2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
-
Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?By Jorj Osterberg
550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t
Jan 1, 2001
-
Case History: Comparison of CSL Results to Physical ObservationsBy David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Micropiles Take Off at Dulles AirportBy Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
Design of Pile Foundations in Liquefiable, Laterally Spreading GroundsBy Arash Khosravifar
One of our research thrusts at Portland State University (PSU) centers on developing design guidelines for pile foundations in liquefiable, laterally spreading grounds. This research has been primaril
Nov 1, 2023
-
Route 9A Pedestrian Tunnel at the World Trade CenterBy Raymond E. Sandiford
"The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit
Jan 1, 2012
-
Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT SubwayBy Dharmil Patel, Michael J. Chow
"Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;
Jan 1, 2016
-
The Effect of Helix/Wing Plate Deformation on End Bearing Resistance of Screw PilesBy Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"The use of steel screw piles has greatly increased in recent years because of the advancement in the installation mechanism and its performance under compressive, uplift and lateral loads. In a steel
Jan 1, 2015
-
High Capacity Drilled Piles in BrooklynBy Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe
"The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount
Jan 1, 2016
-
Shoring Up D.C.'s Historical Foundations: Collection 14By Alan Quiroga
Nestled between Meridian Park and Howard University in the heart of Washington, D.C., the historic block between 14th, V and W streets North- west featured several original struc- tures, many of them
Aug 1, 2023
-
Instrumented Pile Load Tests In The Area Of Pearl Harbor, HawaiiBy John Y. L Chen
This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex
Jan 1, 2002
-
Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal MineBy Stephan Fisch, Franz-Werner Gerressen
"The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining
Jan 1, 2017
-
Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay SeawallBy Pierre Gouvin
"This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas
Jan 1, 2017
-
Completely Automatized Recognition of the Installation Process in Special Foundation ConstructionBy Christian Hoyme, Jochen Maurer, Hans Regler
Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be
Sep 8, 2021
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain GeologyBy Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction (50051f21-259c-48c8-b98a-08fa9c39001e)By Michael Arnold, Robert Bachus, Michael Bracher, Jamey Rosen, Robert Roff
"For a high hazard USACE facility, the Center Hill Dam in Tennessee, several disparate streams of data were compiled into a single geospatial and relational enterprise data management system to store,
Jan 1, 2017
-
Nyct's 207th St Yard FloodwallBy Christian L. Escalera
Over seven years ago, on October 29, 2012, Superstorm Sandy pummeled the Northeast of the United States inflicting heavy damage on New York City Transit’s (NYCT) system. Since then, NYCT has been meth
-
Keynote Lecture 3: G. Stuart Littlejohn Compensation and Permeation GroutingBy G. Stuart Littlejohn
In spite of recent concerns in certain European countries, I believe that silicate-ester grouts will continue to be employed in practice, unless more cost-effective inorganic grouts are developed for
Feb 10, 2003
-
Corroboration and Remediation Options"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga