Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Characterization of Internal Insertion Pressure During Installation of Fully Grouted Bolts

    By Luis Giraldo

    The installation procedure of fully grouted rebar bolts requires that the bolt be pushed through the resin grout until it is fully inserted in the borehole. Resin grout is a highly viscous fluid that

    Jan 1, 2006

  • SME-ICGCM
    Recent Developments in Pre-driven Recovery Road Design

    By Rob Thomas

    Pre-driven recovery roads are used to speed up the longwall recovery process by reducing bolt-up requirements and by improving ground conditions on the face during the removal of the powered supports.

    Jan 1, 2008

  • SME-ICGCM
    Coal Pillar Life Prediction in the Vaal Basin, South Africa

    By J. Nielen van der Merwe

    This investigation was done to develop a method to predict the lie of coal pillars. It has long since been known that coal pillars deteriorate over time, but there was no method to quantify the deteri

    Jan 1, 1998

  • SME-ICGCM
    Evaluation of the Effect of Length on Strength of Slender Pillars in Limestone Mines Using Numerical Modeling

    By Dennis Dolinar

    In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a

    Jan 1, 2007

  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME-ICGCM
    Load Capacity and Bond Behavior of Resin Grouted Rock Bolts

    By Nic Slatalla

    Resin anchored rock bolts are an effective tool to control the deformation of an underground opening because they combine high support capacity with fast installation. However, there are still numerou

    Jan 1, 2006

  • SME-ICGCM
    A Review of Effective Parameters on Roof Fall During Retreat Mining in Room and Pillar Coal Mines

    By Ebrahim Ghasemi

    Problem statement: One of the most challenging safety problems in room-and-pillar coalmines is controlling roof falls during retreat mining. Roof falls not only cause both fatal and non-fatal injuries

    Jan 1, 2012

  • SME-ICGCM
    Influence of Roof/Floor Interface on Coal Pillar Performance

    By Kyle A. Perry

    Pillar design formulae have existed for decades, and the guidelines for design stability factors are generally accepted by regulatory agencies and broadly used within the coal industry. Nearly all des

    Jan 1, 2013

  • SME-ICGCM
    Electrical Measurements of Coal Measure Rocks for Electromagnetic Applications in Mining Industry

    By Nikolay Boykov

    Subsurface imaging technologies are part of the electromagnetic (EM) geophysical methods. EM technologies such as radio imaging method (RIM), ground penetrating radar (GPR), and drill string radar (DS

    Jan 1, 2006

  • SME-ICGCM
    Multiple Seam Interactions of Relatively Shallow, High Seam Shortwalls in South Africa

    By John Latilla

    Exxaro Mining?s Matla Coal situated in Mpumalanga, South Africa operates two shortwall faces on the No 4 and No 2 seam while the No 5 seam has also been longwalled in the past. Severe strata loading e

    Jan 1, 2007

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME-ICGCM
    Using Major Hazard Risk Assessment to Appraise and Manage Escapeway Instability Issues: A Case Study (d1d3dd49-2f0a-44af-8ddf-69de3f441c2d)

    By Anthony Iannacchione

    A Major Hazard Risk Assessment (MHRA) was developed in Australia after a series of mine disasters in the 1990?s. A MHRA is used to help prevent major hazards, i.e. fire, explosion, wind-blast, outbur

    Jan 1, 2007

  • SME-ICGCM
    Plasticity Characteristics of the Immediate Floor Rocks in the Illinois Basin Coal Mines

    By Murali Gadde

    The immediate floor bed in the Illinois Basin coal mines is often comprised of weak plastic underclay material. Operational and stability problems were encountered in the past due to the low strength

    Jan 1, 2008

  • SME-ICGCM
    Geomechanical and Weathering Properties of Weak Roof Shales in Coal Mines

    By Hakan Gurgenli

    Many coal seams have weak shale immediate roofs that cause ground control problems. Therefore, it is important to know the properties of these shales so that preventive measures can be developed in a

    Jan 1, 2006

  • SME-ICGCM
    Shear Strength Characteristics of Soft Rock Joints Based on Constant Normal Stiffness Testing

    Large-scale shear apparatus is designed to investigate the shear hehaviour of simulated soft rock joints under constant normal stifmess condition. Regular saw-teeth profiles having inclinations betwee

    Jan 1, 1997

  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SME-ICGCM
    Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004

    By Lewis Dr. Wade

    It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO

    Jan 1, 2005

  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006

  • SME-ICGCM
    Geologic Conditions Affecting Mineability in the Jane Mine.

    By Stephen J. Harven

    Geologic conditions in eight northern operating sections of Jane Mine, Keystone Coal Mining Complex. Armstrong County, Pennsylvania are defined by utilizing drillhole data and underground geologic map

    Jan 1, 1987

  • SME-ICGCM
    Development of Mains in Challenging Ground Conditions

    By Kot F. v. Unrug

    The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In

    Jan 1, 2006