Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Flotation of Alluvial GoldBy S G. Keyte
Gravity methods of recovering alluvial gold are not very efficient at particle sizes below about 0.l mm. Whereas such gold may not have been economic to recover in the past, the same may not be true t
Jan 1, 1990
-
Excavation of the Lift 2 Crusher Hydroset Chamber and Orepass in Seismically Active Conditions at Northparkes MinesBy A Weston
Northparkes Mines is a joint venture between Rio Tinto and the Sumitomo group and is operated by Rio Tinto to produce copper concentrate from ore sourced from open cut and underground. Underground or
Jan 1, 2005
-
Grinding and Beneficiation Characteristics of a Low-Grade Haematite OreGrinding and Beneficiation Characteristics of a Low-Grade Haematite Ore
Sep 13, 2010
-
The development and future of BHP Billiton’s Western Australian iron ore geological reconciliation systemBy S J. Loach
Geological reconciliation is an indispensable part of BHP Billiton’s Western Australian Iron Ore (WAIO) operations. Since 2009 our reconciliations have been calculated in a single, centralised sequel-
Jul 24, 2017
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessmentBy A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017
-
Wet High Intensity Magnetic Separators Circuit ModellingBy J D. Grobler
In the heavy minerals industry wet high intensity magnetic separators (WHIMS) are widely applied for primary magnetic separation of magnetic minerals and non-magnetic minerals. This piece of equipment
Oct 5, 2011
-
Determining ventilation system model inputs from field test work in the oil shale mineBy S Sabanov
Determining ventilation system model inputs from the field test work has been produced in the working oil shale mine which has been in production since the early 1970s. At this mine room-and-pillar wi
Aug 28, 2017
-
Mining Scenario Analysis and Mine Variable ValueBy B E. Hall, J Poniewierski, A J. Hills
Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea
Mar 24, 2014
-
Geological Mapping, GIS, and Mineral Exploration into the 21st Century û The QMAP Programme and Allied DatabasesGeological information is essential for a diversity of public and other purposes, including land use planning, hazard mitigation, and the exploration and sustainable use of natural resources. This is
Jan 1, 1994
-
Evaluation of the Iron Blast Furnace Process using Heat and Material Balances of the Flame-ZoneEvaluation of the Iron Blast Furnace Process using Heat and Material Balances of the Flame-Zone
Sep 13, 2010
-
Two Transit Levels in One Tunnel Tube – An Innovation in Barcelona Metro Line 9By R Justa Cámara, L M. Pinillos Lorenzana
Barcelona Metro Line 9 (Line 9) is an essential infrastructure, improving the transversal transport in Barcelona by connecting the greater part of the currently existing radial lines. The purpose of L
Sep 17, 2014
-
Listing on Australian Stock ExchangeListing on Australian Stock Exchange Limited ('ASX') is a means by which a company can prosper and grow by gaining access to a large capital market. This currently stands at over $300 bil
Jan 1, 1996
-
Drum Scrubber Design and SelectionA model has been developed for drum scrubbing which allows selection of geometry and power input. Specific aspects considered are: Calculation of total static and operating volumes. Total residence ti
Jan 1, 2004
-
Rail Haulage TransportationOn a worldwide basis trackbound transportation is on the decline. As mining operations progress from open cast operations to underground operations, most utilise mechanised equipment. However, in Sout
Jan 1, 2005
-
Gold Ore Treatment at Macraes FlatMacraes Mining Company Limited operates a 2.1 million tonnes per annum gold processing plant at Macraes Flat, Otago. This uses a conventional CIL route to treat oxide ore, and a flotation, grind, CIL
Jan 1, 1992
-
Gold, Silver and Base Metal Deposits of the Chillagoe District, Australia: Hypothermal to Epithermal OverprintingBy J E. Nethery
At the Red Dome and Mungana deposits in north Queensland, Australia, it is proposed that mineralisation and alteration developed as a 'telescoped' overprinting continuum, ranging in style fr
Jan 1, 1995
-
An Aspect of Community Development in a City Based on Mining and Metallurgy-The Case of WollongongWollongong* is Australia's largest single centre of mining and metallurgy. Wollongong's total employment in manufacturing of basic metal products (over 26,500 in 1972/1973) was almost 50
Jan 1, 1976
-
Speciation of Arsenic in an Anaerobic Treatment System at a Pb-Zn Smelter Site, Gold Roaster Products, Cu Smelter Stack Dust and Impacted SoilMining and metallurgical processing of gold and base metal ores often results in solid wastes and effluents containing high concentrations of arsenic. In addition, arsenic can be released to the atmos
Jan 1, 2008
-
Mn-Mineralisation in Pumpellyite-Actinolite Facies Schist of the Mount Patriarch Area, High Burn Valley, Lake HaweaBy A F. Cooper
Otago Schist in the Mount Patriarch, High Burn and Cameron Creek areas of northwest Otago grades from textural grade IIA in the east to textural grade III in the west. The entire region is of the acti
Jan 1, 2003
-
Mineral Property Valuation, or "What Number Did You Have in Mind?"By G J. A Dewar
The Australian Corporations Law generally requires Independent Expert Reports to be presented in support of capital raising or in defence of mergers and takeovers. The introduction of the VALMIN Code
Jan 1, 1999