Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Tunnelling on the South East Transit Project

    By T. W. Peglas, J. Doherty, R. A. Day

    The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,

    Jan 1, 2001

  • SME
    Reclaiming Aggregate Mining Sites In Minnesota Using Private/Public Partnerships

    By C. G. Buttleman, W. C. Brice

    In Minnesota, reclamation of active aggregate mining sites is primarily regulated through local permits issued at the county, township, or municipality. However, for abandoned or depleted aggregate m

    Jan 1, 2000

  • SME
    Summersville Raw Water Intake

    By Douglas Banks

    Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake

    Jan 1, 2005

  • SME
    Construction And Geological Engineering Of An Underground Ore Bin

    By J. F. T. Agapito, G. P. Bratton

    A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos

    Jan 1, 1985

  • SME
    Challenges And Triumphs Of A Large-Diameter Microtunnel Relief Interceptor Sewer In Indianapolis

    By Jeremy Morris

    The city of Indianapolis has more than 25,000 homes currently on septic systems. Many of these systems do not function well because of their age and surrounding soil conditions. As Indianapolis has wo

    Jan 1, 2011

  • SME
    Long-Term Trends in Copper Prices

    By John E. Tilton

    Real copper prices during the past several decades display two striking characteristics. First, they are highly volatile. Within a year or two, copper prices can rise or fall by 30% or more. Second

    Jan 1, 2002

  • SME
    Cracking The Code—Assessing Implementation In The United States Of The Codes Of Practice For Risk Management Of Tunnel Works

    By Terry W. Mellors, Robert J. F. Goodfellow

    The underground industry has been forced to reconsider risk management sincethe introduction and implementation of the “Joint Code of Practice for Risk Management of Underground Works in the UK” publi

    Jan 1, 2007

  • SME
    Cribless Tailgates In The Pittsburgh #8 Coal Seam Employing Cable Trusses – Preprint 97-199

    By A. Wahab Khair, John G. Oldsen, John C. Stankus, Song Guo

    During the last several years, implementation of trusses, in lieu of wood cribs, has been successful for supplemental tailgate support in the Pittsburgh seam. This paper reviews, the truss support sys

    Feb 24, 1997

  • SME
    Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery System

    The recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.

    Feb 27, 2013

  • SME
    Long term demand for construction raw materials and the implications for minerals provision; the case of sand and gravel in the Netherlands

    By M. van Elp, R. Saitua Nistal, P. J. M. Groot

    Demand for construction raw materials depends on investment in housing, other buildings and infrastructure. The provision of these materials requires early knowledge of future trends in construction i

    Jan 1, 2011

  • SME
    Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal Mining

    By B. Asbury, M. Cigla, C. Balci

    The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel

    Jan 1, 2002

  • SME
    Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined Shaft

    By D. Kruse

    Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov

    Jan 1, 2011

  • SME
    Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 Tunnel

    By S. H. Jason Choi

    The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne

  • SME
    Queens Bored Tunnels, East Side Access, New York

    By David Smith, Bernie Martin

    The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr

    Jan 1, 2005

  • SME
    The HWPT Engineered Membrane Separation® (EMS®) Method Of Copper Recovery From Acid-Minesite-Solutions (AMS) - Preprint 09-042

    By J. A. Lombardi

    Acid-Minesite-Solutions (AMS) are defined as copper-containing pit lake, tailing pond, acid-mine-drainage, and heap and waste dump irrigation solutions. All of these solutions are characterized by co

    Jan 1, 2009

  • SME
    Solid Cast Polymer Tunnel Segments: The Corrosion Resistant Solution for Sanitary Sewer Tunnels

    By Richard A. Cubeta

    Precast concrete segments have been used in sanitary sewer tunnel design for decades. Federal mandates (reduction in heavy metals and I & I), and system design changes (increased retention times) and

    Jan 1, 2008

  • SME
    High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case History

    By Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta

    Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang

    Jan 1, 2005

  • SME
    Earth Pressure Balance Tunneling In Canada

    By Laura McNally

    In 2006, McNally International Inc., in a joint venture partner-ship with Aecon Constructors, was the successful bidder on two York Region Tunnel Projects: the Bathurst Collector/Langstaff Trunk Sewer

    Jan 1, 2008

  • SME
    3D CFD Simulation Of Airflow Re-Distribution And Associated Pressure Drops Inside The Overcast In Underground Coal Mines

    Overcasts are indispensible ventilation control devices to permit one airway to pass over another without mixing in room and pillar coal mining. The airflow distribution inside the overcast depends on

    Feb 27, 2013

  • SME
    Annual Review 2005 – Mining Review

    By P. A. Plunkert, D. E. Morse, L. McCartan, J. F. Papp

    The mineral sector is a fundamental part of the U.S. economy. It contributes to the real gross domestic product (GDP) at several stages —basic (mining), intermediate processing, manufacturing of fini

    Jan 1, 2006