Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Research and Process Development at Port Pirie

    The following is an outline of the main metallurgical process developments which have occurred at Port Pirie during more than 100 years of smelting. Emphasis is placed on those process developments wh

    Jan 1, 2000

  • AUSIMM
    Geotechnical assessment for the waste rock backfilling of the decommissioned Rum Jungle Open Cut Pit

    By J Hartnett, B Tarrant, A Rayner, D O’Toole, P Davies

    Since 2009, the Northern Territory and Australian governments have been working under a national partnership arrangement to inform a rehabilitation plan for the former Rum Jungle uranium mine. Part of

    Jul 1, 2021

  • AUSIMM
    Implementing condition-based wear surface management

    By P Velletri, N Gaylard

    The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi

    Nov 8, 2021

  • AUSIMM
    Resue Mining with eDev™ Electronic Detonators at Stawell Gold Mines

    By C Hamilton

    Stawell Gold Mines (SGM) is an underground mining operation located in Victoria, Australia. The mining method employed is long hole retreat stoping, utilising up and downholes and artificial concrete

    Mar 21, 2011

  • AUSIMM
    Replacement of Pulverised Coal Injection (PCI) with hydrogen and its impact on blast furnace internal conditions

    By S Mitra, D O’Dea, N Barrett, T Honeyands, P Zulli

    The steel industry continues to explore and demonstrate technologies that decrease its greenhouse gas emissions, especially in blast furnace ironmaking where alternate operating conditions will be req

    Nov 8, 2021

  • AUSIMM
    An investigative study on the interfacial behaviour of waste graphite resource with liquid iron

    By S Udayakumar, S Biswal, N Sarmadi, V Sahajwalla, F Pahlevani

    Recent times have witnessed a notable momentum in the interest surrounding technology dedicated to harnessing waste as valuable resources, prompted by the mounting challenges posed by waste accumulati

    Jun 19, 2024

  • AUSIMM
    Schrödinger’s kittens – lifting the lid on resource drill hole data after mining

    By D Corley, J Moore, M Grant, A, W R

    Resource estimates are the corner stone of technical and investment decision-making. Prior to mining, resource estimation uncertainty has the greatest potential to lead to poor investment decisions, d

    May 24, 2023

  • AUSIMM
    Reduction in Diesel Particulate Matter at Oaky North

    By A Melloy, D Holt, M Jurak

    Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising

    Jul 1, 2013

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)

    By M P. Murphy, C M. D Barton

    When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t

    May 24, 2023

  • AUSIMM
    The SNIM Guelb II Project in Mauritania – Process Design Challenges

    By G Cooper

    The Société Nationale Industriel et Minière (SNIM) is expanding its ore and concentrate production capacity in Mauritania, West Africa. This government-controlled mining company has bee

    Jul 11, 2011

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • AUSIMM
    A Review of the Structure and Stratigraphy of the Central Pine Creek Geosyncline

    By Ormsby W. R, Farrar L

    The stratigraphy of the central Pine Creek Geosyncline has been simplified into a three-fold subdivision comprising the Batchelor, Frances Creek and Finniss River Groups. The Batchelor Group consist

    Jan 1, 1994

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Three-Dimensional Geometallurgical Data Integration for Predicting Concentrate Quality and Tailings Composition in a Massive Sulfide Deposit

    By R Knight

    The spatial variability of geometallurgical characteristics in a mineral deposit can have significant impact on financial and mine planning, mineral processing, concentrate quality and tailings compos

    Sep 5, 2011

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Overcoming implicit modelling software limitations using Python scripting – an innovative geological modelling workflow for George Fisher Mine, Queensland, Australia

    By L Bertoss, D Carvalho

    In the last decade, the use of advanced implicit modelling software/algorithms in mineral resource workflows has become a best practice in the mining industry. In most cases, these workflows can easil

    May 24, 2023

  • AUSIMM
    Seam Gases in Major Australian Coalfields

    The major coalfields of Australia are almost unique in the occurrence in some areas of CO partly or almost completely replacing CH4,t1e normal seam gas from metamorphism of coal due to time and de

    Jan 1, 1986