Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Investigation of Permascand Coated Titanium Anodes in Copper Electrowinning at Glencore Nikkelverk

    By J. Gustavsson, S. Holmin, Å. Afvander, E. Rosseland, E. Zimmerman

    There are numerous advantages in replacing lead-based anodes with mixed metal oxide (MMO) coated anodes in copper electrowinning; for example, lower energy consumption, improved working conditions for

    Jan 1, 2019

  • CIM
    Reliability Analysis of the Mine Ventilation System Branch

    By Y. Duna

    The reliability of mine ventilation systems is critical to normal and safe production in a mine and includes reliability of the following parts: ventilation system branch (or passage), ventilation str

    Aug 1, 2013

  • CIM
    Triggered Rockbursts and Induced Rockbursts

    By Jian Deng

    Rockbursts are sudden and violent failure of rocks in deep and/or high stress mines, which may destroy the excavation space and cause an accident or even the death of mining workers. This study is mot

    Jan 1, 2015

  • CIM
    Numerical Modelling of Longwall Panels as an Aid to Mine layout Design

    By D. J. Reddish

    The paper describes a case study where numerical modelling has been applied to predict potential risks associated with inflows of water in active mine workings from an overlying sandstone aquifer. The

    May 1, 2003

  • CIM
    Copper Electrowinning Developments at Glencore Nikkelverk

    By E. Rosseland

    Glencore Nikkelverk is operating its Chlorine Leach Process in Kristiansand, Norway, producing nickel, copper and cobalt metals by electrowinning. The copper tankhouse, with an annual capacity of 40 0

    Jan 1, 2019

  • CIM
    Mineral Deposits of Hudson Bay Territory

    By R. C. Wallace

    In the early explorations of the Northwest, the search for minerals played a not inconsiderable part. The first episode had its disillusioning sequel. Sir Martin Frobisher, in 1576, sailed up that bay

    Jan 1, 1925

  • CIM
    The Nova Scotia Mobile Mining Plant

    By J. P. Messervey

    Dr. K. A. Clark: No one will doubt the statement of fact that, during drilling operations through the bituminous sand beds in the Mildred-Ruth Lakes area, the core-barrel was found to contain bitumen

    Jan 1, 1947

  • CIM
    Role of Particle Aggregation in Fine Sphalerite Flotation Studied by On-Line Visualization

    By J. W. Choung, T. Fu, Z. A. Zhou

    An on-line visualization technique and methodology was developed to investigate the role of fine sphalerite (< 10 um) aggregation in flotation. The images of particle aggregates under different operat

    Jan 1, 2004

  • CIM
    The history of gold discoveries in Canada - an unfinished story

    By Donald A. Cranstone

    "This paper provides a bird&apos;s eye view of the pattern of gold discoveries since 1823, the year of Canada&apos;s first gold find, up to 1983. Within this 160-year period, more gold was discovered

    Jan 1, 1985

  • CIM
    SO2 emission control from the Kidd Creek copper smelter

    By D. A. Bordin, C. J. Newman, R. J. St. Eloi

    "The requirements for a metallurgical acid plant treating smelter gases are both unique and demanding in terms of sulphur dioxide treatment and emission control. Since start up in 1981, the copper sme

    Jan 1, 1989

  • CIM
    A Numerical Model for Fracture Propagation Leading to Primary Fragmentation in Block Caving Mines

    By M. Nejati, A. Paluszny, R. W. Zimmerman

    A numerical method is proposed to propagate multiple discrete fractures leading to primary fragmentation in a mine that is being worked using block caving. Deformation is computed using the finite ele

    Jan 1, 2015

  • CIM
    Factors influencing the selection of mine hoist electrical drives

    By B. C. Legg, G. L. Tiley

    "Many of the ore bodies presently being developed are in remote locations and are, or will be, served by electrical power supply systems of limited capacity.The largest single components of the electr

    Jan 1, 1993

  • CIM
    Model Predictive Control as a Tool for Production Ramp-Up and Optimization at the Nkomati Nickel Mine (f9e698a2-cbdb-4f4f-bd3e-792b4bb440cd)

    By K. Becerra, D. G. Almond, T. D. Maru

    "Nkomati Nickel Mine in South Africa processes one of the world’s hardest ores in a 375k TPM autogenous grinding circuit. The plant employs an unconventional processing circuit, comprising a primary a

    Jan 1, 2012

  • CIM
    Roasting of Arsenic Containing Gold Ores/Concentrate using a Two Inch Semi-Continuous Fluid Bed Roasting Unit

    By A. Roy, T. LeBel, P. Coursol, P. Lind

    At the early stage of a mining project, small amounts of concentrates are available for testwork. For gold concentrate or ores containing significant arsenic levels, batch bench scale roasting is ofte

    Jan 1, 2014

  • CIM
    Overview of SEDEX Pb-Zn deposits

    By Suzanne Paradis

    Geographic distribution ? Deposit economics ? Temporal distribution ? Tectonic settings ? Basin architecture ? Morphology ? Ore-fluid chemistries Key exploration criteria

    May 1, 2006

  • CIM
    Suncor Energy Inc. - Oil Sands

    By Brad Bjornson, Geoff Stevens, Mike Ashar, Cliff Britch

    "LocationThe facilities are located 30 km north of Fort McMurray, Alberta (or 470 km northeast of Edmonton, Alberta).Brief Description of OperationThe operation includes the mining of oil sands, extra

    Jan 1, 2000

  • CIM
    Experimental and Numerical Analysis to Determine the Transition from Mode-I to Mode-II Fracture

    By Rakesh Kumar, Rajabrahma K., A. K. Verma, V. Mukesh

    "In this study, laboratory investigation as well as numerical investigation is carried out to ascertain the transition from one mode to another for Semi-circular bend setup. Laboratory investigation i

    Jan 1, 2015

  • CIM
    Agnico Eagle LaRonde plant: Metallurgical challenges present and future

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • CIM
    Characterization and Synthetic Simulations to Determine Rock Mass Behaviour at the El Teniente Mine, Chile

    By D. Mas Ivars, K. Suzuki, J. A. Vallejos

    "A comprehensive geotechnical characterization has been undertaken at the El Teniente mine to describe and determine the rock mass behaviour strength properties of the primary copper ore. The Syntheti

    Jan 1, 2015

  • CIM
    Advancements in Commercialization of de Nora’s “Self Protected Anode – SPA” for Metal Electrowinning

    By L. Iacopetti, A. Calderara, M. Perego, P. Perrone, T. Furusawa

    De Nora, a global leader in the development, manufacture and sale of all DSA® anodes based on titanium coated with mixed metal oxide (MMO) for electrochemical processes will present key advancements m

    Jan 1, 2019