Search Documents

  • AUSIMM
    Structural Setting of the Empire Vein System of the Golden Cross Deposit, New Zealand

    By M J. Begbie, K B. Sporle

    The Golden Cross low sulfidation epithermal deposit produced approximately 750,000 ounces of Au from two ore zones: the underground Empire Vein System and the open pit stockwork. The Empire Vein Syste

    Jan 1, 1998

  • SME
    A Case Study of the Stability of a Non-Typical Bleeder Entry System at a U.S. Longwall Mine

    By Ihsan Berk Tulu, Mark Van Dyke, Ted Klemetti, Deniz Tuncay

    "Longwall abutment loads are influenced by several factors, including depth of cover, pillar sizes, panel dimensions, geological setting, mining height, proximity to gob, intersection type, and size o

    Jan 1, 2019

  • CIM
    Recent Improvements in Grinding at the Williams Mine

    By T. R. Raponi

    "The Williams Mine, Canada's largest gold mine, processes over 6,000 t/d of ore utilizing SAG/ball milling, leaching and CIP, carbon stripping, electrowinning and refining to produce gold dare bullion

    Jan 1, 1994

  • NIOSH
    Possible Mechanism For Surface Vibrations Near Maxwell Hill, West Virginia

    By Anthony Iannacchione, Christopher Mark

    Residents of Maxwell Hill, a suburb of Beckley, West Virginia, reported from January until March of 1988 a series of earth tremors. The tremors rattled dishes, and the noises associated with tremors w

  • AUSIMM
    Government Coodrination and Liaison: The Lihir Project

    By Van Dusen M

    The involvement of concerned parties in all aspects of the Lihir Project from an early stage has promoted good relations between all groups. Activities involving landowners, the Lihir community, t

    Jan 1, 1991

  • NIOSH
    RI 9646 - Concluding Evaluation Of A Continuous Haulage Guidance Sensor

    By John J. Sammarco

    The mining industry has the highest average annual fatality rate among major U.S. industries. To address this, the National Institute for Occupational Safety and Health, Pittsburgh Research Laborator

    Jan 11, 1998

  • SME
    Mine Closure At San Martin Mine In Honduras, Central America - Preprint 09-111

    By R. E. Chaves

    San Martin Mine is an open pit, gold heap leach operation located approximately 70 kilometers from the Honduran capital of Tegucigalpa. Mining operations commenced in 2000 and were completed late in

    Jan 1, 2009

  • AUSIMM
    Mineral Sands in Australia - An Update

    Australia is the world's leading producer and exporter of mineral sands. Despite increased production from some other countries in recent years, Australia maintained its No.1 position in 1988

    Jan 1, 1989

  • DFI
    Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:

    By B. Ramanathan

    The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed

    Jan 1, 1996

  • TMS
    Improving Energy Efficiency in a Modern Aluminum Casting Operation

    By Mark Osborne, Ray D. Peterson, C. Edward Eckert

    "The theoretical melting energy requirement for a typical hypoeutectic aluminum-silicon alloy is approximately 520 BTU/lb. It has been demonstrated, however, that even a state of the art secondary pro

    Jan 1, 2009

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems, Part 2: General Applications

    By Larry Schneider

    I n the simplest application of a shock tube initiation system, the tubing acts as a “relay line” which passes a detonation signal from borehole to borehole. When the signal arrives at each borehole,

    Jan 1, 1995

  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • CIM
    Exploitation de la zone nord à la Mine Kiena avec des équipements captifs

    By Rosaire Emond

    Le concept du forage horizontal a été développé voilà de nombreuses années. Différents types de plate-formes permettant le forage horizontal depuis une cheminée ont été conçus par divers manufacturier

    Oct 1, 2001

  • AUSIMM
    The Production of Cement in Australia

    By Benkendorff P. N

    Cement production in Australia approximates 6.5 million tonnes per year. Cement clinker is sourced from 15 plants which operate 28 kilns. Cement grinding is conducted at 14 of the clinker plants

    Jan 1, 1989

  • SME
    Five To Be Honored By National Mining Hall of Fame

    The National Mining Hall of Fame will induct five mining greats on Saturday, Sept. 17, 2005 at the Museum Convention Center in Leadville, CO. The 18thAnnual National Mining Museum and Hall of Fame In

    Jan 1, 2005

  • CIM
    A Preliminary Comparison of Coal Classification and Processing between Canada and China

    By Ting Lu, Gerard Laman

    "This document compares the systems of coal classification described under ASTM standards used in Canada to GB standards used in China. A preliminary connection of metallurgical coal classes was set u

    Jan 1, 2012

  • SME
    Technology News - Air-Supported Conveyor Lowers Cost, Runs More Safely

    Several years ago, Hudco Industrial Products began experimenting with the idea of levitating a conveyor belt with a film of air, much like the puck on an air-hockey table. While conducting its resear

    Jan 1, 2002

  • SME
    Connectionist Approach For Modeling The Dry Roll Magnetic Separator

    Magnetic separation is an age-old technique for mineral beneficiation operations. The existing mathematical models for magnetic separators are quite complicated, and it is very difficult to measure th

    Jan 1, 2009

  • SME
    South Interceptor Tunnel Construction Using a Lovat EPBM

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja

    Jan 1, 2003

  • IOM3
    Current status of determination of mineralogical balances for platinum-group element-bearing ores

    By L. J. Cabri

    Although no complete mineralogical balances have been published, the background knowledge and proven, highly sensitive analytical techniques to produce them already exist. For PGE-Cu-Ni sulphide ores

    Apr 1, 1994