Search Documents

  • SME
    El Abra - Two Years Later

    By Rainer Kahrger

    This paper is a follow-up to the paper presented at the SME meeting in April of 1996. Since then, the El Abra facility has been started up, 9 months ahead of schedule, and has processed about 45 milli

    Jan 1, 1998

  • AUSIMM
    Prohibited Activities and the Resource Management Act 1991 û Does æProhibitedÆ Mean æForbiddenÆ?

    By M L. van Kampen

    The Resource Management Act 1991 provides for activities to be classified as permitted, controlled, restricted discretionary, discretionary, non-complying or prohibited in district and regional plans.

    Jan 1, 2007

  • AUSIMM
    Lithospheric Footprints of Giant Orogenic Gold Systems

    By R J. Goldfarb, A B. Christie, D I. Groves

    Small orogenic gold deposits have the same deposit-scale geological and geochemical features as those that characterise giant orogenic gold systems (>16 Moz Au). Therefore, a broader-scale approach

    Jan 1, 2005

  • NIOSH
    IC 9106 Availability Of Elemental Sulfur And Pyrite Concentrate-Market Economy Countries - A Minerals Availability Appraisal

    By D. A. Buckingham

    Engineering and economic evaluations were performed by the Bureau of Mines on 14 Frasch sulfur, 1 native sulfur, and 21 metal sulfide operations in 11 market economy countries. The evaluation included

    Jan 1, 1986

  • CIM
    Improvements in HPGR and Grinding Mill Technology

    By Cosmin Carpinisan, Erich J. Hofmann, Stephen J. Hall

    "Since presenting a technical paper regarding their unique capabilities in Forged Steel Mill Gearing at the SAG-2006 Conference, Australian heavy engineering company Hofmann Engineering has pioneered

    Jan 1, 2012

  • SME-ICGCM
    Optimizing Secondary Tailgate Support Selection

    A model was developed to facilitate secondary tailgate support selection based on analysis of over 100 case studies, compiled from two different surveys of operating longwall coal mines in the United

    Jan 1, 1996

  • SME
    Numerical Investigation of the Effect of a Novel Wet Scrubber on Dust Reduction in an Underground Coal Mine Mining, Metallurgy and Exploration (330345b3-631c-4721-bb65-792de9742b60)

    By Thomas Novak, Sampurna Arya

    Controlling dust generation and keeping it below permissible limits to meet federal dust standards at the working face of a roomand-pillar coal mine is a challenge for a mine operator. With the recent

  • AUSIMM
    The Metallurgical Treatment of the Sulpho-Telluride Ores of Kalgoorlie, with Special Reference to Experiments Conducted and Sulphide Mill Erected on the Associated Gold Mines of Western Australia Limited

    The sulphide ores of the principal lodes of the Boulder Mines are mainly composed of a schistose guess with a varying proportion of silica and lime, containing tellurides of gold, silver and mercury,

    Jan 1, 1901

  • SME
    Characterization Of Coal And Quartz Dust In Interior Basin Coal Mines

    By Y. Paul Chugh

    NIOSH and the Illinois Clean Coal Institute are funding studies on characterization of coal and quartz dust in Interior Basin mines since 2009. Coal dust characteristics vary significantly and, are vi

    Jan 1, 2011

  • SME
    Assessment Of Stable And Failed Pillars In Underground Limestone Mines

    Pillars in underground limestone mines are required to support the overburden and provide a safe, stable working environment for mining personnel and equipment. Pillar stability was assessed by the Na

    Jan 1, 2008

  • SME
    Identification And Enumeration Of Asbestos Fibers In The Mining Environment: Mission And Modification To The Federal Asbestos Standard

    By Arthur M. Langer

    Since the promulgation of the first Federal Asbestos Standard by the Occupational Safety and Health Administration in 1972, other federal agencies have modified the standard to better carry on their

    Jan 1, 2008

  • AUSIMM
    The Greymouth Coal Project

    The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn

    Jan 1, 1997

  • CIM
    Slurry Pumping Practice

    By C. A. Horne

    "The transportation of mineral solids in the form of slurry is a subject most of us are associated with and, in fact, live with on a daily basis. The design parameters of slurry systems and most impor

    Jan 1, 1976

  • SME
    The Immobilization Of Free Ionic Gold And Asparagine-Complexed Ionic Gold By Sporosarcina Ureae: The Importance Of Organo-Gold Complexes In Gold Mobility

    By W. S. Fyfe, G. Southam, T. J. Beveridge

    Bacterial populations play an active role in mineral weathering in subsurface and near-surface environments e.g., supergene enrichment of Cu at Morenci, AZ. An invitro bacterial biofilm model was use

    Jan 1, 1999

  • SME
    An Evaluation Of The Risks Of Lung Cancer And Mesothelioma From Exposure To Amphibole Cleavage Fragments

    By John F. Gamble

    Amphiboles are hydrated mineral silicates five of which occur in asbestiform habits as asbestos grunerite (amosite) asbestos, riebeckite (crocidolite) asbestos, anthophyllite asbestos, tremolite asbes

    Jan 1, 2007

  • AUSIMM
    Re-development of the Big Bell Mine, Cue

    The area around Big Bell was actively explored and sporadically mined for gold from 1904 onwards. The lease was named Big Bell in 1913. The property became established as a major mining centre with

    Jan 1, 1989

  • SME
    Effects Of Obstructions, Sample Size And Sample Rate On Ultrasonic Anemometer Measurements Underground

    By A. L. Martikainen

    In fluctuating airflow, continuous air velocity recording is the most reliable method of air velocity measurement. It allows for fast recognition of changes and the calculation of long-term averages.

    Jan 1, 2011

  • NIOSH
    RI 2641 Mine Accident Statistics

    By W. W. Adams

    "The main purpose in the compilation of accident statistics is to reveal conditions that may result in injury to persons or property so that remedial measures may be applied. For practical reasons it

    Sep 1, 1924

  • AUSIMM
    Sedimentary Structures in the Metamorphic Rocks and Orebodies of Broken Hill (7122c7bd-f6fa-43f0-828a-39df96a7a19e)

    B. P. Thomson (South Aust. Dept. of Mines): Dr. A. B. Edwards presents in the published discussion on the above paper, his interpretation of the dolerite dyke-lode relationship as a major objection to

    Jan 1, 1959

  • AUSIMM
    Laboratory Determination of the Ash Content of Some Australian Coals Using Radioisotope Techniques

    By Fookes R. A, Gardner K. J, Gravitis V. L, Watt J. S, Steffner E. J

    Two radioisotope techniques suitable for the rapid laboratory determination of the ash content of coal have been tested ou unwashed coal samples from four Australian coal seams. In one techniqne, meas

    Jan 1, 1982