Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Tailings dam failures need not be disasters — The Thickened Tailings Disposal (TTD) system

    By E. I. Robinsky

    "In light of the recurring spills and failures of conventional tailings disposal pond dams, a brief review of the Thickened Tailings Disposal (TTD) system is presented. It is shown that by the process

    Jan 1, 1999

  • CIM
    The Tramline

    By Peter C. Jones

    Owing to the inadequacy of the ore transport system at Cassiar in the late 1960's, a new facility was required. This paper traces the various alternatives considered and gives a description of th

    Jan 1, 1978

  • CIM
    Quantified Benefits of Automated Loading of Remote-Controlled LHD Vehicles in a Production Environment

    By E. Brouillette

    Difficult operating and mining conditions such as low visibility, difficult roadbeds, fast cycling, small openings, and sharp corners create high demand for LHD manoeuvrability and operator dexterity.

    May 1, 2003

  • CIM
    A Hollow Cylinder Testing Device to Study at Small Scale the Damaged Zone around Underground Openings in Porous Rocks

    By V. Labiouse, F. Orellana

    "Hollow cylinder samples can be tested for both the characterization of rock properties and the physical modelling at reduced scale of engineering applications. Particularly, this type of experimental

    Jan 1, 2015

  • CIM
    Copper EW Processes: State of the Art in Optimizing Current Density Distribution

    By E. P. Wiechrnann, C. M. Castro, G. A. Vidal

    In copper Eta plants the optimal current density setpoint depends on the electrolyte composition and temperature. However, conventional plants operate with large standard deviations. A value of 14% wi

    Jan 1, 2011

  • CIM
    The Bulk Terminal in Today's Traffic Pattern

    By T. G. Phillips

    "This paper gives an inside look at a bulk terminal and describes the preparations that must be made by a company in developing such a terminal and its position in today's traffic pattern. The followi

    Jan 1, 1968

  • CIM
    Slag Freeze Layer Formation In An Electric Smelting Furnace

    By F. J. Guevara

    A two-dimensional mathematical model for fluid flow and heat transfer in a sixin- line electric smelting furnace was developed to study the effects of temperature on slag viscosity in both the liquid

    Jan 1, 2007

  • CIM
    Shrinkage Stopes Adapted for Use in Wide Ore-Bodies at Howey Gold Mines, Limited

    By D. M. MacLean

    THE property of Howey Gold Mines, Limited, is situated at Red Lake, Ontario, one hundred and seventy-five miles east of Winnipeg and eighty miles north of the Canadian National railway. The mine has

    Jan 1, 1938

  • CIM
    Stratigraphic and structural setting of stratabound lead-zinc deposits in southeastern B.C.

    By Trygve Høy

    "Important stratabound lead-zinc deposits in southeastern B. C. occur in rocks that range in age from Proterozoic Helikian to Middle Cambrian. The Sullivan deposit, and similar but smaller deposits in

    Jan 1, 1982

  • CIM
    Triggered Rockbursts and Induced Rockbursts

    By Jian Deng

    Rockbursts are sudden and violent failure of rocks in deep and/or high stress mines, which may destroy the excavation space and cause an accident or even the death of mining workers. This study is mot

    Jan 1, 2015

  • CIM
    Paipote Smelter in a Continuos Process of Optimization

    By O. C. Rojas, J. Sanhueza, J. C. Vargas

    Empresa Nacional de Minería (ENAMI) is dedicated to the promotion of small and mid scale Chilean mining industry. Paipote, ENAMI Copper Smelter, processes a variety of mineral products as the result o

    Jan 1, 2007

  • CIM
    Characteristics of Shrouded Supersonic Jets in Metallurgical Reactor Vessels

    By A. R. Naji Meidani, A. Cameron, A. Richardson, M. Isac, R. I. L. Guthrie

    The supersonic core of shrouded jets remain coherent over longer distances vs conventional supersonic jets. This phenomenon should allow for greater penetration of oxygen into slag/steel reactor syste

    Jan 1, 2004

  • CIM
    Evaluation of Friction Stir Welding for Sheet Metal Resonant Structures

    By L. St-Georges

    In aerospace and transportation industries, severe problems are related to fatigue failure. Aluminium is frequently used in these industries to optimize the solidity and minimise the weight of the str

    Jan 1, 2006

  • CIM
    Understanding Single Particle Breakage Event to Evaluate the Effect of Applied Strain Rate

    By Fatemeh Saeidi, Luis Marcelo Tavares, Malcolm Powell, Mohsen Yahyaei

    "Understanding a single breakage mechanism is fundamental to the development of breakage testing techniques appropriate for mechanistic modelling of any breakage equipment. In the light of this insigh

    Jan 1, 2016

  • CIM
    Effects of Milling Time, Si Content and Heat Treatment on Microstructure and Magnetic Properties of Mechanically Alloyed Fe-Si Powders

    By Madaah Hosseini H. R., P. Abachi, S. Miraghaei

    In this study, the effects of milling time, chemical composition and heat treatment on microstructure and magnetic properties of nanocrystalline Fe-Si (6.5-25 at.% Si) alloys prepared by mechanical al

    Jan 1, 2006

  • CIM
    A Continuum Damage Model to Predict Bit Performance Based on Single Cutter Experiments

    By A. Dahi Taleghani, Amir Shojaei

    A continuum damage mechanics (CDM) based constitutive model has been developed to describe elastic, plastic and damage behavior of rock during drilling. In addition to inelastic deformations, this mod

    Jan 1, 2015

  • CIM
    Effect of Heat Treatment on Linear Friction Welded TI-5553

    By E. Dalgaard

    During linear friction welding of titanium alloy Ti-5A1-5V-5Mo-3Cr (Ti-5553), the weld zone exhibits beta (B) grain refinement and alpha (a) phase depletion that have the combined effect of deteriorat

    Jan 1, 2011

  • CIM
    Transforming Flash Furnace Feed and Burner Stability: Optimizing Furnace Performance and Productivity

    By P. E. Walker, M. E. Reed, R. C. Sims, B. Snowdon, D. E. Fallas

    An advanced Flash Furnace feed system is the key to improving furnace performance. Clyde-WorleyParsons has developed a revolutionary pulseless pneumatic injection feed system technology, capable of de

    Jan 1, 2007

  • CIM
    Process for Integrating Surface Drainage Constraints on Mine Planning

    By Les F. Sawatsky

    Surface drainage, particularly mine closure drainage, must be properly considered during all stages of mine planning because it presents constraints that are critical to economic mine operation, minim

    May 1, 2009

  • CIM
    Aging effects in 319 alloys

    By N. R. Andrade-Gonzalez

    The present work was performed on four alloys containing Al-6 2 wt pct Si-3 5 wt pet Cu, with magnesium in the range of 0.02-0 40 wt pct, and strontium in the range of 0-165 p p m Tensile bars were ca

    Jan 1, 2004