Search Documents

  • NIOSH
    OFR-149-84 Development And Validation Of A Training Program For Operators Of Noncoal Equipment - Volume I. Final Report

    This report describes the development of training materials for the operators of underground mining equipment in the underground metal and nonmetal mining industry. The objective was to determine the

    Jan 1, 1984

  • NIOSH
    IC 8808 In-Mine Evaluation Of Underground Fire And Smoke Detectors (6f17c200-99f7-4b63-9502-cedfeb78fb40)

    By Russell E. Griffin

    The current state-of-the-art of fire and smoke detection technology is reviewed from the standpoint of suitability for use in underground metal and nonmetal mines. Detection modes, fire signatures, an

    Jan 1, 1979

  • AUSIMM
    Robust versus Flexible Open Pit Mine Design

    Strategic planning in mining is an important value accretive process. One of the most important aspects during the planning phase is determining the correct mine and plant design. The traditional mine

    Dec 6, 2010

  • NIOSH
    RI 2757 Extinction of Methane Flames by Helium

    By H. F. Coward, G. W. Jones

    "IntroductionIn the course of an investigation on the influence of black damp (a mix of nitrogen and carbon dioxide) on the limits of inflammability of fire damp (methane) in air, some new information

    Jun 1, 1926

  • CIM
    Mitigating Brown Field Project Risks Using Advanced Simulations

    By S. Bellec, A. Berton

    "Usually, steady state mass balances are used for the design of mineral processing plants. However, this tool does not take into account the impact of process inputs variability nor does it evaluate p

    Jan 1, 2015

  • AUSIMM
    Manganese and Iron in Broken Hill Sphalerite

    Individual specimens of sphalerite from the Broken Hill lode vary considerably in manganese and iron contents, even within the same orebody, so that study of the overall variation of manganese and iro

    Jan 1, 1956

  • NIOSH
    IC 8618 Overcoring Equipment And Techniques Used In Rock Stress Determination

    By Verne E. Hooker

    Stress-relief techniques and instrumentation have been developed through many years of research in the Federal Bureau of Mines and successfully used to determine the in situ state of stress in rock. T

    Jan 1, 1974

  • CIM
    Traitement des eaux contaminées - Mine Restigouche, Nouveau-Brunswick

    Plan de l?exposé ?? Présentation du site de la mine Restigouche et du mandat confié à Genivar ??Dénoyage de la mine ??Processus d?enlèvement des boues au fond de la fosse ??Utilisation de Géotubes

    Feb 1, 2008

  • CIM
    Antiscalants for Calcium Scale Control in Gold Process Circuits

    By Brad Wells, Wayne Bull, Wayne Dickinson

    "Antiscalants were evaluated for control of calcium carbonate (CaCO3) in gold processing applications. Under severely supersaturated conditions, 100 percent inhibition was achieved with 30 ppm antisca

    Jan 1, 2014

  • DFI
    Recommendations For Implementing And Interpreting Non­Destructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.

    By Jose L. Garcia

    The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra

    Jan 1, 2006

  • CIM
    Hangingwall sloughing mechanism in open stope mining

    By J. Ran

    "Hangingwall sloughing is the major cause of unplanned stope dilution in open stope mining. Understanding the hangingwall sloughing mechanism can guide the stope design in minimizing the unplanned dil

    Jan 1, 2002

  • AUSIMM
    The Mineralogy and Paragenesis of the Crocidolite Veins at Wittenoom Gorge, W.A.

    Several factors contributing to the loss of fibre during treatment are a function of the paragenesis of the veins. The occurrence, of magnetite from the cap rock within the veins prevents complete fib

    Jan 1, 1963

  • AUSIMM
    Presidential Address (d1c8711c-24f7-4067-8feb-50759fcd4917)

    In presenting this address I am conscious of the honour that has been paid me in my election to this important office, and I am very aware that I follow, in the position of President, many distinguish

    Jan 1, 1963

  • AUSIMM
    The Relation of Ore-Occurrence to General Geology, Brocks Creek District Northern Territory, Australia

    The area (330 sq. miles) shown on the map of the Brocks Creek District (Fig. 1), was mapped by the Northern Territory geological party of the Aerial, Geological and Geophysical Survey of Northern Aust

    Jan 1, 1950

  • AIME
    Minerals Beneficiation - Analysis of Data from Continuous Flotation Tests

    By C. C. Harris, A. Jowett, S. K. Ghosh

    An equation derived from first-order kinetics and accounting for return from froth to pulp has correlated continuous flotation data. The concentration of floatable material in the pulp can be altered

    Jan 1, 1963

  • AUSIMM
    Presidential Address

    In referring to two subjects of interest to the Members of this Australasian Institute of Mining Engineers, I would at the outset desire to express our gratification that to-day we are able to welcome

    Jan 1, 1901

  • SME-ICGCM
    Analysis Of Rockbolt Performance At The Waste Isolation Pilot Plant

    By Liane J. Terrill

    Rockbolt failures at the Waste Isolation Pilot Plant have been recorded since 1990 and are categorized in terms of mode of failure. The failures are evaluated in terms of physical location of installa

    Jan 1, 1995

  • AUSIMM
    Isotopic Dating of the Leucocratic Granite, Rum Jungle, Australia

    By Ruxton B. P, Rhodes J. M

    Two Rb-Sr ages are discernible in data concerning the leucocratic granite which is the youngest pre-sedimentation phase of the crystalline basement complex at Rum Jungle, Northern Territory, Australia

    Jan 1, 1977

  • AUSIMM
    Mining on Narrow Lodes

    THE object of this paper is to review certain features in connection with the mining of narrow lodes, say up to 20 ft. or so wide. The types of ore-body to which it is intended to refer are those whic

    Jan 1, 1912

  • SME
    Big Walnut Outfall Augmentation Sewer?Part II: Tbm Case History

    By Tom Szaraz

    Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer?Part II (BWOAS) consists of 13,200 feet of tunnel of 12-foot tunnel passing mainly through gla