Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, California

    By Steve Thoman

    After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic

    Jan 1, 1996

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • DFI
    Large Diameter Machine Bored Piles In Australia

    By W. J. Kingwell

    Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of

    Jan 1, 1989

  • DFI
    Pile Load Tests

    Case I- Timber Pile Test- 4 pages describe the pile driving record, the pile load test and the boring log. Case II- 24 inch square prestressed concrete pile-5 pages give details about the pile dri

    Jan 1, 1988

  • DFI
    Recent Advances In Soil Nailed Earth Retention

    By Tom A. Armour

    Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&

    Jan 1, 2003

  • DFI
    A Tale of Two Dams: Performance of Deep Cutoff Walls

    By Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders

    "This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv

    Jan 1, 2017

  • DFI
    Damage To Initially Bent Piles ? Synopsis

    By B. B. Broms

    A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of

    Jan 1, 2010

  • DFI
    Soil Displacement Caused By Pile Driving In Clay

    By K. Rainer Massarsch

    The effects of soil displacement caused by pile driving on adjacent piles and structures are discussed. A method is proposed to estimate the point of force equilibrium which makes it possible to calcu

    Jan 1, 1989

  • DFI
    Diaphragm Walls, Recent Developments to Improve Reliability

    By A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen

    "Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual

    Jan 1, 2014

  • DFI
    Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa

    GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA

    Jan 1, 2001

  • DFI
    Development Of Design Practice For Piles In Stiff Glacial Till

    By Kenneth Gavin

    Design practice for piles installed in Irish glacial till has developed in an ad-hoc manner, based on the results of un-instrumented load tests. This had led to designers using similar design paramete

    Jan 1, 2009

  • DFI
    Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA

    By Rudolph P. Frizzi

    This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary

    Jan 1, 2003

  • DFI
    Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult Conditions

    By J. C. W. M. de Wit

    An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the

    Jan 1, 2006

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • DFI
    CSM Cutter Soil Mixing - A New Technique For The Construction Of Subterranean Walls Initial Experiences Gained On Completed Projects

    By E. Stoetzer

    In all known deep mixing processes the existing soil is mixed with self hardening slurry by mixing tools that rotate about a vertical axis (augers, mixing paddles). Wall panels are constructed using s

    Jan 1, 2006

  • DFI
    Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability Challenges

    By Shawna Munn, Jakub Hudler

    This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines

    Jan 1, 2018

  • DFI
    Contact Pressure Characteristics Beneath Deep Foundation Of Beijing International Hotel ? Synopsis

    By X. L. Huang

    This paper deals with the experimental and theoretic study of the contact pressure beneath the deep foundation of Beijing International Hotel, The experiments have been carried out in project and in m

    Jan 1, 2010

  • DFI
    Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites

    By John P. Davis

    The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s

    Jan 1, 2006

  • DFI
    Deep Excavation Retaining Systems In Unsaturated Soils

    By Tariq B. Hamid

    Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav

    Jan 1, 2006

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989