Search Documents

  • SME
    Integration Of Operations And Underground Construction: Sound Transit University Link

    By John Sleavin

    As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove

    Jan 1, 2010

  • ISEE
    Journal: Near Field Vibration Monitoring for Rock Mass Damage Control Tala Hydroelectric Project, Bhutan India

    By H. Venkatesh, Balachander R.

    This article discusses the method that was adopted for controlling damage to rock mass while excavating an underground powerhouse cavern at Tala Hydroelectric Project. It discusses in detail the near

    Jan 1, 2006

  • CIM
    The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - Draft

    In order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla

    Apr 1, 2005

  • AUSIMM
    The Introduction of Full Face Multiple Shotfiring at Collinsville State Coal Mine

    By Hargraves A. J

    The paper outlines events at the Collinsville State Coal Mine, Queensland, leading to the practice of full face multiple shotfiring in bord and pillar development places. The 1954 disaster is referred

    Jan 1, 1960

  • NIOSH
    RI 8518 Selective Extraction of Metals From Pacific Sea Nodules With Dissolved Sulfur Dioxide

    By S. E. Khalafalla

    In support of its goal to maintain an adequate supply of minerals to meet national economic and strategic needs, the Bureau of Mines has investigated a novel hydrometallurgical system with sulfur diox

    Jan 1, 1981

  • SME
    Ground Characterization And Feasibility Evaluation Of Tunneling Methods For Mather Interceptor

    By Mohammad R. Jafari

    The Camp Dresser & McKee (CDM) has been retained by the Sacramento Regional County Sanitation District (SRCSD) to design the Mather Interceptor, a portion of the South Interceptor and Mather Intercept

  • SME
    Piedras Verdes: Mexico?s Newest Copper Mine

    By P. J. Rua

    The Piedras Verdes copper mine is a new run-of-mine (ROM), heap leach, solvent-extraction/electrowinning (SX-EW) operation located 21 km (13 miles) north-northwest of the town of Alamos in the state o

    Jan 1, 2008

  • DFI
    Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven Piles

    By James A. Schneider

    Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin

    Jan 1, 2009

  • IIMP
    La mineragrafía: una importante arma de apoyo para la flotación

    By Luis Angel De Montreuil

    Ante el problema del tratamiento de minerales complejos, la demanda de eficiencia metalúrgica y bajos costos de operación, el ingeniero busca el apoyo de la mineragrafía como estudio microscópico de l

    Jan 1, 1986

  • NIOSH
    OFR-45-79 Development Of Water Capsules

    By Clarke E. Schuetze

    This project had as its objective the experimental investigation of water capsule production utilizing the Southwest Research Institute's submerged nozzle encapsulation apparatus (U.S. Patent 3,3

    Jan 1, 1978

  • AUSIMM
    Styles and Conditions of Hydrothermal Alteration and Vein Mineralisation at Golden Cross

    By M J. Begbie, P C. Keall, M P. Simpson

    The Golden Cross low sulfidation epithermal deposit occurs in pervasively altered andesite of the Waipupu Formation and in the Waiharakeke Dacite. The unaltered, post-mineral Whakamoehau Andesite over

    Jan 1, 1997

  • SME
    Practical Optimization Strategies for Coal-Washing Plants – Preprint 97-70

    By R. P. King

    The MODSIM mineral processing plant simultor is used to find optimal combinations of target separation specific gravities in a typical modem coal washing plant. A plant that is set up with these optim

    Feb 24, 1997

  • AUSIMM
    Mining Ventures and Environmental Changes

    A consideration of mining ventures and the changes of an environmental nature that occur. The paper is introduced with a general statement claiming recognition that mining ventures are important to hu

    Jan 1, 1981

  • TMS
    Sustainable Electrolysis for Electrowinning and Electrorefining of Metals

    By Geir Martin Haarberg

    Modern electrolysis technologies can provide possibilities for developing sustainable processes in terms of energy and environment. Laboratory experiments were carried out to study electrodeposition o

    Jan 1, 2010

  • NIOSH
    RI 3031 Acrolein as a Warning Agent for Detecting Leakage of Methyl Chloride from a Multifle Refrigeration System

    By H. H. Schrenk, W. P. Yant, F. A. Patty

    "INTRODUCTION In accordance with the outline of investigation described in a previous report 5 of the Bureau of Mines dealing with the use of acrolein for detecting leakage of methyl chloride from uni

    Sep 1, 1930

  • SME-ICGCM
    New Monitoring Technologies for Measuring the in-situ Performance of Rock Bolts

    By Hani Mitri

    Understanding the interaction between rock bolts and underground rock movement is critical for safe and cost effective underground excavation design. Although early research on this subject involved a

    Jan 1, 2012

  • AUSIMM
    Measuring the Influence of Sample Size on the Precision and Accuracy of Gravity Gold Estimation

    By A Giblett, T J. Napier-Munn

    This paper presents the results of a test program evaluating the impact of sample mass on the precision of Stage 1 gravity recoverable gold (GRG) test results. Four ore types ranging from low to high

    Sep 7, 2015

  • AUSIMM
    The AusIMM in New Zealand

    In this, the centennial year of The Institute, it is appropriate that the history of the Institute in New Zealand be recorded. I am indebted to John Dew, compiler of the centenary publication æMining

    Jan 1, 1993

  • NIOSH
    RI 9643 - Full-Scale Testing Of The Float Dust Deposition Meter

    By Robert A. Cortese, Henry E. Perlee

    Coal dust and float coal dust, produced during normal mining operations, in underground coal mines, are carried from the point of origin downstream by the ventilating air, where it deposits on the sur

    Jan 5, 1998

  • SME
    Removal Of Cadmium From Raw Indium By Physical And Chemical Methods

    By Z. H. Zhou

    It is difficult to remove cadmium from raw indium using only electrolytic refining because their standard potentials are similar. In this paper, physical and chemical methods were used to remove Cd fr

    Jan 1, 2007