Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blasting Near a CrusherBy Scott G. Giltner, Alex Schwenk
Blasting within 250 ft of a crusher was successfully executed through the application of electronic detonators, 3-D imagery, signature hole analysis, custom loading of blast holes. The blast was well
Feb 1, 2020
-
The Recovery of a Dozer from a Highwall Using BlastingBy Tyler Acorn, Tristan Worsey
A dozer operator at a surface gold mine accidentally drove a D10 off the side of a highwall. The blade of the dozer caught on the lip of a catch bench 60 ft. (18.3 m), down stopping its descent. The o
Jan 1, 2014
-
Investigation of ANFO’s Behavior under Various Conditions - Phase 1By E. Contestabile, B. von Rosen
On August 5th, 1998, a tractor-trailer carrying approximately 18,000 kg of blasting explosives, struck a rock face on the side of the road near the town of Walden, Ontario. Eye-witness accounts of the
Jan 1, 2001
-
Drone Technology Utilization to Increase Safety and Support Analysis for Blasting ProcessBy Ery Wardhana, Stefanus Jagad, Relinda Sanistya, Hasucita Tausi, Rido Situmorang
The blasting process is one of the most high-risk activities in mining operations. Shotfirers and blasting crews face hazards from slope failure, toxic gas and fumes, or unstable ground condition ever
Feb 6, 2023
-
Vibration Control at Long HarbourBy Michael Burrell
This project involved the protection of an historic landfill located on the site. Construction blasting was for a permanent access road to carry traffic to and from a new metal processing plant being
Jan 1, 2012
-
Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable LayerBy Ye Yuan, Jaak Daemen, Shaguo Yuan
ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre
Jan 1, 2010
-
Super Accurate Detonators - A Rockblaster's DreamBy Jan Westberg, Roger Holmberg, Bernt Larsson
Over the last couple of decades there has been an increased demand from the market for precision detonators, partly because of a need for better blasting results and partly because of a need for bette
Jan 1, 1988
-
Distribution of Specific Impulse on Vehicles Subjected to IED'sBy Alexander Hauck, Dimitri Jung, Uli Leiste
This paper describes results from small scale tests conducted to determine the distribution of impulse on target plates when subjected to loading due to the detonation of a buried mine. The tests were
Jan 1, 2010
-
Journal: Fifty Years in Explosive Engineering The Story of a Determined ImmigrantBy Milos Bila
The second half of 2008 and the first half of 2009 brought up important anniversaries. My old passport from Czechoslovakia has a stamp with date 10-10-1968 at 10:00 AM, the exact time I crossed the bo
Jan 1, 2010
-
Safe Blasting Parameters And Seismic Influences During Construction BlastingBy Mario Dobrilovic, Zvonimir Ester, Vinko Skrlec, Vjecislav Bohanek
The first public garage in the city of Dubrovnik has been built in highly urbanized area, on location Ilina Glavica. The excavation of the building pit has been done partly by construction machinery,
Jan 1, 2009
-
Refinements in Blasting Practices at Minntac MineBy B Kniivila, A B. Andrews, T Lerick, Keith Jansen
Minntac Mine is a large, open pit taconite mine located at the center of the Mesabi Iron Range in northern Minnesota. The planned development of the Mine in the direction of nearby communities prompte
Jan 1, 1984
-
The Chemical Kiloton Experiment the Utilization of 50/50 Heavy ANFO at the Nevada Test SiteBy Don Larson, Gordon Coleman
The United States Department of Energy, through its contractor Lawrence Livermore National Laboratory, has entered into a contract with Alpha-IRECO, Inc. for the emplacement of approximately 2.9 milli
Jan 1, 1994
-
Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill &Blast Engineering Focused ProjectsBy Manuel Calderón
Chile is responsible for 30% of the global copper production; the world ́s largest. However, significant challenges are faced in this industry; declining grades (1.13% in 2002 to 0.61% in 2015), high
-
Challenges and Lessons Learned from the Kentucky Lock ProjectBy K. Best, D. Conn
The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic
Jan 1, 2024
-
Hydrogen Peroxide Emulsion (HPE) in Action – Stockholm Sweden Rail Tunnel ProjectBy Johan Hillman, D. Scott Scovira, Thomas Gustavsson, Alexander Bihlar
Hydrogen Peroxide Emulsion (HPE) explosives are an alternative to conventional commercial explosives. HPE does not contain nitrates or ammonia thus eliminating post-detonation NOx fumes and aqueous ni
Jan 26, 2026
-
Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision RegionsBy M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill
This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an
Jan 1, 2017
-
Fewer Surprises When You Measure the SizesBy Tom C. Palangio
Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co
Jan 1, 2016
-
Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo MineBy John Vynne
BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys
Jan 1, 2007
-
Rebuild of a Flash Smelting Furnace Using ExplosivesBy Scott G. Giltner, Terry Millar, Ben Bringhurst
"Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo
Jan 1, 2016
-
Shaking the Bugs at the Center for Disease Control [CDC]By Mick Fritz, Ryan Gilmore
The Center for Disease Control [CDC] is in the midst of a twenty year project, part of which includes demolishing existing buildings and erecting taller, more modern structures within the same foundat
Jan 1, 2008