Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Underground Geological Mapping at North Broken Hill Ltd

    A proved routine mapping practice is described involving detailed observations on grade and structure. The equipment and methods employed are giving good service under the conditions encountered. Stop

    Jan 1, 1940

  • AUSIMM
    The Development of L.D. Slag as an Aggregate for Road Construction

    By Stephenson IM

    Research to develop the use of L.D.slag as an aggregate in road construc-tion is described. The chemistry and mineralogy of L.D. slags are shown to be generally similar to S. Yorkshire arc furnace sla

    Jan 1, 1979

  • AUSIMM
    Developments in Geophysics for Prediction of Structures Influencing Production in Mines

    In both surface and underground coal mines, the detection of geological structures ahead of workings is recognised as being fundamental to the efficient operation of the mine. Mining into zones of

    Jan 1, 1988

  • AUSIMM
    Maintenance Requirements and Procedures for Underground Mobile Equipment, C.S.A. Mine, Cobar

    The maintenance system for underground mobile equipment at Cobar Mines Pty. Ltd. has been modified from that originally planned as a result of experience gained in operating the equipment.Downtime due

    Jan 1, 1969

  • AUSIMM
    Strata Control Considerations for Improved Mine Roadway and Panel Driveage Rates

    By Fabjanczyk MW, Nemcik JA, Matthews SM

    The major strata control considerations which affect the optimisation of roadway driveage in highly stressed strata is the performance of reinforcement placed and the extent of stress induced roc

    Jan 1, 1988

  • AUSIMM
    A One Step Process for Manganese Leaching-Desulfurisation of Flue Gas

    By A He, J Li, J Pan, J Clout

    The removal of sulfur from SO2 containing flue gas is improved by adsorbing SO2 into solution with manganese ions as catalyser, however, burnt lime slurry has to be added to modify solution pH and the

    Jan 1, 2004

  • AUSIMM
    Exploration Geochemistry for Gold in Deeply Weathered Terrains: Sample Preparation Techniques

    By Govett G. J S, Currie D. A, Cohen D. R

    Analysis of mechanical size fractions of soils around the Paddington deposit (W.A.) and the Charters Towers Goldfields (Queensland) shows a bimodal gold distribution, with enrichment in the coarse

    Jan 1, 1988

  • AUSIMM
    Using the Floatability Characterisation Test Rig for Industrial Flotation Plant Design

    By J-P Franzidis

    Industrial flotation plant design is a complex process involving many aspects, one of which is the use of pilot-scale plants to test industrial plant flow sheets. Once test work on a pilot-scale has b

    Jan 1, 2004

  • AUSIMM
    The Development of a Continuous Copper Drossing Process for Lead Bullion

    The first stage in the refining of lead blast furnace bullion is the removal of copper and this is normally done as a batch process in open kettles,A number of attempts have been made in the past to e

    Jan 1, 1963

  • AUSIMM
    Company Growth û Its Implications for Personnel Management and the Community

    By Jury C. G

    A decade of expansion and high production targets have led to changes in the number and structure of the Mount Isa Mines Limited work- force. Falls in labour turnover and absenteeism are correlated

    Jan 1, 1974

  • AUSIMM
    Resistance to the Introduction and Testing of New Technology in Mineral Procesing

    We live in a world in crisis. One where the tides of change run ever faster. Where the only thing we can be sure of is change itself. The challenge we face, therefore, is not how to resist the force

    Jan 1, 1993

  • AUSIMM
    Pilot Plant Heavy Medium Investigation for Mount Isa Lead/Zinc Ores

    By Di Pasquale S, Osler GD

    Mount Isa Mines Limited recently commiss ioned an 800 tph Heavy Medium Preconcentration Plant for lead/zinc/silver ores. The decision to build this plant was made in late 1979 based largely on inve

    Jan 1, 1978

  • AUSIMM
    Integral Pressure Strip/Electrowin Circuit for Gold Recovery from Activated Carbon

    By Macaulay J

    The recovery of gold from cyanide liquors is frequently effected by using activated carbon. Process economics however require non destructive methods of gold extraction from the carbon so that it may

    Jan 1, 1984

  • AUSIMM
    Lessons from Manufacturing-Integrating Mining and Milling for a Complex Orebody

    By Tucker G, Clark A, Young M. F, Johnston M

    Mount Isa Mines has made a huge commitment to process control in milling. Yet in lead zinc we still failed to achieve a steady operation. Comparisons with manufacturing plants showed the key differe

    Jan 1, 1998

  • AUSIMM
    Modern Management Systems for Higher Margins (287342e3-9503-42c0-a395-e57d01f1d6c3)

    Maximising margins in highly competitive international markets demands superior productivity. A key to superior productivity is using a process approach to enable rapid, ongoing improvement of produ

    Jan 1, 1998

  • AUSIMM
    Prediction of Rock Fragmentation Using a Gamma-based Blast Fragmentation Distribution Model

    By H Mansouri, M A. Ebrahimi Farsangi, F Faramarzi

    A blast fragmentation model is developed based on the gamma function to describe the run-of-mine fragmentation distribution. The model presented is aimed to benefit from simplicity in application and

    Aug 24, 2015

  • AUSIMM
    GPSS Computer Simulation of Equipment Requirements for the Iron Duke Mine

    By Sturgul J. R

    The South Middleback Ranges (SMR) operation involves the develop- ment of iron ore resources at the Iron Duke mine in the South Middle- back Ranges to replace the Iron Baron mine whose reserves are ne

    Jan 1, 1989

  • AUSIMM
    A Review of the Newcastle Coalfield Subsidence Prediction Curve

    Subsidence data resulting from longwall mining in the northern part of the Newcastle Coalfield of New South Wales has been reviewed. Themain factors influencing subsidence variability in this area (ap

    Jan 1, 1998

  • AUSIMM
    Remote Sensing: A Cost Effective tool for Environmental Management and Monitoring

    By Cottrell EC

    Remote sensing has been used for many years but until recently its application has been limited by the resolution of the data available. High resolution airborne multi-spectral scanner data (MSS)

    Jan 1, 1987

  • AUSIMM
    Factors Influencing the Choice of Cooling and Refrigeration Systems for Mines

    By R W. Wilson, A R. Branch

    For hot mines, the use of mechanical refrigeration machines has become an essential feature of ventilation and cooling systems. Over the last 30 years, considerable effort has been made in developing

    Jan 1, 2005