Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Retention of Small Grinding Media inside Ball Mills

    By Jocelyn Bouchard, Claude Bazin, Sami Makni, Rolando Quispe

    "Finely disseminated minerals in ores require intensive size reduction to achieve sufficient liberation for the subsequent concentration process. The use of small grinding media in conventional ball m

    Jan 1, 2015

  • CIM
    Red Lake Gold Mine Autoclave Optimization Project

    By K. K. Murray, D. G. Gelderland

    "The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani

    Jan 1, 2017

  • CIM
    Grinding Circuit Improvements at Barrick Goldstrike’s Roaster Facility

    By Jim Wickens, Andy Cole, John Pekrul

    "The roaster facility at Barrick Goldstrike Mine treats double-refractory sulfidic/carbonaceous gold ore. Prior to oxidation in the roasters, the ore is ground in two parallel dry grinding circuits ut

    Jan 1, 2003

  • CIM
    An Overview of Optimizing Strategies for Flotation Banks

    By M. Maldonado, J. A. Finch

    "A flotation bank consists of a serial arrangement of cells. How to optimally operate a bank remains a challenge. This article reviews three strategies for optimizing bank performance: air profiling,

    Jan 1, 2012

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • CIM
    Implementation of a Semi-Autogenous Grinding Circuit at the Brunswick Concentrator

    By Chris Larsen, Ian Orford, Mike Cooper

    "An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The autogenous grinding circuit replaced existing surface crushing plants, fine ore storage, rod and pri

    Jan 1, 2001

  • CIM
    A New Method for the Stabilization of Arsenic from Enargite Concentrates

    By R. Barbaroux, B. Dubreuil, D. Lemieux, K. Nasrallah, G. Garcia Curiel

    "As conventional, base or precious metal ores are being depleted worldwide, the mining industry is being faced with an increasing exploitation of arsenical sulfidic ores. Enargite is a common example.

    Jan 1, 2017

  • CIM
    Tailings Disposal Area Development at Inco Sudbury Operations

    By J. P. Van Cruyningen, M. J. Puro

    "A 2400 acre extension to the existing Tailings Area is under development at Inco's Copper Cliff Milling operations.The new area is being developed in stages as production levels dictate thus minimizi

    Jan 1, 1987

  • CIM
    Review of Noront’s Eagle’s Nest Project

    By Paul Semple

    "In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced

    Jan 1, 2013

  • CIM
    Dense Medium Separation – An Effective and Robust Pre-Concentration Technology

    By Erin Legault Seguin, Mike Rylatt, Curtis Mohns

    "With energy costs increasing and ore grades diminishing, the role of pre-concentration in hard rock mining operations has been gaining greater interest. To maximize energy conservation, the pre-conce

    Jan 1, 2016

  • CIM
    Diagnosis of the Operation of a Hydraulic Classifier for Iron Ore Concentrate

    By C. Gosselin, G. M. Payenzo, C. Bazin, M. Desnoyers, G. Chevalier

    "ArcelorMittal Mines Canada operates hydraulic classifiers to reduce the silica content of an iron oxide concentrate from 4.5% to less than 1.2% SiO2. Sampling campaigns were conducted to develop a pr

    Jan 1, 2012

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • CIM
    Improving Concentrate Grade through Smart Design and Piloting

    By T. Strong

    "Selectively recovering pentlandite from high levels of pyrrhotite presents a technical and operational challenge. The liberation characteristics and also the chemical environment is critical to perfo

    Jan 1, 2017

  • CIM
    Sélection optimale des quantités d'explosifs basée sur des contraintes de production et un résultat d'analyse de régression multiple

    By J. L. Collins

    "Une recherche debutee en 1987 tente de cerner divers éléments ayant un impact sur la productivite miniére, de facon à améliorer la planification des operations souterraines. II a été possible de recu

    Jan 1, 1990

  • CIM
    Operation and Improvements at the El Indio Roasting Facility

    By John Frostiak, Lloyd Buckingham, Kenneth G. Thomas, Luis Wilson

    "The El Indio roasting facility associated with El Indio Mine in Central Chile has operated since 1981. It is a facility developed to remove arsenic and antimony from gold bearing enargite/pyrite flot

    Jan 1, 1999

  • CIM
    Selective Extraction of Copper from Copper Concentrates Containing High-Arsenic under High Pressure Oxidative Leaching

    By Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama

    In this study, the dissolution behavior of copper and arsenic from five different copper concentrates containing 21-34.7 %wt. of Cu, 1.3-7.3 %wt. of As and 15.6-27.5 %wt. of Fe were investigated under

    Jan 1, 2019

  • CIM
    Combining Dynamic Logistics Simulation with Process Modeling to Support Capacity Expansion Studies: Experience at ArcelorMittal Mines Canada Pellet Plant

    By Jean-Pierre Côté, Alexandre Noiseux

    "Hatch and ArcelorMittal Mines Canada have combined their expertise to develop a dynamic model of the latter’s Iron Ore Pellet Plant in Quebec, Canada. This model was used to predict the benefits of d

    Jan 1, 2010

  • CIM
    An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan

    By J. Yue

    "Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of

    Jan 1, 2017

  • CIM
    Use of gravity drainage and quasi-homogeneous dykes for containment of oil sand tailings (df9a2317-173a-4976-8412-bf4feb957a4f)

    By L. Nichols, H. Keele, K. Czajewski

    "The oil sands industry in northern Alberta disposes of the by-products of bitumen extraction into tailings ponds. The mix of tailings sand and mature fines, with gypsum added as a flocculent, constit

    Jan 1, 2008

  • CIM
    The Need to Innovate: Celebrate the Past....Look to the Future

    By Dominic Fragomeni

    "The mineral processing industry has had a long history of innovation that is recognized but not often celebrated. These include significant advances in mineral measurement, testing, comminution, min

    Jan 1, 2017