Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    Recommended Practices for Application, Installation and Calibration of a Weightometer

    By D. G. MacBeth

    Most belt scales on the market are factory calibrated to minimum accuracy figures of 0.1% - 0.2% at several load points. However, if the same belt scale is not properly installed and maintained on the

    Jan 1, 1975

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)

    By C. S. Maggs, L. Shwydiuk, H. W. Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    Jan 1, 2003

  • CIM
    Rehabilitation of Tailings Areas of Uranium Mines

    By A. J. Vivyurka

    "This is a talk about the experiences that Rio Algom Mines Ltd. has had in the Elliot Lake uranium area trying to make the tailings more compatible with the surrounding environment. To get a better id

    Jan 1, 1975

  • CIM
    Chapter 13. Miscellaneous Royalty Provisions

    By Karl J. C. Harries

    13.1. RIGHT TO RECEIVE ROYALTY CONTRACTUAL ONLY1

    Jan 1, 2003

  • CIM
    Enhanced Oxygen Transfer in Gold Cyanidation

    By Ralph Harris, Xia Qi, Frank Komsic

    "Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r

    Jan 1, 1996

  • CIM
    The Hematite on Black Island, Lake Winnipeg, Manitoba

    By G. M. Brownell

    A DEPOSIT of hematite occurs on Black island, lake Winnipeg, at a point known locally as Red Rock, on the south shore of the island directly across from Clements point. The mail boat from the Canadian

    Jan 1, 1945

  • CIM
    Barrick Gold Corporation - Est Malartic

    By Pierre Pelletier, Christian Pichetie, Dany Pelletier

    "IntroductionDuring 1994, Barrick Gold Corporation, or American Barrick at that period, acquired Lac Minerals Ltd. properties. One of them was the Bousquet Complex. The Bousquet Complex is divided int

    Jan 1, 2000

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Stereolithography—a rapid prototyping technique for orebody modelling and mine design

    By A. Akerman, C. P. O’Connor, N. Vayenas

    "Stereolithography is a well-known rapid prototyping technique in the manufacturing sector. Essentially, it is a three-dimensional printing process that produces plastic prototype parts from standard

    Jan 1, 2006

  • CIM
    Integrating Geometallurgical Parameters into Mining Grade Control at Operating Mines

    By William Shaw

    Conditional simulation is now an accepted tool for managing ore block design at a number of operating mines. It provides a way to consider the quality of data, local continuity and economic risk in de

    Oct 1, 2009

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Canadian Energy Sources

    "THE CONCEPT of energy as a commodity, while not entirely new, is not as widespread as the importance of the idea to this modern world would lead one to expect. The growth in the supply and use of ene

    Jan 1, 1953

  • CIM
    Developing Maintenance Plans Designed to Reduce Efficiency Losses in Fired Equipment

    By Jason J. Ballentine

    This case study presents the results of a maintenance review of a soot blower system at a coal fired power generation station. The power generation station was following a ?repair when it breaks? main

    May 1, 2007

  • CIM
    Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant

    By Jason J. Ballentine

    This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia

    May 1, 2007

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • CIM
    Strength of coal from the Star-Key Mine near Edmonton, Alberta

    By M. L. Jeremic

    Altered and unaltered coal from the Star-Key Mine near Edmonton, Alberta has been tested under compression and under tension. The test results showed that altered coal samples have an appreciably low

    Jan 1, 1979

  • CIM
    The geology of the McClean uranium deposits, northern Saskatchewan (4088e011-b748-401d-9c54-9c5a39eadea2)

    By N. Saracoglu, J. P. Golightly, R. H. Wallis, J. J. Brummer

    "The McClean uranium deposits are located 11 km west northwest of the Rabbit Lake Mine. Their average grade is 1.8 % U3O8 , and they contain 6. 350 tonnes of uranium oxide in seven pods of variable gr

    Jan 1, 1986

  • CIM
    The Separation of Chalcopyrite and Pentlandit from Inco's Sudbury Area Ores Pilot Plant Testwork

    By G. E. Agar, W. B. Kipkie, R. A. Tenbergen

    "This paper describes the successful pilot plant testing of a flowsheet, developed at INCO Ltd.'s J.Roy Gordon Research Laboratory (JRGRL), for improved separation of the constituent minerals in a bul

    Jan 1, 1984