Search Documents

  • AUSIMM
    Economic Impact Evaluation of Spoil Dump Reshaping Practices (Australia)

    By W C. Burton, J S. Kuszma, T O. Aspinall

    The environmental impact of mining and evolving environmentallegislation has received increased attention worldwide in the last two decades (Bradfield, Shultz and Stone, 1996). The potential impacts a

    Jan 1, 2000

  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • CIM
    Materials Challenges in Mine, Mill, and Smelters

    By N. Behnood

    "This paper describes how material selection, quality assurance, and failure investigation play important roles in the efficiency and safety of mining and metallurgical operations.INTRODUCTION Materia

    Jan 1, 2015

  • SME
    An Evaluation Of The Potential For Selective In Situ Leach Mining Of Manganese Ores

    By Dianne C. Marozas

    The U.S. Bureau of Mines is conducting research to evaluate the potential for developing an in situ leach mining process that will selectively extract manganese from oxide ores, leaving gangue relativ

    Jan 1, 1991

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • NIOSH
    Index Of Selected Gasification Patents (In Three Parts) III. Belgian, French, German Italian, And Swedish Patents - Introduction

    THE Synthetic Liquid Fuels Act (30 U.S.C., 321-325, and amendments) become law April 5, 1644, and a period of intensive research and development in this field was begun by the Bureau of Mines. As par

    Jan 1, 1964

  • IIMP
    Aplicación del sistema de gestión Hochschild Mining DNV

    By Carlos Virrueta Zevallos

    El presente texto describe los lineamientos necesarios para construir un sistema de control de perdidas sólido en la Corporación HOCHSCHILD MINING DNV, el cual se basa en un liderazgo, compromiso y a

    Sep 12, 2011

  • CIM
    Comparing the Behaviour of Modeled Paste in 2D and 3D, using Both Simplified and Complex Stope Geometries

    By Ryan L. Veenstra

    This paper presents a modelling study of a cemented paste backfill in an underground stope. The model was developed to help provide a better understanding of what is happening in the stope during the

    Jun 1, 2012

  • DFI
    Theoretical Examination of Initially Bent Piles

    By Janne P. Isohaka, Anssi M. Laaksonen

    "Abstract In Scandinavia the use of steel pipe piles in bridge foundations started in the mid-1980s and has increased steadily since. As the piles driven in soft soils are slender, they can fail by bu

    Jan 1, 2014

  • NIOSH
    IC 9296 Basic Geological And Analytical Properties Of Selected Coal Seams For Coal Interface Detection

    By Slavoljub Makslmovic

    One important element of the U.S. Bureau of Mines computer-assisted mining research program is the development of a reliable coal interface detection (CID) system. Several candidate CID concepts curre

    Jan 1, 1993

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • CIM
    Mechanical Integrity versus Process Safety Management Requirements

    By Hugo Julien

    According to OSHA 29 CFR Part 1910.119 (Process safety management of highly hazardous chemicals), Canadian Provincial Safety Standard Acts or Federal laws, the owner of stationary equipment (Boilers,

    Jan 1, 2014

  • SME
    Investigations On Recovery Of Hematite From Two Different Banded Iron Ores By Flotation

    By B. Das

    Hematite floatability from two low grade banded iron ores of India, namely banded hematite quartzite (BHQ) and banded hematite jasper (BHJ) using fatty acids and amine as the collectors is investigate

    Feb 27, 2013

  • CIM
    Rare Earth Metal Production Using Infinium Pure Oxygen Anodes™

    By Adam Powell, Matthew Earlam

    INFINIUM, Inc. is scaling up a new molten salt electrolysis process for producing rare earth metals. Instead of conventional carbon anodes, this process uses Pure Oxygen Anodes™ which employ a stabili

    Jan 1, 2014

  • DFI
    Drilling And Dewatering In An Urban Environmentprivate - Project Description And Location

    By Joel Moskowitz

    In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M

    Jan 1, 1996

  • DFI
    Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? Synopsis

    By A. K. C. Chan

    Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460

    Jan 1, 2010

  • TMS
    Low Temperature Reduction of Chromite Ores with Carbon

    By R. G. Reddy

    Reduction of different chromite ores with carbon was studied as a function of C/FeO ratio and temperature in the range 700 °C to 1100 °C by thermogravimetry (TGA) analysis. Powders of chromite ore(-15

    Jan 1, 1998

  • TMS
    Green Recycling of EEE: Special and Precious Metal Recovery from EEE

    By C. E. M. Meskers

    Electronic and Electric Equipment contains a range of components made of a wide variation of metals, plastics and other substances. Up to 60 elements can be found in complex electronic equipment: base

    Jan 1, 2009

  • TMS
    Variance And Heterogeneity In Melt Samples From Industrial Ferro-Alloy Furnaces

    By Jacques J. Eksteen

    Any effort to improve the metallurgical control of industrial furnaces employed in the primary extraction of high carbon ferroalloys are bound to fail unless the variability of the melt is not fully a

    Jan 1, 2006