Search Documents

  • SME
    Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case Study

    By Y. Q. Zhang, S. S. Peng

    Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st

    Jan 1, 2004

  • SME
    Measurement and Analysis of Foundation Tilt Resulting From Mine Subsidence in Southern Illinois

    By Larry R. Powell

    The Bureau of Mines, in cooperation with the Illinois Mine Subsidence Insurance Fund, is monitoring the response of two foundations to ground movements induced by subsidence from high extraction minin

    Jan 1, 1986

  • AUSIMM
    X-ray Fluorescence Analysis of Mineral Samples Using Solid State Detector and Radioisotope X-ray Source

    The use of solid state detector and radioisotope x-ray source for x-ray fluorescence analysis is illustrated by analysis for iron, copper, zinc, tin, and lead in about 700 samples taken from Australia

    Jan 1, 1974

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003

  • SME
    Inner City Slurry Tunneling—Project Asdam, Antwerp, Belgium

    By Klaus Rieker

    North of Antwerp central train station, two single-track tunnels for the high-speed train line between Brussels and Amsterdam were constructed. At the same time, the central train station was modified

    Jan 1, 2007

  • AUSIMM
    Is an 80th Percentile Design Point Logical?

    By D David

    Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common proces

    Jul 15, 2013

  • AIME
    Fluid Bed Roasting Of Zinc Concentrate And Production Of Sulphuric Acid And Phosphate Fertilizer At Canadian Electrolytic Zinc, Ltd . Valleyfield, Quebec

    By K. H. Heino

    Two 200 T/da Lurgi Turbulent Layer fluid-bed roasters have been in operation at Canadian Electrolytic Zinc Limited since 1966. Zinc concentrate containing 52-54% Zn, 9-11% Fe,31-33% S is treated to pr

    Jan 1, 1970

  • SME
    The Coronado Traffic Diversion Tunnel

    By Jon Y. Kaneshiro, Ed Walton, Stephen J. Navin, Robert M. Sergeant, Storer J. Boone

    The Coronado Traffic Tunnel is a proposed two-lane, reversible, road tunnel, which will relieve severe peak hour congestion problems on surface streets. The tunnel will take traffic from the Coronado

    Jan 1, 2001

  • AUSIMM
    By-Product Oxygen as a Stimulant in Zinc Concentrate Roasting

    By Cooper R. J

    The essential features of the zinc concentrate roasting installation at the Risdon Works by the Electrolytic Zinc Company of Australasia Ltd. are given.The problem of maintenance of ignition in down-d

    Jan 1, 1958

  • CIM
    Update of Chilean Mining Projects and Technological Trends

    By C. Cornejo, C. Schuffeneger, J. Rosas

    "At the end of 2010 the AMSA Esperanza Concentrator started commissioning. Located in the Atacama Desert this project is the first of several large size concentrators developed recently to operate in

    Jan 1, 2012

  • AUSIMM
    Presidential Address (f9446de2-f07b-4880-8e2a-dc5f91667a36)

    Mr. BRADFORD said :-On assuming this chair, which has been occupied by so many gentlemen of conspicuous ability; my first words must be an expression of the gratitude I feel for the honour you have do

    Jan 1, 1926

  • SME-ICGCM
    Proposed Laboratory Quality Control Test Method for Resin Capsules Used in Underground Mines in South Africa

    By Dave Minney

    The South African mines health and safety regulations require that mine management establish a quality management system for rock support material. Quality control of resin capsules used as a support

    Jan 1, 2007

  • NIOSH
    IC 8877 SIC-Based Demand Information System For Nonfuel Minerals

    By George K. Schenck

    This Bureau of Mines publication describes and evaluates a Standard Industrial Classification (SIC) based end-use data system for minerals that is designed to link the demand for minerals to economic

    Jan 1, 1982

  • SAIMM
    Extending Empirical Evidence Through Numerical Modelling in Rock Engineering Design

    Models are used in engineering to reproduce reality as faithfully as possible so that the expected response of a system for given actions or inputs can be determined. In the field of rock engineering,

    Jan 1, 2014

  • ISEE
    An Improved Technique for Predicting Vibration Levels from Tunnel Blasting

    By W. J. Birch, M. Kirke

    Despite increasing competition from mechanical methods of tunnelling, the drill and blast method is often still the most viable method of excavating tunnels in strong and abrasive rock. To advance a t

    Jan 1, 2005

  • SME
    Conversion Of A Tailing Impoundment To A Freshwater Reservoir, The Eagle Park Reservoir Project, Climax Mine, Colorado

    By J. L. Cupp, R. C. Ford, B. R. Romig

    The Climax Molybdenum Mine, located near Leadville, Colorado, is the site of a lengthy mining history spanning more than 80 years. In the 1960’s, extraction of molybdenum from oxide ore located adjac

    Jan 1, 1999

  • NIOSH
    RI 3483 Progress Reports - Metallurgical Division - 35. Electrometallurgical Investigations ? Introduction

    By J. Koster

    [In lQ jG thc E'lcct,ro:~(: L7.l :~u..-ic:ll S;%cti ?n of t?c :I. tcIl~tr,-;lcal 3:vi cioa, ?U~CE~U of lv!irtos, bc,~m an 9.ct iv.t In-:?*t ik7;5i GI of r.:ct.l-;c?;is for rccovcrin,; niclrel, co

    Jan 1, 1939

  • ISEE
    Preparing a Written Blast Plan (1b8a88a8-1e7f-429f-bd71-b32f7b3dbf86)

    By David Ziegler

    A formal blast plan is sometimes required for projects involving rock excavation. A written blast plan submitted with a bid proposal can also be an important sales tool. A blast plan will cover the ba

    Jan 1, 2003

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • IIMP
    Flotación en la descarga de la molienda primaria: una alternativa para mejorar la performance metalurgica en la Compañía Minera Raura

    By Fernando Bermejo

    El presente texto describe la implementación del método Flash - Flotation para el proceso de optimización de plantas concentradoras polimetálicas en la Compañía minera Raura donde se tienen diferentes

    Sep 12, 2005