Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blast Optimization of Hard Ores at Phu Kham Open Pit

    By Wayne Rogers, Kell Monro, Arthur Pacunana

    The Phu Kham Copper-Gold Operation (PKM) is a large-scale open pit mine located in northern Laos. It was developed and is operated by Phu Bia Mining Limited (PBM) a Lao-registered subsidiary company o

    Jan 1, 2018

  • ISEE
    Blasting and Comminution Choices for the Management of the Mining Business

    By Alexandre Passos, Giorgio De Tomi, Tatiane Marin, Dennis Cremonese, Jacopo Seccatore

    "In the mining industry, rock excavation is the first phase of the comminution process. Downstreamoperations such as secondary breaking, crushing and milling terminate the process, reducing the size o

    Jan 1, 2016

  • ISEE
    Strategic Public Relations for Underground Conservatory at Tennessee Governor’s Residence

    By Jake Hutchison, Wade Hutchison

    The opposition to the project has risen as a result of some political pressures and from public perceptions about the project’s necessity and its impact on the neighborhood. As a result of this contro

    Jan 1, 2009

  • ISEE
    Explosives Control Legislation in the New Congress

    By Reynold N. Hoover

    The bombing of the Murrah Federal Building in Oklahoma City, Oklahoma, on April 19, 1995, has once again renewed public debate surrounding the availability and use of explosives in the United States.

    Jan 1, 1996

  • ISEE
    Levee Removal by Explosives, Upper Klamath Lake, Oregon

    By Quentin Rhoton

    To benefit two endangered fish species, waterfowl and other wildlife, and water quality in the lake and downstream, the decision was made to remove levees that had been in place since the 1950s. Becau

    Jan 1, 2009

  • ISEE
    3D Computer Simulation of Bench Blasting With Precise Delay Timing

    By Dale Preece, C. Mick Lownds

    Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precisi

    Jan 1, 2008

  • ISEE
    Impact of Blasting on Downstream Process to Maximize the Profitability of Mining Industries

    By Kyle Wagner, William Joa, Colter Angell, Catherine Johnson, Marty Langenderfer, David Doucet

    The goal of any business is to seek the maximum profitability for the organization through optimization the use of resources, processes and the application of new technologies. An analysis of various

    Jan 1, 2019

  • ISEE
    Testing a Crisis Management System via the Simulation of a Bulk Emulsion Truck Fire - Learning Through Collaboration

    By Rob Farnfield, Ben Williams, Ashley Haslett, Diane Cartledge

    Major accidents that occur within our industry are often tragic and expensive, damaging reputation and threaten the livelihood of the business. There isn’t anything in them that can be seen as positiv

    Jan 1, 2016

  • ISEE
    A Survey to Better Understand Collegiate Talent for Recruiting Purposes

    By Paul Sainato

    Recruiting and retaining students in the explosives industry is becoming increasingly important each year. With no undergraduate degree in explosives engineering currently available in the United Stat

    Jan 1, 2016

  • ISEE
    Principles and Controls for Close-In Blasting Structures

    By Wilfred G. Comeao

    Close-in blasting occurs every time the use o f explosives for excavation or demolition requires the surpassing of the commonly accepted cosmetic damage criteriain order to arrive at reasonable and pr

    Jan 1, 1991

  • ISEE
    Modeling of Dynamic Break in Underground Ring Blasting

    By Troy Williams, Chris Preston, Ian Lipchak

    "Underground blasting operations are challenging from the standpoint of the distribution of explosivesenergy representative of ring blasting. Energy from both shock and pressure regimes of commerciale

    Jan 1, 2016

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

  • ISEE
    High-wall Control at Anglo Gold Ashanti, Navachab Mine

    By Charles Pretorius, Henk Ludik

    Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting

    Jan 1, 2006

  • ISEE
    Blasting Overhangs Close to a Vibration Sensitive Structure

    By R. Franfield

    This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked

    Jan 1, 2009

  • ISEE
    An Experimental Method for Producing a Micro-Particle Ammonium Nitrate (MP-AN)

    By Christopher Jon Preston

    This paper describes a type of ammonium nitrate (AN) produced in a patented experimental atomization/aerodynamic process. This AN exhibits outstanding properties for use as a main ingredient to a new

    Jan 1, 2015

  • ISEE
    Regulatory Control of Blast Vibration Levels in the UK

    By Rob Farnfield

    In the UK all new developments, including mines, quarries, tunnels, etc., are subject to a system of planning control. If the use of explosives is anticipated then such developments will attract a num

    Jan 1, 2005

  • ISEE
    Precision Presplitting Optimization

    By Anthony J. Konya, Calvin J. Konya

    Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya

    Jan 1, 2016

  • ISEE
    Delay Blasting Cap Corrosion of the Nonel by Acid Water

    By Noelia Valencia, Carlos Agreda, Jean Arenales, Juan Llerena

    "In this technical paper is reported the several tests and the preliminary results that has been obtained so far. It must be emphasized that this investigation was started several months ago.On the ot

    Jan 1, 2016

  • ISEE
    A Case Study of Near-Field Vibration Monitoring, Analysis, And Modeling

    By Tamara Whitaker, James Gunderson, Ruilin Yang

    This paper presents the results of a vibration control project conducted in soft overburden at a surface coal mine located in the western United States. The study uses near-field blast vibration monit

    Jan 1, 2008

  • ISEE
    Cap Precision in Perimiter Control Blasting and the Potential Application of Electronic Detonator

    By Derek T. Novotny

    Blasting cap precision is of major importance to advanced blast design. New technologies have introduced the use of microchips within detonator casings in the hope that the electronic control of the t

    Jan 1, 1998