Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil DepositsBy Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto
"Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained
Jan 1, 2014
-
Red Hot Opportunities in a Cool EconomyBy Douglas Kathol
Coal in the 1990?s Exit of the integrated oil company [Shell Arco Mobil Exxon Mapco Kerr McGee Hansen Nerco Sun] Continued decline in coal prices Significant mergers & acquisitions
Jan 1, 2002
-
Presidential Address: Platinum Perspectives - Introduction (247b6aee-fd10-4deb-ae5b-bdfb2afc1ee5)By L. A. Cramer
Platinum metal was first utilized by the Inca civilization in South America where it was found in alluvial deposits along the San Juan and Atrato rivers that lie between the Andean mountain range in C
Jan 1, 2001
-
Reclaiming Aggregate Mining Sites In Minnesota Using Private/Public PartnershipsBy C. G. Buttleman, W. C. Brice
In Minnesota, reclamation of active aggregate mining sites is primarily regulated through local permits issued at the county, township, or municipality. However, for abandoned or depleted aggregate m
Jan 1, 2000
-
Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal MiningBy B. Asbury, M. Cigla, C. Balci
The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel
Jan 1, 2002
-
A novel sink-hole fluidisation method for dry separation of iron ore finesBy S M. Iveson, K P. Galvin, D Kumar
Dry separation of iron ore fines and other heavy minerals has previously been achieved using one of two main approaches. The first is an inclined table with an upward airflow via small holes to help f
Jul 24, 2017
-
Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined ShaftBy D. Kruse
Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov
Jan 1, 2011
-
Long term demand for construction raw materials and the implications for minerals provision; the case of sand and gravel in the NetherlandsBy M. van Elp, R. Saitua Nistal, P. J. M. Groot
Demand for construction raw materials depends on investment in housing, other buildings and infrastructure. The provision of these materials requires early knowledge of future trends in construction i
Jan 1, 2011
-
Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery SystemThe recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.
Feb 27, 2013
-
Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesionless SoilsBy Mohammed Sakr
The use of helical piles as a deep foundation option has considerably increased in the recent years to support a variety of loads, from small loads for several applications such as residential housing
Jan 1, 2011
-
Textures of Some Copper-Bismuth Sulphide Ores From Mount Ellison, N.T.Prominent among the ore minerals at Mt. Ellison, in the Brock's Creek district, Northern Territory, are a number of copper-bismuth sulphides wittichenite, aikinite, emplectite, in association wit
Jan 1, 1963
-
RI 3461 Time Study Analyses - Progress Report 1. - Quarry Shovel Loading ? Introduction (a3ff6416-8ee7-4a29-869e-ea3999cf5df2)By J. R. Thoenen
Profits in the crushed-stone industry, as in any other, represent the difference between selling price and production cost. When consumer demand increases rapidly, as occurred in the crushed-stone ind
Jan 1, 1939
-
Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 TunnelBy S. H. Jason Choi
The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne
-
Basics of Salt BlastingBy Anthony J. Konya
"This paper was written during part of the author’s student co-op with Cargill Salt at its Avery Islandunderground salt mine in Louisiana. Blasting salt is a unique type of blasting that is different
Jan 1, 2016
-
Recent Advances in Porphyry Copper Geology and Their Exploration UtilityBy R H. Sillitoe
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Geological concepts are employed routinely in porphyry copper exploration at the area selec
Mar 18, 2015
-
Nucleation Overpotential and the Role of Nucleation Early and Late in a Deposition CycleBy Peter A. Adcock, Rob Fraser
Interest in monitoring nucleation overpotential in electrometallurgical processes dates back some 40 years or more. Conversely, remarkable progress has been made in recent years on describing in detai
Jan 1, 2016
-
Queens Bored Tunnels, East Side Access, New YorkBy David Smith, Bernie Martin
The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr
Jan 1, 2005
-
Fan-Structure Shear Rupture Mechanism as a Source of Shear Rupture RockburstsBy B. G. Tarasov
This paper proposes the further development of a recently identified shear rupture mechanism (fan mechanism) that elucidates a paradoxical feature of hard rocks ? the possibility of shear rupture prop
Jan 1, 2014
-
LHD optimization at an undergroundchromite mineBy W. Mbhalati
"Conzal Mine was not meeting production targets in 2013, and it was established that this was caused by the inability of the load haul dump machines (LHDs) to tram the required tonnages. An investigat
Jan 1, 2015
-
Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and ConstructionBy F. B. Samani, B. Stabel
The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the
Jan 1, 2003