safety Considerations During Longwall Recovery

    By William J. Gray

    The Roof Control Division of MSHA's Pittsburgh Safety and Health Technology Center has been conducting a program to evaluate methods employed by the U.S. coal mining industry during recovery of l

    Jan 1, 1993

  • SME-ICGCM
    Effects Of Mining On Underground Infrastructures In The German Hard Coal Sector

    By Anton Sroka

    The German hard coal production predominantly derives from underground multiseam mining activities. Beside common surface damages, ?inner mine damages? on underground infrastructures (i.e. main roads,

    Jan 1, 1999

  • SME-ICGCM
    Subsidence Over Room and Pillar Retreat Mining in a Low Coal Seam

    By Andre Zingano, Anderson Weiss

    "The objective of this paper is to study the behavior of a low thick and low depth coal seam and the overburden rock mass. The mining method is room and pillar in retreat and partial pillar recovery.

    Jan 1, 2018

  • SME-ICGCM
    Ground Control In South African Coal Mines - A U.S. Perspective

    By Christopher Mark

    After the United States and Australia, South Africa has the largest. modern underground coal mining industry in the world. Historically, South Africa has been the cradle of many innovations in ground

    Jan 1, 1999

  • SME-ICGCM
    Case Study Of Stability Investigations Related To Shallow Underground Mining Of Iron Ore In The United Kingdom

    By S. F. Smith

    Following a roof beam collapse on a major production district at the British Steel Corporation's Dragonby Iron Ore Mine, Scunthorpe, South Humberside, UK, rock mechanics investigations were under

    Jan 1, 1995

  • SME-ICGCM
    A Liquid Settlement System for Measuring Roof Sag During Development Mining - A Comparison Between Place Change Mining and a Miner?Bolter

    By Andy L. Shaffer

    A novel liquid settlement system (LSS) was installed in advance of mining at a western United States (U.S.) longwall mine to measure total roof sag from the time of cutting to days after mining during

    Jan 1, 2014

  • SME-ICGCM
    BORE Bolt: No Milled Notch? No Hot Notch? No Problem

    By Stephen C. Tadolini, Anand Bhagwat

    "Intrinsic supports installed in mines with limited seam or mining heights have always proven to be difficult when the required support length is longer. To date, three solutions have been used to ens

    Jan 1, 2018

  • SME-ICGCM
    Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall Panels

    By Kenneth Rigsby

    Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi

    Jan 1, 2003

  • SME-ICGCM
    Strata Movement Around Large Mining Height Face Area with Fully Mechanized Method in Steeply Dipping Thick Seam

    By Yongping Wu

    The steeply dipping coal seams in this paper refer to those with the angle of inclination ranging from 35° to 55°. The reserves of the steep coal seams account for approximately 15%~20% of the total c

    Jan 1, 2014

  • SME-ICGCM
    Upwards Surface Movement above Deep Coal Mines after Closure and Flooding of Underground Workings

    By Pierre-Yves Declercq, Andre Vervoort

    "After the mass closures of entire coal mine districts in Europe at the end of the last century, a new phenomenon of surface movement was observed—an upward movement. Although most surface movement (i

    Jan 1, 2017

  • SME-ICGCM
    Volumetric Measurement of Rock Movement Using Photogrammetry

    By Stephen R. Iverson, Jeffrey C. Johnson, Donovan J. Benton, Michael J. Raffaldi, Lewis A. Martin

    "The NIOSH ground control safety research program at Spokane, Washington, is exploring applications of photogrammetry to rock mass and support monitoring. This paper describes two ways photogrammetric

    Jan 1, 2015

  • SME-ICGCM
    Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded Halite

    By Liane J. Terrill

    A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted

    Jan 1, 1997

  • SME-ICGCM
    A Comparison Of Overburden Response Due To Longwall Mining

    By David K. Ingram

    The objective of this U.S. Bureau of Mines (USBM) investigation was to characterize overburden response due to longwall mining. Subsurface strata and surface deformations were monitored at two sites i

    Jan 1, 1994

  • SME-ICGCM
    Investigation Of Seam Thickness And Seam Splitting Within A Longwall Panel By An In-Seam Seismic Survey

    By Wolfgang Schott

    The propagation velocity of in-seam seismic (ISS ) waves depends on frequency which is also known as dispersion. This dispersion is not only determined by the thickness of the coal seam and its dirt h

    Jan 1, 2003

  • SME-ICGCM
    Analyses of Valley Fill Slope Stability - Three Case Studies

    By Shiva P. B. Kolli

    Surface mining of multiple scams by mountaintop mining methodology is complex in the Appalachian region of West Virginia. Excess spoil from the removal of overburden and interburden is disposed in the

    Jan 1, 2001