Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    Classification at the Sullivan Concentrator

    By G. J. Knighton

    Introduction The Sullivan concentrator treats the complex lead-zinc-iron ore from the Sullivan mine of the Consolidated Mining and Smelting Company of Canada, Limited, to make a lead and a zinc con

    Jan 1, 1947

  • CIM
    Mine-Mill Waste Water Treatment at Brunswick Mining

    By D. M. Fraser

    "Brunswick Mining and Smelting Corporation Limited operates two mines; one open pit (No. 6) and one underground (No. 12), approximately 20 miles south-west of Bathurst, New Brunswick. Both are massive

    Jan 1, 1980

  • CIM
    Observations on the Impact of Furnace Dimensions and Power Density on Taphole Integrity

    By R. J. Hundermark, K. van der Merwe, L. R. Nelson

    Taphole integrity is critical to all furnaces, but it is especially important in high intensity electric furnaces processing matte and metal of high superheat. Key furnace dimensions are the electrod

    Jan 1, 2015

  • CIM
    Ironworking in Upper Canada: Charles Hayes and the Marmora Works

    By Rita Michael

    "The Marmara Ironworks was not the earliest ironworks in Ontario, but it was distinguished from other early works in a number of ways. It was established on an ambitious scale as a self-sufficient and

    Jan 1, 1999

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Managing maintenance in the 21stcentury

    By K. Musgrave

    "The ISO 9000 Quality Management System Standards have become internationally accepted as the way to manage quality assurance. The author has developed a Maintenance Management System Standard using I

    Jan 1, 1997

  • CIM
    Flotation of carbon values from blast furnace flue dust using statistical design

    By P. K. Naik, B. Das

    Flotation studies were carried out to recover carbon values from blast furnace flue dust containing ~30.34% carbon, 4.6% volatile matter (VM), and 65.03% ash. The variables chosen for the experiments

    Jan 1, 2005

  • CIM
    Genesis of Canadian Massive Sulphides Reconsidered by Comparison to Cyprus Deposits

    By R W. Hutchinson

    Cupreous pyrite deposits in Cyprus have many geologic similarities to Canadian massive sulphide copper-zinc ores as well as certain significant differences. A comparison of the Cyprus and Canadian dep

    Jan 1, 1965

  • CIM
    High Precision Shovel GPS

    By Lynn M. Gould

    Syncrude Canada operates the largest oil sands crude oil production facility in the world and produces over 13 percent of Canada?s total oil requirements. To do this, Syncrude mines the oil sand in op

    May 1, 2002

  • CIM
    Gravity Recoverable Gold and the Mineral Liberation Analyser

    By Philip J. Guerney, S. O’ Leary, André R. Laplante

    "Concentration of dense mineral phases (s.g. greater than 7) for characterisation of individual particles and mineral grains by electron microscopy is a well established technique for the detection an

    Jan 1, 2003

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    Achieving Stakeholder Support for New Gold Mining Developments that Contain Sulfide Minerals

    By T. D. Chatwin

    While new jobs and taxes are major incentives for support of mining, stakeholders must also be assured that current jobs, resources and environment will be protected. Mining companies can help achieve

    Jan 1, 2011

  • CIM
    Self-Cleaning Fluidized Bed Slurry Heat Exchangers: Processing of Laterite Ore Slurries for the Extraction of Nickel and Cobalt in High-pressure-Acid-Leach (HPAL) Plants

    By D. G. Klaren, E. F. de Boer

    Self-cleaning fluidized bed heat exchangers have demonstrated unparalleled performance internationally for the implementation of indirect heat transfer in severely fouling fluid environments. The inge

    Jan 1, 2004

  • CIM
    Vector Neutral Truck: A 10% Improvement to the Haulage Cycle

    By Michael Stuart Parsons

    The haulage cycle is the sequence which a haulage vehicle must first arrive at the loading area, then turn around and reverse into position. Once it is loaded, the vehicle leaves and travels to the un

    May 1, 2003

  • CIM
    MAC and the AFN: Taking Up the Corporate Challenge

    Taking Up the AFN Corporate Challenge ?? About MAC ?? ?Towards Sustainable Mining? ??Mining and Aboriginal Peoples Framework ?? AFN-MAC Relationship ?? A New MAC Northern Initiative ??Social and

    May 1, 2009

  • CIM
    Statistical Multi-Scale Method of Mechanics Parameter Prediction for Rock Mass

    By J. Z. Cui

    In this paper a statistical multi-scale method for the mechanics parameter prediction of the rock mass with random distribution of multi-scale cracks/joints is presented. First the micro-structure of

    May 1, 2009

  • CIM
    Design Considerations for Mine Waste Management at the Meadowbank Gold Project

    By Cameron J. Clayton

    Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec

    May 1, 2004

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991