Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Developments Of Mechanized Technologies For Low Seam Height Mining In PlatinumBy P. Bracher
Most efforts to mechanize low seam (narrow reef) mining of platinum ore are presently based on board-and-pillar methods with1.6?1.8 m in reef excavation. This paper attempts to substantiate the benefi
Jan 1, 2003
-
Test Results On Compressive Strength Anisotropy In Steel Fibre Reinforced ShotcreteRecently, work was carried out by the Shotcrete Working Group to study anisotropy in steel fibre reinforced shotcrete using strain-controlled, compressive strength testing methods. The shotcrete mate
Jan 1, 2001
-
Sidewall Design For Improved Lining Life In A PGM Smelting FurnaceBy I. McDougall
The matte/slag tidal zone in a nickel-copper-iron-sulphide matte smelting furnace is subject to severe process conditions that can lead to premature failure of the lining. The MgO-FeO-SiO2 slag is agg
Aug 1, 2013
-
Sulphur Bonding In Solidified Ladle SlagsBy H. Preßlinger, H. Hiebler, K. Klepp, W. Posch, M. Mayr
It was investigated in which form sulphur is bonded in ladle slags. For this purpose, the mineralogical phases of the ladle slags were qualitatively and quantitatively evaluated by means of a micropro
Jan 1, 2004
-
Prediction of hydrocyclone performance using artificial neural networks - SynopsisBy M. Karimi
Artificial neural networks (ANNs) have found their applications in the modelling of unit operations of mineral processing plants. In this research, laboratory-scale tests were conducted, using a three
Jan 1, 2010
-
Managing The Geotechnical Risk Associated With High And Low Walls At Anglo Coal?s Open Pit Mines. - SynopsisBy Gift Makusha, Dave Minney
Anglo Coal South Africa mines coal for both the domestic and export market using open cast and strip mining methods. To establish a mine, a process is set in place to gather ever increasing amounts
Jan 1, 2006
-
A Case Study Of Risk Evaluation At Cerrejon MineBy Luis-Fernando Contreras, Juliano Maran, Richard LeSueur
A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res
Jan 1, 2006
-
Predicting the probability of Iron-Rich Ultramafic Pegmatite (IRUP) in the Merensky Reef at Lonmin’s Karee MineBy D. Hoffmann, S. Plumb
IRUP is an iron-rich ultramafic pegmatite rock that formed due to hot ironrich fluids and gases replacing local stratigraphic zones of the Bushveld Complex. This study focuses on the estimation of the
Jan 1, 2015
-
The role of gravity flow in the design and planning of large sublevel stopesBy M. Pineda
Sublevel stoping (SLS) is one of the oldest and most used methods for underground mining. It relies heavily on the use of drilling and blasting techniques to remove the rock, and gravity to transport
Jan 1, 2015
-
Cokriging of compositional balances including a dimension reduction and retrieval of original unitsBy V. Pawlowsky-Glahn, E. Pardo-Igúzquiza, J. J. Egozcue, R. A. Olea
Compositional data constitutes a special class of quantitative measurements involving parts of a whole. The sample space has an algebraic-geometric structure different from that of real-valued data. A
Jan 1, 2015
-
Determining concentration and velocity profiles of non-Newtonian settling slurries using electrical resistance tomography - SynopsisBy A. P. N. Sutherland
Pipelines for transporting high concentration slurries are often designed using methods applicable to homogeneous non-Newtonian laminar flow. Many industrial slurries though comprise coarse particles
Jan 1, 2008
-
A Model To Predict The Performance Of Roadheaders Based On The Rock Mass Brittleness Index - SynopsisBy A. Ebrahimabadi
Roadheaders are very versatile excavation machines used in tunnelling, mine development, and mine production for soft to medium strength rock formations. Performance prediction is an important factor
Jan 1, 2011
-
Longwalling At Great Depth In A Geologically Disturbed Environment - The Way ForwardBy F. Russo-Bello
TauTona Mine (the renamed Western Deep Levels East) is using a longwall mining method with stability pillars to extract the Carbon Leader Reef at a depth ranging from 2097 metres to 3456 metres below
Jan 1, 2000
-
Centre for research of fires and ventilation in tunnels ‘San Pedro de Anes’By J. L. Fuentes-Cantillana, J. B. Solar Menéndez, A. O. Cámara
The Principality of Asturias is a region situated in Northern Spain with two centuries of tradition in underground coal mining. In addition, its uneven relief has obliged the construction of a great n
Jan 1, 2003
-
Application Of Ecosystem Function Analysis (EFA) In Assessing Mine Tailings Rehabilitation: An Example From The Mhangura Copper Mine Tailings, ZimbabweBy G. M. Dowo
The widespread environmental damage caused by slimes dam construction requires rehabilitation as one of the key management strategies towards land restoration. From the time when Mhangura Copper Mine
Dec 1, 2013
-
A Comparison Of The Reheat Cracking Susceptibility Of A Service Exposed High Temperature Alloy Steel With That Of New MaterialBy R. Loots
High temperature creep resistant alloys are used in power plants as steam pipes and headers where they have to withstand super heated steam temperatures of up to 600ºC for the lifetime of the plant. F
Jan 1, 2004
-
Perceptions of the Impact of Board Members? Individual Perspectives on the Social and Environmental Performance of CompaniesBy J. J. Stacey
Large mining companies generally follow the distributed ownership corporate model, with a board of directors responsible for decisions that affect both shareholder value and stakeholders of the compan
Jan 1, 2014
-
Burning pyrites compared to sulphur ? SynopsisBy W. V. Mutler
Present day capital costs are analysed for a 2 000 metric tonne per day (MTPD) pyrite burning plant and compared with a sulphur burning plant of the same capacity. Power, raw material and steam produc
Jan 1, 2009
-
Development of a gravity flow numerical model for the evaluation of draw point spacing for block/panel caving - SynopsisBy R. L. Castro
Block caving methods, when operated under favourable rock mass conditions, can achieve higher production rates and lower operating costs than other various existing underground mining applications. Fo
Jan 1, 2009
-
Planning Concept For U/G Works - Overall Planning Concepts Of The Underground Works - Park Station To Marlboro Portal - SummaryBy Philippe Dumont
?Lay out of the tunnel section ?General ?Geology ?Tunnels methods ?Stations constraints ?Impacts on tunnels ?Design ?Programs