Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The results of supplementary sampling to evaluate suitability of the instrumentation for monitoring of DPM concentrationBy S Sabanov
Supplementary sampling of particulate mass concentration, the number concentration and the average particle diameter of nanoparticles using a TSI Dust-Trak DRX Aerosol Monitor, Naneos Partector 2 has
Oct 12, 2022
-
The Geology and the Highly Selective Open Cut Mining Method of the Small, Irregular, Narrow and Low Grade St. George Orebodies at Mount MagnetThe St George orebodies are situated within the tectonically disrupted eastern limb of the Boogardie Syncline.Highly disturbed rafts of banded chert formations occur within a sequence of felsic volcan
Jan 1, 1984
-
Blasting of High Density OresBy Grieve BL
For a blast to be successful both heave and fragmentation must be satisfactory. Amongst the major factors influencing blasting are rock properties. This paper considers the effect of rock density
Jan 1, 1978
-
A Review of European Acid Rock Drainage InitiativesBy B Dold
Western Europe is a dynamic region, with an emerging co-operation between the individual nations both politically, economically, technically and scientifically. The European Union, today with 15 membe
Jan 1, 2003
-
Reverse Flotation of Coarse Marcasite and Pyrite From Rutile Concentrate by the Fastflot ProcessBy S H. Marshall, H Hutcheson
Conventional batch cell and FASTFLOT pilot plant studies of reverse flotation of coarse marcasite and pyrite (100 - 400 μm) to reduce the sulphidic sulphur content of a rutile concentrate, were und
Jan 1, 1998
-
Developments in Explosive SupplierûCustomer RelationshipsThe original and most basic relationship between mining company and explosive supplier was a simple one of consumer and product supplier. The divide between the two was quite clear-cut with neither ta
Jan 1, 2004
-
The 250 million ton per annum spatial digital twinBy M Pomery
BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and
Sep 18, 2023
-
Some Aspects of Interaction Between the Coal Industry and the CommunityThe history of black coal as a fuel dates back in Europe more than 2,300 years, and possibly longer in China. Originally the mining of coal was done by underprivileged people, but with the industrial
Jan 1, 1975
-
Implementation of a High Energy Dissipation Ground Support SchemeBy E Villaescusa, A Kusui, R Talebi, R Hassell, C Arcaro
Northern Star Resources (NSR) operates several seismically active mines as part of its Kalgoorlie Operations. In order to successfully continue mining at depth in increasing stress conditions, strateg
Mar 15, 2021
-
Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter RiverBy D Stacey, J Matthews
Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The
Jan 1, 2001
-
The Risks of Excess Water on Tailings Facilities and Its Application to Dam-break StudiesBy D Luppnow, H Rourke
Recent disasters such as the failure of the Mount Polley tailings embankment remind us of the risks that tailings facilities pose. It is widely recognised that dam-break assessments are a vital tool i
Jul 27, 2015
-
Panel Caving Scheduling Under Precedence Constraints Considering Mining SystemBy E Rubio, N Morales
Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with
Sep 26, 2011
-
Interacting with the Daily Operations and the Need to Plan for Future RehabilitationMine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro
Jan 1, 2007
-
Deriving maximum value from mineral waste streamsBy D Osborne
Current mineral extraction and valorisation activities still have a strong focus on the ‘delivered product(s)’ which might be a bulk commodity such as metallurgical coal, hematite, bauxite, etc., and
Sep 1, 2024
-
Quantification of Drill Hole Deviation – Century Mine Case StudyBy C D. Pocock
Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to
Nov 8, 2011
-
Developments in the measurement of stress in rockBy I Gray
Other than being reasonably certain of the average vertical stress being lithostatic, there can be little certainty about stress in the ground. The stresses and strains in rock are a function of gravi
Nov 29, 2022
-
Putting Geology and Engineering Back into Resource/Reserve DeterminationBy M Darvall And R Fare, D Dormer
The Argo Archaean lode gold deposit is hosted within a structurally complex shear zone system, 70 km south of Kalgoorlie, and 3 km west of the crustal-scale Boulder û Lefroy Fault. Argo is an active u
Jan 1, 2006
-
Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiativesBy S J. Loach
F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade
Sep 18, 2023
-
Keeping Projects on the RailsBy J Canterford
Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be
Aug 8, 2011
-
Panel Caving Experiences and Macrotrench (Macrozanja) - An Alternative Exploitation Method at the El Teniente Mine, Codelco, ChileBy P Tobar
The development plan (long-term plan) of El Teniente Mine, Codelco-Chile, includes 100 per cent primary ore, located at increasing depths, which may involve several difficulties related to the applica
Jan 1, 2000