Search Documents

  • NIOSH
    OFR-33-74 Truck Fire Protection System Validation - Final Report-Executive Summary - Introduction And Summary - Introduction

    Development of automatic fire protection systems for large, mobile mine haulage equipment was initiated under Department of Interior's Bureau of Mines-FMC Corp. contract H0122053, "Improved Senso

    Jan 1, 1974

  • NIOSH
    OFR-17-87 Cost Estimation Handbook For Small Placer Mines

    By Scott A. Stebbins

    This Bureau of Mines publication presents a method for estimating capital and operating costs associated with the exploration, mining, and processing of placer deposits. To ensure representative cost

    Jan 1, 1987

  • NIOSH
    RI 7432 Rock Noise Source Location Techniques

    By Fred Leighton

    The Bureau of Mines has developed rock noise source location techniques that may be used to obtain precise and practical source locations from micro-seismic field data. These techniques enable one to

    Jan 1, 1970

  • NIOSH
    OFR-88-84 Data Security For In-Mine Transmission - Phase II Report - Executive Summary Of Phase I Report

    By Jon G. Bredeson

    The electromagnetic noise that exists in a mining environment is quite severe and was shown to have been reasonably well documented by a number of researchers in the Phase I Report. The noise levels a

    Jan 1, 1980

  • NIOSH
    OFR-49-76 The Development Of A System To Suppress And Extinguish Fully Developed Coal Dust Explosions: Progress Report

    By L. D. Johnson

    On a project which is to develop a system to suppress coal dust explosions, a facility has been built and several devices tested. The facility is a 317-foot, 4.5-foot diameter shock tube and to date 5

    Jan 1, 1972

  • NIOSH
    MLA 25-86 - Mineral Resources Of The Park Range Wilderness Study Area, Nye County, Nevada ? Summary

    By Fredrick L. Johnson

    The Bureau of Mines, under Congressional mandate, conducted a mineral survey on the Park Range WSA (Wilderness Study Area) in 1984 and 1985. The WSA, located about midway between Tonopah and Ely, enco

    Jan 1, 1986

  • IOM3
    Nickeliferous sediments and sediment-associated nickel ores at Kambalda, Western Australia

    By H. L. Paterson, R. R. Keays, M. J. Donaldson, D. J. Boyack, M. F. Smith, J. J. Gresham

    "Albite-rich sedimentary rocks that contain abundant Fe sulphides occur in the lower portion of the ultramafic sequence at Kambalda and their broadly antipathetic relationship to most of the nickel or

    Jan 1, 1984

  • SAIMM
    Numerical approach to influence of pore pressure magnitude and gradient on fracture propagation in brittle heterogeneous rocks

    By T. H. Yang, K. K. Lee, Z. Z. Liang, C. A. Tang, L. C. Li, Y. Tsui, L. G. Tham

    Abstract: A series of numerical tests of hydraulic fracturing in heterogeneous rocks were performed to investigate the influence of pore pressure magnitude and gradient on initiation and propagation

    Jan 1, 2003

  • NIOSH
    OFR-68-83 Preliminary Predictive Model Of Subsidence Process Over Room And Pillar Workings - Phase I: Definition Of Factors

    By S. K. Mathur

    This report identifies all the possible activities, variables and factors that contribute to the surface subsidence process over room and pillar workings. These factors are responsible for mine instab

    Jan 1, 1982

  • SAIMM
    Influence of blasting charge distribution on the energy required for communition of rock

    By T. Marin, J. E. Seccatore, M. Cardu

    The most energy-intensive process in the mining industry is particle size reduction – comminution. The first phase of this process is blasting to fragment the rock from the initial Boussinesq’s halfsp

    Aug 8, 2024

  • ISEE
    Portable, Multi-Channel and Continuous Velocity of Detonation Recorders

    By Jackson R. Pressley, Bruce Vandenberg

    An explosive’s velocity of detonation, (VOD), can be used to indicate a number of important characteristics regarding the product’s performance, under specific field and test conditions.

    Jan 1, 1997

  • NIOSH
    OFR-26-86 Development Of The Claw Hammer Scaling Tool

    By James D. Eklund

    Towards the goal of improving safety, economy and efficiency of scaling in underground metal/nonmetal mines, Battelle developed a combination prying/hammering scaling tool. A prototype was subject

    Jan 1, 1983

  • NIOSH
    OFR-155-83 Evaluation Of The Black River Mine Telecommunication System

    By Dana T. Updyke

    An evaluation was made of one of several improved underground communication systems sponsored by the U.S. Bureau of Mines. The system evaluated was installed in a typical metal/non-metal room and pill

    Jan 1, 1983

  • NIOSH
    RI 7384 Refinement Of Hematite Crystal Structure

    By R. L. Blake

    The crystal structure of hematite, a-Fe203, has been refined as part of a continuing study of the behavior of phases in the Fe-O system during reduction and oxidation. Three-dimensional diffraction in

    Jan 1, 1970

  • SME
    Development Of The Fastmet Direct Reduction Process

    By J. A. Lepinski

    The FASTMETSM Process is a coal-based process for converting iron oxide fines into metallic iron. The end product, direct reduced iron (DRI) is used as a low residual charge material in electric arc f

    Jan 1, 1993

  • NIOSH
    OFR-9(1)-84 Development Of Models For Simulating Stormwater Runoff From Surface Coal Mined Lands - Unit Hydrograph Models

    By Michael E. Meadows

    The results of tests to determine the .regional applicability of four synthetic unit hydrograph models are presented. The SCS curvilinear (Haan), SCS single triangle, Williams and TVA double triangle

    Jan 1, 1983

  • SME
    Characterization and Comminution Studies of Low-Grade Indian Iron Ores Mining, Metallurgy and Exploration

    By S. I. Angadi, C. Eswaraiah, Sunil Kumar Tripathy, T. Santosh, Nilima Dash

    Banded hematite quartzite (BHQ) and banded hematite jasper (BHJ) ores represent a promising potential iron ore resource in the near future. The hematite and quartz in BHQ and the hematite and jasper i

  • NIOSH
    RI 7021 Process Development In Removing Sulfur Dioxide From Hot Flue Gases (In Four Parts) 3. Pilot Plant Study of the Alkalized Alumina System for SO2 Removal

    By D. Bienstock

    The use of alkalized alumina in removing sulfur dioxide from a coal-combustion flue gas at 625° F was investigated on a pilot plant scale. The absorber was 26 feet long and 1.6 inches ED. Counter-curr

    Jan 1, 1967

  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • NIOSH
    RI 4905 Malleable Chromium And Its Alloys

    By H. L. Gilbert

    Improvements in production of high-purity chromium metal by magnesium reduction of anhydrous chlorides and by hydrogen treatment of electrolytic chromium are reported. Hydrogen-treated chromium has b

    Jan 1, 1952