Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mine Evaluation and Investment AnalysisBy Donald W. Gentry
This section deals with one of the most fascinating aspects of mining the evaluation of mine investment opportunities. Be-fore proceeding further, it is important to clarify the meaning of some fundam
Jan 1, 2008
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
1994 Jackling Lecture - Mining Geostatistics - Forty Years Passed. What Lies Ahead?By Jean-Michel Rendu
That you are giving the Daniel C. Jackling award to me is a great personal honor. But more significantly, it is a recognition that geostatistics has come of age. And since I am considered by many as b
Jan 1, 1995
-
Applying Human Factors Engineering To Mining SystemsBy Craig Hartley
? A helper stands beside a continuous miner as the operator is at the controls. The operator means to push the stop button but hits the drum rotation start button by mistake. The drum begins to turn a
Jan 1, 1983
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
Weinbach Soft Ground Tunnel: Lessons LearnedBy Raymond W. Henn, Kent A. Pease, Glen J. Rorison
The paper focuses on construction of a 2.55-km (8,365-ft) long, 2.4-m (8-ft)diameter storm drain tunnel in Evansville, Indiana. The tunnel was driven through saturated soft ground varying from clay to
Jan 1, 2001
-
Energy Dissipation and Fragmentation of Granite Core During High Velocity Impact Mining, Metallurgy and ExplorationBy Ying Lu, Jeffrey C. Johnson, Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada
Energy dissipation and fragmentation of rock is of interest for mine-to-mill operations in order to understand breakage and to minimize energy consumption during blasting at the mine site, and comminu
-
Energy Dissipation and Fragmentation of Granite Core During High Velocity Impact Mining, Metallurgy and Exploration (1de527b1-559a-4ec3-825e-46bd7ac58c2b)By Ying Lu, Jeffrey C. Johnson, Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada
Energy dissipation and fragmentation of rock is of interest for mine-to-mill operations in order to understand breakage and to minimize energy consumption during blasting at the mine site, and comminu
-
Subsidence Monitoring - Case History (0d38711c-ff49-495c-b908-b20ac8ac067d)By Dr. Peter J. Conroy
The current study is part of the U.S. Department of Energy's (DOE) on-going subsidence research program. The long-term objective of the DOE program is to develop analytical methods of subsidence
Jan 1, 1982
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Paradise Peak precious metals mill begins production ahead of schedule and under budgetBy L. J. Buter, D. J. Collins
Introduction FMC's Paradise Peak gold mine was discovered by staff geologists in July 1983. Located south of Gabbs, in western Nevada, the deposit contains about 11 Mt (12 million st) of ore gra
Jan 12, 1986
-
Wireless Access To Live Data From Mining Operations - Anywhere & AnytimeBy R. Heersink, C. H. Wells
Innovations in communications and real-time information systems are providing industry opportunities to improve profitability. Real-time operating data is collected from equipment across a site or ev
Jan 1, 2002
-
Evaluation Of The NEPA Process For Estimating Water Quality Impacts At Hardrock Mine SitesBy Kimberley MacHardy, Ann Maest, Greg Lawson, James Kuipers
Although water quality predictions are often made in Environmental Impact Statements (EIS's) as part of the National Environmental Policy Act (NEPA), comparisons between predicted and actual wate
Jan 1, 2005
-
The application of an improved multi-scale computational modelling techniques to predict fugitive dust dispersion and deposition within and from surface mining operationsThe extraction and processing of minerals from surface mines and quarries can produce significant fugitive emissions as a result of site activities such as blasting, unpaved road haulage, loading, pri
Jan 1, 2009
-
Prediction And Design Control Of Surface Subsidence By Global Simulation Of Mine Behavior Using Finite Element ModeBy Shosei Ph. D Serata
The Stress Control Method of mine design provides enhanced engineering control over the behavior of underground structures in comparison to conventional mine design methods. The same Method can be app
Jan 1, 1986
-
Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) StressesBy John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw
An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac
Jan 1, 1979
-
Geologists Add Value at Newmont’s Nevada Mines – Part TwoBy Wayne Trudel, Eric Saderhold, Lloyd McEvers, Lori Clarke, Charles Lynn Bolin, Leroy Schutz
Editor’s note: This is the second part of a two-part series on how mine geologists added about 141t (4.53 million oz) at Newmont Mining’s gold operations in Nevada during 2003. Part one (ME, July2004
Jan 1, 2004
-
Surface Coal Mine Planning With An Interactive Graphics Personal Computer ProgramBy M. E. Kuchta
Surface coal mine design can be facilitated with the use of an interactive graphics personal computer program. This mineral inventory and planning program (POLY CALC) is described and its use is illus
Jan 1, 1986
-
Computers And The Planning Of Dragline MinesBy Peter N. Calder, J. L. Workman
There are many opportunities for computers to assist in dragline mine planning. Three important areas particularly lend themselves to computer assisted study. These are overall mine design and plannin
Jan 1, 1989