Search Documents

  • ISEE
    Air overpressure Prediction Equation for Construction Blasting

    By Calvin Konya, Anthony Konya

    State and Federal construction specifications require the Blasting Contractor to prepare a Master Blasting Plan which is reviewed by the Owner’s Representative. The Master Blasting Plan requires the

    Jan 1, 2015

  • CIM
    Geometallurgical Mapping: A New Approach That Reduces Technical Risk

    By Jean M. Richardson, Steven R. Williams

    "Geometallurgical mapping is a new team-based approach that documents variability within an orebody and quantifies the impact of geology (host rocks, alteration and structure) and mineralogy on grindi

    Jan 1, 2004

  • ISEE
    The SMX Blast Controller – A new tool to determine the geometrical parameters of a blast based on 3D imaging

    By Peter Moser, A. Gaich, E. Grasedieck Zechmann

    In The SMX Blast Controller is a novel tool for precisely controlling the geometry of a blast based on the technology of 3D imaging. It enables to derive precise information about the geometry of the

    Jan 1, 2006

  • SME
    Olympic history to be made with medals provided by Teck Resources

    Canadian mining giant Teck Resources Ltd. will be the exclusive supplier of the metals used in the production of the more than 1,000 medals to be awarded at the Vancouver 2010 Olympic and Paralympic W

    Jan 1, 2010

  • CIM
    Water Management and Effluent Treatment Practice

    By C. Larsen, E. Goodwin, E. Konigsmann

    "This paper describes the development of an innovative effluent treatment process for cyanide and heavy metal removal from tailings wastewaters at Hemlo Gold Mines Inc. Golden Giant operation.The impo

    Jan 1, 1989

  • SAIMM
    Project Report - Pillar Mining At No. 1 And 2 Sub-Shaft On Kloof Gold Mine

    Paper written on project work carried out in partial fulfilment of BSc Engineering (Mining) The aim of this project is to determine whether certain pillars occurring within the no. 1 shaft and no.

    Jan 1, 2005

  • CIM
    An Instrumented Laboratory Cell for Gold Cyanidation Modelling

    By M. Kane, B. Bissonnette, D. Hodouin

    "A laboratory cell has been designed for a careful investigation of gold ore cyanidation using mathematical modelling of the process kinetics. The cell is a stirred vessel with continuous monitoring a

    Jan 1, 1990

  • ISEE
    Orica Osx™ 5 Degradable Emulsion Seismic Explosives

    By Deane Tunaley, Clint Brearley, Steven Kotsonis, Richard Goodridge, Tom Smylie

    Explosives are widely used in the Oil & Gas Industry for subsurface mapping via measurement of reflected sound waves as each charge is detonated. To complete a seismic survey, several thousand explosi

    Jan 1, 2014

  • AUSIMM
    Validation of the JKMRC Rotary Breakage Tester (JKRBT) Ore Breakage Characterisation Device

    Validation of the JKMRC Rotary Breakage Tester (JKRBT) Ore Breakage Characterisation Device

    Sep 13, 2010

  • SME
    Ghana: Gold, Diamonds And More

    By K. Grubaugh

    Ghana’s physiographic and geologic features are the basis for its long mining history. The Gold Coast colony has been a significant producer of gold. The gold of the Akan forest (Ghana) was a terminus

    Jan 1, 2001

  • AUSIMM
    The Use of Novel Approaches to Separate Heavy Minerals from AlbertaÆs Oil Sands

    By J Coward, S Bulatovic

    There are currently two operators producing oil from the surface-mineable portions of AlbertaÆs oil sands (Syncrude Canada Ltd and Suncor Inc) and two other companies are proposing to enter the indust

    Jan 1, 2001

  • SME
    Impact of air velocity and support advance on shield-generated dust

    Steady increases in longwall production have required operators to apply greater quantities of ventilating air in an effort to control and dilute respirable dust. Significant increases in shearer spee

    Jan 4, 2010

  • DFI
    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • CIM
    The Justification of Process Control Systems in Mineral and Coal Processing Applications

    By R. F. Hochstein, A. J. Neale, B. C. Flintoff

    "Process control technology holds very significant potential benefits for many mineral and coal processing plants. The impact can be expected in terms of performance improvements (e.g. increased throu

    Jan 1, 1990

  • AUSIMM
    Electrochemistry Measurement, Using Chena Analyser, to Investigate Selective Separation of Pentlandite and Pyrrhotite

    Electrochemistry Measurement, Using Chena Analyser, to Investigate Selective Separation of Pentlandite and Pyrrhotite

    Sep 13, 2010

  • ISEE
    Case Study and Hands On with the New DSL2 Electronic Initiation System

    By Thierry Bernard, J. M. Laboz

    2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation and Explosives Applications

    Jan 1, 2000

  • CIM
    Engaging Local Communities and Sustainable Social Development

    By Dina M. Aloi

    In today?s evolving and globalized world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to ?engag

    May 1, 2007

  • SME
    Using Dynamic Anisotropy To Improve Resource Estimation

    By K. Zabrusky

    Estimation of high grade epithermal vein deposits can present challenges in correctly representing the continuity of grade within an undulating structure. One solution to this problem is to use dynami

    Feb 27, 2013

  • NIOSH
    Controlling respirable dust in underground coal mines in the United States

    As mining operations in the United States (US) have become more productive, controlling the dust exposure of mine workers has become more challenging. In response, US mining operations are applying ba

    Jan 1, 2008

  • AUSIMM
    Personal Liability - Chartered Practising Status and Best Practice Defences for Pacrim Practitioners

    Whether you are an employee, contractor or consultant working in the mineral industry, there are pressures to deliver the best possible performance. Technical professionals are usually driven by an in

    Jan 1, 1995