    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • CIM
    Improving Fluorine-Bearing Minerals Rejection in the Flotation of a Brazilian Sulphide Copper Ore

    By Keila Gonçalves, Aline Tavares, Danielly Couto

    "The sulphide copper deposits from the Carajás area (North region of Brazil) were generated by the percolation of hydrothermal fluids in volcanic and granitic rock and are denominated as IOCG deposits

    Jan 1, 2011

  • CIM
    Utilizing Strain Criteria to Predict Highwall Stability Performance

    By H. Warren Newcomen

    Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents

    May 1, 2004

  • CIM
    Systematic and Integrative Ore Characterization of Massive Sulfide Deposits: An Example from Voisey’s Bay Ni-Cu-Co Ovoid Orebody, Labrador, Canada

    By P. J. Sylvester, D. H. C. Wilton, R. I. Wheeler, M. A. E. Huminicki, D. Evans-Lamswood

    "Systematic characterization of the mineralogy of massive sulfide ore deposits can provide valuable insights into ore genesis and metallurgical processing that would not be apparent otherwise. We desc

    Jan 1, 2012

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    The Effect of Lump Ablation on Pressure Gradient in Oil Sand Hydrotransport Pipelines

    By D. Wolfe, K. Reid, T. Nunn

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. In order to minimize front-end rejects, and to allow for high throug

    Jan 1, 2014

  • CIM
    The integration of condition monitoring into the maintenance process (16e8fde4-e738-4229-a500-8c29dcc904ed)

    By M. W. Lewis, J. Werner

    Fluctuating metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to r

    Jan 1, 2005

  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987

  • CIM
    Environmental planning in mine waste management — The Huckleberry Mines experience (CIM BULLETIN)

    By H. F. Letient, D. C. Johnson

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    Jan 1, 2004

  • CIM
    Nanoparticle Flotation Aids for Pentlandite Fines

    By Manqiu Xu, Songtao Yang, Zongfu Dai, Robert Pelton, Carla Abarca

    "Fine mineral particles are difficult to process by flotation because of their low collision efficiencies with air bubbles. Decreasing air bubble size and increasing mineral particle size through floc

    Jan 1, 2015

  • CIM
    Effect of Pulp Temperature on Copper and Gold Collectors at Hudson Bay Mining and Smelting

    By Karl Hoover, Cassandra Spence, Brent Bachewich, Jaakko Levanaho

    "Since year 2000 the gold recovery into copper concentrate at Hudson Bay Mining and Smelting has reduced considerably during the summer months. This initiated a testwork program in the fall 2003 to fi

    Jan 1, 2005

  • CIM
    Technical Challenges in Laser Additive Manufacturing of Metallic Parts

    By J. Y. Hascoet, M. Marya, S. Marya

    Additive manufacturing (AM) brings disruptive changes over the ways parts and products are designed, tested, qualified, assembled, inspected and marketed. With these changes come real technical challe

    Jan 1, 2014

  • CIM
    New Developments in Process Mineralogy of Platinum-Bearing Ores

    By Louis J. Cabri

    "Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum

    Jan 1, 2004

  • CIM
    The Challenges and Ramp op of Filtered Tails in a Modern Production Plant – Éléonore Project Experience

    By Andy Fortin, Jeet Basi, Simon Hille

    Goldcorp’s Eleonore mine is situated in Ell Lake area in the northeastern part of the Opinaca reservoir in the James Bay region of Quebec. The design of the 7000 t/d process plant includes crushing,

    Jan 1, 2016

  • CIM
    Geology, 40Ar/39Ar geochronology and Sn-W-Mo-bearing sheeted veins of the Mount Douglas Granite, southwestern New Brunswick

    By M. J. McLeod, D. R. Lux, R. P. Taylor

    "The Mount Douglas Granite constitutes the eastern part of the Saint George Batholith and contains the youngest, most differentiated phases of the batholith. It also contains extensive endogranitic, l

    Jan 1, 1988

  • CIM
    Architecture of Gold Mineralization at Anomaly A of the Clarence Stream Deposits, Southern New Brunswick

    By A. J. Hynes, Lutes. G. G., Ravenelle. J. -F.

    "The Anomaly A area of the Clarence Stream gold deposits in southwestern New Brunswick contains mineralized structures that bear geometrical relationships to regional folding events. The four minerali

    Jan 1, 2008

  • CIM
    Canadian Diamond Industry: An Overview

    By Robert Boyd

    The Diamond Markets ? Supply has continuously increased over the past 25 years ? However, global supply is expected to drop by 1 to 2% by 2015 ? Demand Driven Market ?Demand is expected to grow 3%

    May 1, 2006

  • CIM
    World?s Largest 28 MW AG Mills, Largest Shop Trial, One Piece Delivery & Installation

    By Rajiv Kalra

    This paper reviews the following aspects of the world?s largest manufactured Grinding Mill?s in terms of diameter and power, along with the world?s biggest shop assembly and trial run of the mills del

    Jan 1, 2012

  • CIM
    Technology Options and Innovation for Copper Heap Leaching

    By Damian Connelly

    The metallurgical heart of the majority of copper oxide processes is the heap leaching operation. Fresh low grade sulfide ores is a far greater challenge.The success of this unit operation is so impor

    Jan 1, 2019

  • CIM
    High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?

    By James A. Finch, Stéphanie Somot

    "The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc

    Jan 1, 2006