Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Driving Continuous Improvement Through Blast Design Technologies in a Surface QuarryBy Toby Forney, Joshua Schoonover
In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,
Feb 6, 2023
-
Journal: Blast Vibration and Seismograph Section / A History of the Development of Instruments for Measuring Vibrations of the Earth / Part 4By Robert Hopler
Although electrical instruments were being widely introduced into the study of seismic tremors, attempts to understand and quantify shocks from blasting continued to use rather primitive methods well
Jan 1, 2007
-
Occidental's Resorts 7 and 8 Blasting Design and ResultsBy Thomas E. Ricketts
Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima
Jan 1, 1984
-
Blast Design and Mill Performance – A Case HistoryBy Raj K. Rajamani, Solomon A. Tucker, Michael K. McCarter
"In a study aimed at exploring possible improvements in operating performance at an Open Pit Copper (OPC) mine in the western U.S., the impact of blast energy changes on crushing performance was evalu
Jan 1, 2017
-
Regression Model for Surface Vibrations from Underground OperationsBy Tristan Worsey, Nathan Rouse, Daykin Schnell
The authors were retained by a proposed underground metals mine operation to evaluate the potential blast vibration amplitudes that could be generated at surface structures above the proposed mine. Li
Feb 1, 2020
-
Success Case: Technical and Operational Assurance of Blasting Near Neighboring Mine StructuresBy Hector O. Romero, Paulo C. Fernández A, Claudio C. Gajardo
Phase 06 of the Los Bronces mine, currently under extraction for development, has the particularity of being close to the installations and buildings of a neighboring copper mine. Therefore, the blast
Jan 21, 2025
-
Fragmentation from Pattern Expansion with Electronic Detonators at the Red Dog MineBy Norman Paley
A blasting project was undertaken at the Teck Alaska Red Dog Mine in 2005 to 2007 to determine the extent that using electronic detonators could increase Semi-Autogenous Grinding (SAG) mill throughput
Jan 1, 2012
-
Direct Stress Monitoring of Pipelines and Development of Limitations – A Case StudyBy Travis A. Davidsavor, David A. Provost
A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep
Feb 1, 2020
-
Blasting Conditions Couldn't be WorseBy John Atkinson, Steve Repola
This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different
Jan 1, 1993
-
ISEE Security Workshop Impact of Enhanced Security on OperationsBy Dyno Nobel
Impact of Enhanced Security on Operations Budgeting - What is the “value” I receive for enhanced security? Is there a “return” for the money I spend? Regulatory driven Economic driven
Jan 1, 2006
-
Journal: History of ISEE – Timeline / 35 Years1974 The Society of Explosives Engineers officially formed to “advance the art and science of explosives engineering” on August 20, 1974 in Pittsburgh, Pennsylvania.
Jan 1, 2010
-
Damage to Rock: Near Field Seismic Models RevisitedBy Santiago Gómez, Pablo Segarra, José A. Sanchidrián
In this paper, differences between the industry-standard Holmberg-Persson (H-P) approach and a semi-analytical vibration prediction model called full-field solution (FFS) are analized. The analysis is
Feb 1, 2020
-
Direct Stress Monitoring of Pipelines and Development of Limitations – A Case StudyBy Travis Davidsavor, David Provost
A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep
-
Ring Blasting Mine to Mill OptimizationBy Joel Chipana, Roberto Laredo, Benjamin Cebrian
Ring blasting is a common production method in underground metal mines. As a drill and blast process, it presents particular features that do not correspond with bench blasting in open pit or undergro
Jan 1, 2017
-
Response Of Typical Wall Panels To Debris And Fragment ImpactBy John Tatom, Michelle Crull, Robert Conway
The US Department of Defense Explosives Safety Board is sponsoring the development of a risk-based explosives safety siting program, SAFER. The fragment and debris hazard generated at the potential ex
Jan 1, 2010
-
Remotely Piloted Aircrafts (RPAs) as an Everyday Tool for Quarry Planning and Blast Design.By Jose Luis Pineda Villarreal
New technologies emerge every day with practical applications for open pit mining. For every operation, managers need to understand the best way to increase efficiency in drilling, blasting, fragmenta
Jan 1, 2018
-
Influence of Environment on Explosively Driven Shock Waves in AirBy Joshua Hoffman, William Chad Wedding, Braden Lusk
The University of Kentucky employs an explosively driven shock tube in the course of experimentation. A good deal of the work completed relates to the verification of blast mitigation products and str
Jan 1, 2011
-
Surveying the Damage: Post Traumatic Stress and Pre-Blast SurveysBy Jeffrey Loeb
Recent trends in blasting engineering and its related fields, at the level of professional academia, have tended to exclude detailed discussion and examination of the formative experiences of the engi
Jan 1, 2009
-
Underground Mega Mass Blasting with Electronic Initiation Near Urban Area (d4770d5b-0062-4b3c-9658-460485a3a3f4)By Jean-Francois Lagueux, Andre Pomerleau
Goldex Mine is an underground mine located near the town of Val-d’Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to eco
Jan 1, 2011
-
Blasting Works Quality Management in Accordance with Environmental ConditionsBy Rolf R. Schillinger
It is established to an increased extent that the basic questions about raw material extractions deal with water, dust, noise and vibrations. If it has not been definitely proven that these points won
Jan 1, 2002