Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sheerness — A new coal mine for AlbertaBy Keith Haddock
"The Sheerness Mine, a new surface coal mine located near Hanna, Alberta, went into full production in mid-1995. The mine, which is operated by Luscar’s subsidiary Forestburg Collieries (1984) Ltd., h
Jan 1, 1997
-
Some Major Structures of the Canadian ShieldBy J. Tuzo Wilson
Abstract A division of part of the Canadian Shield into provinces believed to represent former mountain belts is attempted, special emphasis- being laid upon radioactive age determinations, the rel
Jan 1, 1949
-
Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold RecoveryBy Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante
Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c
Jan 1, 2005
-
Energy Conservation in Mining & Milling OperationsBy T. B. Armstrong
"The developing world energy crisis and spiraling fuel costs have created a new public awareness and general acceptance of the need for energy conservation.Plants will have different objectives for an
Jan 1, 1978
-
The Red Dog VIP mill optimization project. Part B: An integrated approach to modelling and design of the flotation plantBy B. K. Gorain, A. W. Stradling
"The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h
Jan 1, 2003
-
Assessment of the Effectiveness of Mining Vehicle Seats for Multi-Axis Vibration EnvironmentsBy Richard C. Banting
Excessive vibration is known to have an adverse affect on soft body tissue and operators of heavy mining equipment can be exposed to vibration that exceeds levels recommended in international guidelin
Oct 1, 2010
-
The Role of Applied Biotechnology in Decommissioning Mining OperationsBy Margarete Kalin
"Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma
Jan 1, 1998
-
Flowsheet Design Using Flotation Rate, Selectivity and RTD DataBy Manqiu Xu, Peter Wells, Gord Bacon
"A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th
Jan 1, 2005
-
Cut off Grade Optimizer Integrating Contaminant ConstraintsBy Sebastián H. Troncoso
Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block
Oct 1, 2009
-
Paste Backfill Strength Behaviour Using Different Binding Agents and Binder CombinationsBy Philip A. Dirige
This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength
May 1, 2006
-
High Pressure Direct Injection of Natural Gas in a Diesel Engine for High Performance/Low EmissionsBy K. Bruce Hodgins
The North American mining industry faces challenging emissions regulations in coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, industry
May 1, 2002
-
Novel Dewatering Aids for Mineral Concentrates and CoalBy M. Kerr, Petra Lampinen, Jinming Zhang, Petra Brodin, C. Hull, Nils-Johan Bolin, R. Asmatulu
"According to Darcy’s equation, the rate of dewatering varies as inverse square of the surface area of the particles to be dewatered and is proportional to the pressure drop across a filter cake. Thus
Jan 1, 2005
-
Stochastic Simulation of Open Pit Pushbacks with a Production SimulatorMaterial scheduling, sequencing planning and execution are the core tactical mine plan for achieving production targets that maximize the objective function of any mine production entity. This objecti
May 1, 2004
-
Owl Creek Processing SummaryBy O. Matwijenko
"1. IntroductionThe Falconbridge Owl Creek open pit gold mine is located 17 km northeast of Timmins and 2.5 km west of the Kidd Creek metallurgical site. Diamond drilling first commenced in 1964 with
Jan 1, 1988
-
Algorithm to Help Additional Drilling LocationBy Vanessa C. Koppe
During ore body modeling normally additional samples are required to improve resources evaluation and mining planning. At this stage one rises the question about where additional samples should be loc
Oct 1, 2009
-
Evaluation of spontaneous fire risk potential of underground coal mine panelsBy T. R. Roy
"This paper presents an objective model for the estimation of fire risk potential of an underground coal mine panel by the bord-and-pillar method of mining where extraction is carried out by depillari
Jan 1, 2003
-
Numerical Modeling Simulations of Spray-On Liners Support Potential in Highly Stressed and Rockburst Prone Rock ConditionsBy A. P. E. Dirige
Extensive field study has been performed to assess the capabilities of thin sprayon liners (TSLs) and conventional spray-on support systems for preventing rock and support material damage that often r
May 1, 2009
-
Geology of the Cargill Township Residual Carbonatite-associated Phosphate Deposit, Kapuskasing, OntarioBy Reno Pressacco
Abstract- Agrium Inc. is a world leader in the production, distribution, and marketing of agricultural products and services in both North America and Argentina. The new phosphate mine and mill comple
Jan 1, 2001
-
Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada (7fbdd5b5-ed88-46a3-b280-65b8ab04c5b6)By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer
"Abstract — The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed an
Jan 1, 2012
-
Molybdenum Extraction from Uranium Rich Strip SolutionBy Charles "Chick" Rodgers
"The Key Lake uranium mine is the largest single uranium producer in the world. It is owned 2/3 by Cameco Corporation and 1/3 by Uranerz Exploration and Mining. Cameco is the operator. Current product
Jan 1, 1996