Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Classification Of Large Seismic Events At The Lucky Friday Mine

    By J. K. Whyatt

    The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of

    Jan 1, 1996

  • SME-ICGCM
    New Developments In Headed Rebar Ground Support (e1369dc5-cd64-41ac-8b6d-861d8d628824)

    By Roland C. Walker

    Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging

    Jan 1, 2009

  • SME-ICGCM
    Application Of Tomographic Imaging To Stability Assessment

    By Hamid Maleki

    Roof falls are one of the leading ground control problems that adversely influence productivity and worker safety in underground mines, construction sites, and nuclear waste repositories. To control r

    Jan 1, 1996

  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009

  • SME-ICGCM
    Microseismic Monitoring In The Sydney Coalfield

    By G. R. Corbett

    Between 1977 and 1984, No. 26 Colliery, at Glace Bay in the Sydney Coalfield, suffered from a series of 37 rock/gas outbursts. These events were characterized by the complete pulverization of a sandst

    Jan 1, 1994

  • SME-ICGCM
    Effect Of Water On Stability Of Mine Roadways

    The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many road

    Jan 1, 1996

  • SME-ICGCM
    Application Of Seismic Tomography In Underground Mining

    By D. F. Scott

    Seismic tomography, as used in mining, is based on the principle that highly stressed rock will demonstrate relatively higher P-wave velocities than rock under less stress. A decrease or increase in s

    Jan 1, 1996

  • SME-ICGCM
    The Effect Of Gas Pressure On Coal Strength

    By Najdat I. Aziz

    There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens

    Jan 1, 1996

  • SME-ICGCM
    Comparison of the Performance of Active and Passive Roof Bolts in An Illinois Basin Coal Mine

    By Anil K. Ray

    This paper discusses in situ studies conducted at an Illinois Basin room-and-pillar coal mine to evaluate the performances of three different types of bolts under similar geologic conditions. The bolt

    Jan 1, 2012

  • SME-ICGCM
    Coal Strength Variation by Lithotype for High-Volatile a Bituminous Coal in the Central Appalachian Basin

    By John A. Rusnak

    "This paper discusses the variation of coal strength based on the megascopic coal lithotypes for Central Appalachian high-volatile A coal beds. The composition of coal beds is complex and variable, de

    Jan 1, 2017

  • SME-ICGCM
    Premining Stability Analysis Of A Shaft Pillar At The Homestake Mine

    By J. C. Johnson

    High-grade ore found in a shaft pillar at the Homestake Mine prompted a request for a Bureau of Mines study to determine if selected areas of the shaft pillar could be mined without jeopardizing the s

    Jan 1, 1989

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • SME-ICGCM
    Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study

    By Mark K. Larson

    Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th

    Jan 1, 2012

  • SME-ICGCM
    Stability Mapping To Examine Ground Failure Risk: A Field Study At A Limestone Mine (b0d73e07-1fdd-41b0-ab9e-b3e15e89a17e)

    As the surface reserves are being depleted, more and more stone operators are seeking underground mining options. Stability of underground openings is a major concern for the safety and productivity.

    Jan 1, 2009

  • SME-ICGCM
    Surface damage due to longwall mining - A case study

    By P. M. Lin

    A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t

    Jan 1, 1989

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME-ICGCM
    Complex Seismic Trace Attributes In Coal Exploration

    By Lawrence M. Gochioco

    The interpretation of coal seismic data requires a certain precision and accuracy to make the results more reliable. The signature of the seismic wavelet provides a host of valuable geologic informati

    Jan 1, 1989

  • SME-ICGCM
    Application Of Computer Programs For Rock Pressure Control

    By V. M. Shick

    For practical purposes of the use of information resources in the field of geomechanics and mine surveying with accepted mining technology in mines, the authors have developed the packaged software pr

    Jan 1, 1996

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007