Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • CIM
    Evaluation of the Performance of a CIP Gold Recovery Process

    By M. Courchesne, C. Barbery, D. Hodouin, C. Carrier

    "The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat

    Jan 1, 1987

  • CIM
    Atlas Copco drill rigs for mine automation and communication—A totally new technology platform for advanced mining systems

    By M. Ramström

    "In 2002, Atlas Copco Rock Drills AB released the new rig control system (RCS) technology for all of its drill rig types. RCS opened the way for a new generation of computerized drill rigs based on mo

    Jan 1, 2005

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    The Union Bay Platinum Prospect, SE Alaska, a Hydrothermal PGE Deposit

    By C. J. Van Treeck

    PGE concentrations of 18 g/t occur in the pyroxene rich rocks at the Union Bay Alaskantype complex. This PGE enrichment is hosted in magnetite veins. These veins cross magmatic layering and have an ir

    May 1, 2003

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    The San Martin project: design and operating experience in the development of a 12,000 tpd gold heap leach mine in Central America

    By Paul Hosford, Tim Haldane

    "The paper describes the fast-track development of the project from feasibility study through to detailed design and construction, highlighting the process adaptations for handling sticky ore and wate

    Jan 1, 2002

  • CIM
    In-Plant Hydrogeochemical Mapping: A Tool to Localise Potential Deleterious Reactions Due to Water Quality in a Process

    By Mohamed Ourriban, Stéphanie Somot, Éric Proulx, Jean-Sébastien Marois, Marjolaine Drouin, Paul Blatter, Ahmed Bouajila, Claude Gagnon

    "The mining industry has to face increasing restrictions concerning the use of fresh water in Québec and throughout the world. Increasing recirculated water usage could lead to a better control of the

    Jan 1, 2012

  • CIM
    Mining for Space Why now?

    By Michel Doyon

    Canadian Context: Exploration ??Space Exploration is within the unique mandate of the Canadian Space Agency ??Global partnerships ??Maintain close relationship with our partners ??New knowledge

    May 1, 2009

  • CIM
    Cyanidation in Grinding Circuit: Evaluation of Leaching Parameters in Grinding and Cyanidation Addition Strategy

    By J. Châteauneuf, R. Dupéré, D. Mrabet

    "In gold processing plants, it is common to start gold cyanidation in the grinding circuit by simple cyanide addition or as a result of recycling residual cyanide. In such cases, advantages such as a

    Jan 1, 2016

  • CIM
    The McClean Lake Operation COGEMA Resources Inc. JEB Mill Process Description and Commissioning

    By Art Carino

    "The McClean Lake operation is located in the Eastern Shore of the Athabasca Basin in northern Saskatchewan some 700-air kilometers north of Saskatoon. It is operated by Cogema Resources Inc., the maj

    Jan 1, 2001

  • CIM
    Developing Breakthrough Solutions to Complex Metallurgical Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne

    Jan 1, 2015

  • CIM
    Converting the Key Lake Mill Process for McArthur River Ore

    "The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri

    Jan 1, 2001

  • CIM
    Nanoparticle Flotation Collectors for Pentlandite

    By Manqiu Xu, Songtao Yang, Zongfu Dai, Robert Pelton

    "Hydrophobic polystyrene nanoparticle suspensions were evaluated as potential flotation collectors for pentlandite. Experiments involving both clean model mineral suspensions and complex ultramafic ni

    Jan 1, 2012

  • CIM
    Electrical Model of an Electrowinning Circuit Including Stray Current through Electrolyte Piping

    By S. C. Richardson

    The electrowinning (EW) circuit involves using DC current in the electro-deposition of metal ions dissolved in an electrolyte solution. This paper reviews a method to generate an electrical model of a

    Jan 1, 2019

  • CIM
    Application of the Woodgrove Staged Flotation Reactor (SFR) Technology at the New Afton Concentrator (48th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 2016)

    By K. Swedburg, M. Samuels

    "The New Afton concentrator was commissioned in June 2012, reaching the design milling rate in September 2012. By late 2013, through a campaign of optimization and de-bottlenecking, it was recognized

    Jan 1, 2016

  • CIM
    Comparision of Two Sizes of FSFs in the Glogów Copper Smelter

    By L. Garycki, P. Poks, R. Urbaniak, T. Gabka

    In 2016 at Głogów Copper Smelter KGHM Polska Miedź S.A., after shutting down the shaft furnaces new FSF was launched. Currently, it is the only smelter with two direct to blister flash smelting furnac

    Jan 1, 2019

  • CIM
    Development and Testing of a More Effective Froth Handling Pump

    By R. J. Visintainer, W. L. Whitlock

    "Difficulties with the sizing and operation of centrifugal froth pumps are common and the underlying fluid dynamics are complex. Design and selection often relies on previous experience, offering unre

    Jan 1, 2012

  • CIM
    The Development of a Small Scale Test for Rapid Characterisation of Flotation Response (JKMSI)

    "The characterisation of resources and description of variability across different ore domains is key to accurate prediction of probable metallurgical performance. Such characterisation testwork often

    Jan 1, 2013

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016