Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
Secant Pile Walls - A Consistent Approach to Risk ManagementBy Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005
-
D-Wall Extreme – Contrast Between Going Deep And Getting SmallBy Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-
May 1, 2022
-
St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test ProgramBy Jeffrey A. Gebhard
As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes
Jan 1, 2009
-
Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)By George Piscsalko
"Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
Jan 1, 2017
-
Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT ProjectBy Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa
"In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati
Jan 1, 2015
-
The Power of Committee Research: The DFI Rock Socket ProjectBy Anne Lemnitzer
Experimental data are the cornerstone of scientific research, providing empirical evidence to validate hypotheses, test theories, inform decision-making and help develop innovative design and analysis
Nov 1, 2023
-
Steel Innovation: Changing the Economics of Below Grade FoundationsBy Dean Abbondanza
"Below grade foundation design has construction issues that above grade foundations do not. These cost factors are dependent on soil conditions and vary by region, but for the most part, the process r
Jan 1, 2005
-
St. Anthony Falls I-35W Bridge - Deep Foundation Monitoring Methods And Equipment For Bridge ConstructionBy Bryan C. Field
The proposed construction schedule for the St. Anthony Falls I-35W Bride challenged the abilities of the design-build teams to utilize the best and most efficient methods to meet Minnesota Department
Jan 1, 2009
-
A Collaborative Approach To The Design And Delivery Of The Most Heavily Loaded Piles Ever Constructed In The UkBy Morris J. D, Baldwin Z., Wiltcher P. M
21 Moorfields is an oversite development in central London spanning Moorgate tube station. It required the installation of both the highest loaded bearing piles and the highest top loaded static pile
-
Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002By Colin Curtis
The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an
Jan 1, 2002
-
Ground Improvement By Jet Grouting For A Natural Gas Combined Cycle Power Plant In TurkeyBy Alp Gokalp
The aim of this article is to present an application of jet grouting technique in stiff clays for foundations of the natural gas combined cycle power plant, under construction in Aliaga, Turkey. The p
Jan 1, 2002
-
Design And Construction Of Drilled Shafts In IraqBy Frederick C. Rhyner
The United States government sponsored the construction of a new vehicular bridge over the Diyala River in Bubriz, Iraq. This paper describes the geotechnical engineering for design and construction
Jan 1, 2009
-
The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?By Manfred Schoepf
"Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import
Jan 1, 2015
-
Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of StructuresBy A. A. Gupte
Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use
Jan 1, 1989
-
Case Study Of Three Bidirectional Static Load Tests For Bored Piles At Sabana Costa RicaBy Mauricio Coto
Three bidirectional static load tests (BDSLT) were executed on bored concrete piles, as part of the permanent foundations for two buildings sites located at the Sabana, San Jose, Costa Rica, separated
-
Pile Foundation, Retaining Structures For Deep Excavation And Anti-Buoyancy Anchors In Shanghai Soft SoilsBy Sun Gengsheng
Geotechnical properties of soils, usual types of pile foundations, pile capacity, calculation of settlements of pile foundations, usual types of retaining structures for deep excavation, stability ana
Jan 1, 1991
-
Woodrow Wilson Bridge CofferdamsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2005
-
Integration Of Real Time Pile Design By Means Of Building Information ModelingBy Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck
The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly
May 1, 2022
-
Stone Columns At Trenton Water Treatment Facility - Suitable Alternative To Remove And Replace For Mat FoundationBy Darrell Wilder
The Trenton Water Treatment Facility in Trenton, New Jersey, is expanding to upgrade existing facilities and to meet the increasing demands of the public. The facility sits uncomfortably between the
Jan 1, 2008