Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development Strategy of the Trident Underground Gold MineAvoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas
Jan 1, 2008
-
Calibration of post blast gas simulation using mine site readingsBy F C. D Michelin
Blast fumes are a significant health risk to underground workers, containing several dangerous gases such as carbon monoxide (CO), nitrogen oxides (NOx) and ammonia. To ensure safe working conditions,
Oct 12, 2022
-
Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the CongoBy M G. Millad, M Zammit
The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa
Aug 18, 2014
-
Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automationBy A Mooney, J Marsden, H Grosser, G Dunstan
Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho
Mar 15, 2021
-
Optimising flotation plant operation by using a digital twin in the control roomBy R Tooher, S J. Oliver
The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p
Aug 29, 2018
-
Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal ReefsBy J J. Laas, A J. S Spearing
Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal
Jan 1, 1998
-
Modelling Mine Sustainability - Indicators Based on a Comprehensible FrameworkBy A Lyon
The minerals industry, as many other industries, has a wealth of indicators and a thriving æindustryÆ in their development, measurement and reporting. It is natural for this to occur for a new endeavo
Jan 1, 2009
-
Bulk Low-Grade Mining at Mount Charlotte MineBy M F. Lee
Although the Mt Charlotte gold resource was discovered in 1893, it was only in 1954 that geologists correctly interpreted drill data and defined a large low-grade orebody. The mine has been a large, l
Jan 1, 2000
-
Bucket Wheel Excavator Mining System Experience at NZ Steel Mining Ltd's Ironsand OperationAt the Waikato North Head Ironsand operation, NZ Steel Mining Ltd is using a Bucket Wheel Excavator û shiftable conveyor mining system to excavate Titanomagnetite bearing sand and clay. The syst
Jan 1, 1986
-
High Quality Performance of Segmental Lined TunnelsTunnels are being built around the world using TBMs and prefabricated segments or in situ concrete as linings. Clients demand high quality of these linings to guarantee a long-term stability and densi
Jan 1, 1999
-
How economics drive the application of ore sortingBy W Kendall
Ore sorting has the potential to reduce the feed to wet plants and in the case of complex orebodies that can significantly reduce the water, energy and reagent consumptions and resulting operating cos
Nov 21, 2018
-
Improved sustainability through WHIMS Plant addition at Roy HillBy C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann
The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i
Nov 8, 2021
-
Brave New Mine – Examining the Human Factors Implications of Automation and Remote Operation in MiningBy T Horberry
This paper describes work conducted as part of an overall research project that aims to identify current and emerging trends in the development of automation and remote mining technologies, and to pro
Nov 22, 2011
-
Benefits Related to Applications of a Mass Blast in Open Cut MiningBy C Muñoz, N Ortega, J Vergara, D Avilés
Mass blasts have been the subject of extensive studies because of their potential benefits in mining operations. However, it has not been possible to advance due to the paradigm that states that the b
Aug 24, 2015
-
Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD ModellingBy A Manzoori, M T. Shadloo
This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part
Jan 1, 2006
-
The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western AustraliaBy J Lea, D C. Kettlewell
The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst
Jan 1, 2009
-
Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo SimulationBy D Wyborn, P A. Dowd
The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r
Sep 26, 2011
-
Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat BasinsBy R Strand, L Reading, G Keir
A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart
Nov 26, 2013
-
Quantifying Geotechnical Risk in the Mine Planning ProcessBy T P. Medhurst
In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi
Jan 1, 2000
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012