Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Now is the Time for Light Weight

    By Gerald S. Cole

    It used to be that a science/engineering presentation on "light weight" at a metallurgy conference, would relate to the materials science, processing, component fabrication and applications of aluminu

    Jan 1, 2014

  • CIM
    Development of Gold-Sponge Catalysts for Lean-Burn DeNOx

    By Gary Pattrick

    A new class of spongy Au catalysts is studied for the selective catalytic reduction of NOx by propene under leanburn conditions. The spongy catalyst is an unsupported powdered Au that consists of micr

    Oct 1, 2003

  • CIM
    Analysis on Roadway Roof Bed Separation Affected to Bolt Loading and Support Design in Engineering

    By Shuan-cheng Gu

    Roof bed separation often occurred due to the deformation incoordination of surrounding rock following the excavation of mine roadway. Bed separation has effect on the bolts, and the estimation of the

    Aug 1, 2013

  • CIM
    Influence of Cooling Rates on Microstructure and Mn Supersaturation in High-Speed Twin-Roll Cast Al-Mn Based Alloy Strips

    By Ram Song, Yohei Harada, Shinji Kumai, Kazuho Otsuka

    "Recently, vertical-type high-speed twin-roll casting (HSTRC) has been developed. The HSTRC shows extremely high cooling rates over 1,000 K/s even at the mid-thickness area. The fabricated strip has m

    Jan 1, 2018

  • CIM
    Temper Embrittlement in Hot-Dip Galvanized Steel Platform Structures

    By L. Callele, C. DiGiovanni, L. Li, R. Driver

    "Hot-dip galvanizing is a common procedure used to protect structural steels from corrosive environments. However, in a construction project involving welded structural steel platforms by a Canadian s

    Jan 1, 2017

  • CIM
    Design, development, and verfication of a Lovat 7.6-metre full-face tunnel-boring machine

    By R. Lovat, J. A. Hunter

    "The design, development, and verification of the Lovat 7.6metre diameter full-face tunnel-boring machine is reviewed. Programmatic and technical challenges are outlined with a review of the specifica

    Jan 1, 1984

  • CIM
    Single Pass Bolting Approach for the Stabilisation of Rock Masses in High Stress Conditions

    By François Charette

    High stress conditions in underground mines push the performance envelope of support systems to their limit. In weak rock masses these conditions lead to large deformation and breakdown of the rock ma

    Nov 1, 2011

  • CIM
    Is the Mineral Resource Grade Estimate Realistic?

    By Terry A. Lee

    The grade of mineral resource estimates underpin all major economic considerations of mining prospects. While there are reporting requirements to satisfy when stating a mineral resource estimate, an

    Apr 1, 2005

  • CIM
    Identification Stain for Chrysotile Asbestos

    By Maurice Morton

    THE use of organic and inorganic stains has found wide application as a means of detection and estimation of organic fibres. Such stains have enabled the analyst to distinguish between organic fibres

    Jan 1, 1941

  • CIM
    Archean and Paleoproterozoic Geology and Metallogeny of the Southern Canadian Shield

    By K. D. Card, K. Howard Poulsen

    Abstract - The Archean Superior Province craton and the Paleoproterozoic Penokean Orogen are major geological sub-divisions of the southern Canadian Shield and account for much of the metallic mineral

    Jan 1, 1998

  • CIM
    Selective continuous surface miners and their possible applications in oil sands mining

    By T. S. Golosinski

    "This paper reviews the types of selective continuous miners (SCMs) available at present, and compares their main features. Furthermore, operating practices and mine planning aspects of the SCMs appli

    Jan 1, 1989

  • CIM
    La Mine Doyon mill expansion

    By G. H. Hope, A. R. Maycock

    "La Mine Doyon is a gold mining operation located in northwestern Quebec, approximately 35 km east of Rouyn-Noranda and 85 km west of Val d'Or. The mine is jointly owned by Lac Minerals Ltd. and

    Jan 1, 1988

  • CIM
    Metal Mine Ventilation (5a66f77a-e32a-4b69-828a-81ebc3b32b9e)

    By D. Harrington

    Ventilation of underground workings consists in establishment of such control of air currents that the underground workers may work in safety, with maximum comfort and efficiency, and without impairme

    Jan 1, 1933

  • CIM
    Mass And Energy Balances For Metallurgical Gas Handling System In Chagres Smelter

    By P. Duran

    The metallurgical gas handling system at Chagres Smelter, like that of many smelters, can be the limiting constraint to processing more concentrate through the smelter. Mass and energy balances for th

    Jan 1, 2007

  • CIM
    New techniques in blast monitoring and optimization

    By Norman J. Tienkaivip, Christopher J. Preston

    "This paper describes the use of electronics for physical measurement and computer analysis in both open-pit and underground mining operations for the ultimate purpose of optimizing production blasts.

    Jan 1, 1984

  • CIM
    Dynamic Tests of a New Type of Energy Absorbing Rock Bolt ? The D Bolt

    By C. C. Li

    The D bolt is a new type of energy-absorbing rock support element recently developed in Nor-way. The D bolt is not only able to accommodate large rock deformations, but can also provide a load-bearing

    May 1, 2009

  • CIM
    New technology in conveyor transmission systems

    By L. R. Bower

    "This paper describes a highly versatile variable speed unit with a torque multiplication feature as a direct replacement for a fluid coupling .The unit is comprised of a modulating clutch with torque

    Jan 1, 1986

  • CIM
    Application of electric-hydraulic drilling at Falconbridge Nickel Mines Limited

    By K. H. Singh, J. N. Szuck, J. A. Riddell

    "Hydraulic rock drilling equipment has been in use at Falconbridge over the past two years in both production and development situations. This paper deals with the experience gained in the application

    Jan 1, 1982

  • CIM
    New triangular raise cribbing technique for rockburst prone backfilled stopes

    By J. H. Archibald

    "In mines employing cut-and-fill stoping (sand fill), ore passes are built as mining progresses upward. These ore pass raises are generally made from timber and form a vertical ""chimney"", like a ver

    Jan 1, 1991

  • CIM
    Rock fragmentation and the design of underground materials handling systems

    By G. D. Just

    "Extensive mechanization of underground mining operations, improvements in blasting technology and the development of simulation models for systems evaluation has now made it feasible to optimize rock

    Jan 1, 1980