Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
MinerÆs Rights: Legal and Illegal Mining by Automatic Citizens under the present Mining ActEvery automatic citizen is an automatic recipient of a miner's right under the present Mining Act (Chapter 195), but this alone does not entitle any automatic citizen to mine for minerals on
Jan 1, 1991
-
The Geology of the Golden Cross Mine, Waihi, New ZealandBy P C. Couper, P C. Keall, S J. Mathews, A Francis
An epithermal gold-silver deposit is presently being developed at the Golden Cross Mine in the Waitekauri Valley, 8 km northwest of Waihi, New Zealand. Highest grade mineralisation underground is main
Jan 1, 1991
-
Review of Ground Support Practice in Australian Underground Metalliferous MinesThe range of environments which control the level of ground support required vary greatly in terms of rock type, rock structure and the mining method used. At the operating mines visited during th
Jan 1, 1982
-
Development of Underground Gold Processing PlantsDevelopment of Underground Gold Processing Plants Underground gold processing plants have potential advantages over traditional surface installations related to a smaller environmental footprint, red
Sep 13, 2010
-
Paper No. 127. Presidential Address.Taking the Presidential chair of the Australasian Institute of Mining Engineers, my first duty is to thank you for the high honour and position you have conferred on me. A position entailing the highe
Jan 1, 1903
-
What Can Go Wrong in Comminution Circuit Design?By P Staples, G Lane, S Morrell
The design of semi-autogenous grinding (SAG) mill based comminution circuits for the treatment of competent ores, similar to those at Geita and Boddington, involves the same process of sample selectio
Jan 1, 2009
-
Development of a Theoretical Approach to The Heap Leaching of Copper Sulphide OresHeap leaching of copper sulphide and oxide ores' has been conducted at Rum Jungle since the end of 1965.A review of operations was made and this led to an examination of some theoretical aspects
Jan 1, 1969
-
Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric FieldPipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field
Sep 13, 2010
-
Development Aspects of the Golden Cross ProjectPermitting, engineering and evaluation, detailed design and construction aspects of the Golden Cross goldmining project in New Zealand are briefly reviewed. The extremely lengthy and complicated gover
Jan 1, 1990
-
Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implications (495c9435-8309-4f05-8133-4703aafde3c7)Close spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was
Jan 1, 1981
-
Salvage and Direct Transfer for Accelerating Restoration of Native Ecosystems on Mine Sites in New ZealandBy P Williams, S Flynn, R Birchfield, R Simcock, R Toft, P Comeskey
Direct transfer, or community translocation, comprises salvage and replacement of intact æsodsÆ of vegetation together with underlying soil. It has been applied to New Zealand mine sites restoration o
Jan 1, 2000
-
Sulphide Oxidizing Bacteria of Copper Porphyry OreBy Ralph B. J, Sadler W. R
Thiobacillus ferrooxidans was shown to catalyse biodegradation of chalcopyrite concentrates. The process was growth associated at normal temperatures (30°C) in dilute acid solution (pH2, H2SO4) i
Jan 1, 1981
-
Concentration Practice in the Australian Beach Sand IndustryBeaches contain the residue of eroded rocks which have resisted weathering, and it is common to find in all beaches some of the harder, heavy minerals. The natural sorting action of waves and winds te
Jan 1, 1950
-
Submarine Hydrothermal Venting and Mineralisation Associated with Kermadec ArcThe ~2500 km long Kermadec-Tonga arc northeast ofNew Zealand is the longest continuous intraoceanic arc in the world. At least 94 volcanic centres along the arc are submarine, most (87 per cent) withi
Jan 1, 2005
-
Environmental Management Systems for Mining CompaniesThe increased focus on best practice environmental management has led to mining and mineral processing companies developing a variety of procedures to ensure that the environmental impacts of their op
Jan 1, 1995
-
Tungsten-Carbide Drilling Investigations at Morning Star (G.M.A.) Mines N.L.By Clarke P. E
At the end of the recent war, reports became available from Europe of the use of tungsten-carbide inserts in percussion rockdrill bits. These bits were used with small size rockdrills, so that the onl
Jan 1, 1950
-
Underground Sampling. Methods at the Great Cobar Mines, Cobar, N.S.W.THE Great Cobar Company Limited owns 1100 acres of freehold, which include the Great Cobar Oopper Mine and smelters, the Cobar Gold Mine, the Cobar-Ohesney Copper Mine, and the Great Peak Gold Mines.O
Jan 1, 1919
-
The Technored Process - Redefining the Steel BusinessThe rush for alternate iron-units in the last few years spurred a true outbreak of new alternate iron units projects many of them incorporating new process in what can be classified as the.most fru
Jan 1, 1999
-
The Proterozoic Geology of the North-West Division of Western Australia (8babcfee-6d4d-45b1-afdc-dcfbf3543d75)Three main divisions of the Proterozoic are recognized in the North-West Division of Western Australia. These are referred to, in order of decreasing age, as the Mt. Bruce Supergroup, the Bresnahan Gr
Jan 1, 1966
-
Preparation of Low Ash Coal for Carbonization and Conversion ProcessesProperties of coal which are significant in relation to preparation for carbonization and conversion are reviewed, and existing coal preparation technology which has been used for production of cleane
Jan 1, 1980